Page 1 SOCIAL ASSESSMENT REPORT $&&(/(5$7('\03'(9(/230(17\032)\030,125\03,55,*$7,21\03352-(&7\0f\03 :(67\03%(1*$/\03 Final Report September 2010 IPP501 v. 3 Page 2 Social Assessment of WBADMI Project Final Report ii CONTENTS SECTION SUBJECT PAGE Section I Introduction 1of 1 - 2 of 1 Section II Social Assessment Study 1 of 2 - 2 of 2 Section III Study Methodology 1 of 3 - 10 of 3 Section IV Socio-Economic and Cultural Profile of West Bengal 1 of 4 – 21 of 4 Section V Minor Irrigation Systems in West Bengal: Challenges and Opportunities 1 of 5 – 46 of 5 Section VI Existing Governance and Operational Arrangements in Respect of Minor Irrigation Development 1 of 6 – 16 of 6 Section VII Stakeholder Analysis 1 of 7 – 13 of 7 Section VIII Lands for Minor Irrigation Facilities 1 of 8 – 7 of 8 Section IX Issues of Significance for the Project 1 of 9 – 2 of 9 Section X Design Elements To Approach The Issues 1 of 10 – 4 of 10 Section-XI Pilot Study 1 of 11 – 16 of 11 Section-XII Plate and Photo Gallery End of the Report Page 3 Social Assessment of WBADMI Project Final Report iii Abbreviations ADMIP - Accelerated Development of Minor Irrigation Project BC - Beneficiary Committee BDO - Block Development Officer BCWD - Backward Classes Welfare Department CI - Cropping Intensity CCA - Culturable Command Area DTW - Deep Tube well DL & LRO - District Land & Land Reform Officer DPD - District Project Directorate DM - District Magistrate EC - Executive Committee FGD - Focused Group Discussion GOWB - Government of West Bengal GP - Gram Panchayat GDI - Gender Development Index GDP - Gross Domestic Product HDTW - Heavy Duty Tube well HDI - Human Development Index IBRD - International Bank for Rural Development IDA - International Development Association IDGI - In Depth Group Interview IPM - Integrated Pest Management INM - Integrated Nutrient Management LDTW - Light Duty Tube well MI - Minor Irrigation MDTW - Medium Duty Tube well MOU - Memorandum of Understanding MLE - Monitoring, Learning and Evaluation Page 4 Social Assessment of WBADMI Project Final Report iv NGO - Non-Government Organization OP - Operational Procedure O&M - Operation and Maintenance OMM - Operation, Maintenance and Management PRI - Panchyati Raj Institution PS - Panchayat Samiti PW - Para Worker PDW - Pump Dug well PRDD - Panchayat and Rural Development Department ROG - Redressal of Grievances RLI - River Lift Irrigation SO - Support Organization SICO - Self Initiated Community Organizer ST - Scheduled Tribe SC - Scheduled Caste SDMP - Scheme Development & Management Plan SHG - Self Help Group SCA - Spout Command Area SSC - Spout Sub-Committee STW - Shallow Tube well SFMIS - Surface Flow Minor Irrigation Scheme TDP - Tribal Development Plan TC - Territorial Constituency TOR - Terms of Reference WUA - Water Users Association WDS - Water Detention Structure WRI&DD - Water Resources Investigation and Development Department WRDD - Water Resources Development Directorate ZP - Zilla Parishad Page 5 Social Assessment of WBADMI Project Final Report 1 INTRODUCTION 1.1 GENERAL West Bengal is on the Eastern part of India, stretching from the Himalayas in the North to the Bay of Bengal in the South. The State has a total area of 88,752 sq km which is 2.7% of the country’s area and a population of 80,176,197 which is 7.86% of the population of India. The present population density being 903 per sq.km is the highest in the country. 1.1.1 Administrative Units The State is divided into three Administrative Divisions and 19 Administrative Districts including Kolkata District, the State capital. The districts of Darjeeling, Jalpaiguri, Coochbehar, Uttar Dinajpur, Dakshin Dinajpur and Malda comes under Jalpaiguri Division while the districts of Murshidabad, Nadia, Howrah, South 24 Parganas and North 24 Parganas and Kolkata (state capital) falls under Presidency Division. The Burdwan Division has its jurisdiction over the districts of Hooghly, Burdhwan, Birbhum, Bankura, Paschim Medinipur, Purba Medinipur and Purulia The Darjeeling Himalayan hill region in the northern extreme of the state belongs to the Eastern Himalayas. The narrow terai region separates the himalayan region from the plains, which in turn transits into the Ganga Delta towards the South. A small coastal region is on the extreme south, while the Sundarban mangrove forests forms a remarkable geographical landmark at the Gangetic delta. The Administrative map of West Bengal is given in Plate 1. 1.2 PROJECT The Government of West Bengal (GoWB) has initiated the Accelerated Development of Minor Irrigation Project (ADMI) with financial assistance from the World Bank. The project development objective is to enhance agricultural production of small and marginal farmers. This would be achieved through accelerated development of minor irrigation schemes, strengthening community-based irrigation management, and support to agricultural development, including provision of agricultural services, encouraging diversification and use of new technologies, facilitating market access, and creating income generating opportunity. The total project cost is estimated at US$300 million, to be financed through a mix of IBRD loan and IDA Credit of US$125 million each (about 83.3 percent of the project costs), with the balance to be financed by the Government. The investments will focus on investments targeted towards: (i) strengthening community-based institutions to assume responsibilities for the management of minor irrigation schemes created under the project; (ii) development of surface and ground water based irrigation systems in 18 of the 19 districts of West Bengal; and (iii) agricultural development and providing improved support services to farmers, including support for enhancing marketability of agricultural produce. Overall, the project is expected to bring 138,901 ha of additional agricultural lands under assured irrigation through developing 4660 Minor Irrigation structures spread over 18 districts. Page 6 Social Assessment of WBADMI Project Final Report 2 1.3 PROJECT BACKGROUND The state of West Bengal is mainly dependant on Agriculture. Minor Irrigation plays a major role in development of agriculture in increasing agricultural productivity, ensuring food security and enhancing rural income and livelihood options there by reducing poverty. Farmers of the state are also aware of it. With their active participation, the cropping intensity has increased from 155% in 1991-92 to 184%in 2007-08 in the state. Considering these aspects, the Government of West Bengal formulated a programme, Accelerated Development of Minor Irrigation Project (ADMIP), to expand irrigation facilities with focus on community managed minor irrigation systems. It is proposed to be achieved by developing various minor irrigation schemes with individual command area ranging from 5 ha to 200 ha by sustainable development and management of surface and ground water resources. Minor Irrigation schemes sustain the interest of wide range of stake holders at various levels starting from different social groups in the village where these are installed. Past experiences indicate that while many schemes run efficiently, many other schemes do not yield expected result and or remain idle due to reasons other than technical in nature. It is important that the schemes should be socially viable and acceptable though it is technically feasible. The project provides to explore the social viability and acceptability of various schemes under it based on the clear understanding of relationships among the various social groups including socially vulnerable groups, particularly SC / ST communities and women and level of their participation. In rural West Bengal, agricultural and allied activities cannot be thought of without women participation. Right from sowing of paddy, a principal crop, to its weeding and harvesting in the field and storing of crops including animal husbandry in the domestic front, every where women play a significant role. But in the planning of such facilities their requirements and expectations are not mostly considered. Scheduled Castes and Scheduled Tribes form a significant part of the population of the state. Growth rate in the development of Agriculture and Minor Irrigation have been significant but these sections of the communities continue to be poorer. Usually Scheduled Tribes settlements are away from that of other communities in a village. They mainly live on Agriculture and Forest. In the matter of Minor Irrigation development their expectations are required to be given more importance. In the light of the above aspects, a Social Assessment study has been taken up to assess the existing social situation in the rural areas of the state through Minor irrigation schemes in Villages of different Agro-Climatic Zones. The aim is to complete the project with the understandings from the studies to ensure over all social development. The study also provides inputs on formulating a Tribal development Plan for their participation in the project. The study would also provide inputs on the participatory implementation of the project at the grass root level, particularly the Panchayat Raj Institutions. Page 7 Social Assessment of WBADMI Project Final Report 3 II. Social Assessment Study 2.1 OBJECTIVES OF THE PROJECT The objective of proposed Social Assessment is to identify the likely social impact in consultation with stakeholders, ensure that the benefits of the proposed project are distributed equitably and sustainably and that adverse impacts, if any, are identified and mitigation measures incorporated in the project design. The specific objectives of the Social Assessment are: ¾ To carry out a socio-economic, cultural and political / institutional analysis to identify potential social impacts of the proposed development of the project. ¾ To identify principal stakeholders, carryout consultations that are well documented and develop institutional framework for transparent and participatory implementation. ¾ Screen the proposed investments and assess whether there will be any adverse social impacts and to determine the applicability of policies relating to involuntary resettlement and Indigenous Peoples policies and ¾ To ensure that results of the Social Assessment provide inputs for participatory implementation. 2.2 IDENTIFICATION AND CONSULTATION WITH STAKEHOLDERS were conducted on matters relating to: · Assessment of potential, social and economic impacts of project design · Identify key social issues and risk relevant to the project · Development of consultation framework for participatory implementations · Developed criteria for social screening of the sub-project proposals. The consultation process led to detailed stakeholders analysis outlining interests, expectations, potentials and implications for project design. These consultations and stakeholder analysis were carried out to provide specific recommendation to avoid/ minimize high social risk (e.g. activities where it is advisable not to proceed), specify the projects social development outcomes, criteria for screening and selection of sub- projects, mechanisms to ensure demand responsiveness and promote community driven developments. 2.3 IDENTIFICATION OF VULNERABLE GROUPS AND THE ROLE OF WOMEN IN THE PROPOSED PROJECT and specific provisions to ensure their proactive participation in the decision making process in the community management of Minor Irrigation systems and associated income generation activities. Vulnerable groups (e.g. women, tribal and landless) within a community and also the tail end farmers are traditionally marginalized from the local decision making for a variety of complex reasons (e.g. caste dynamics, local perspectives on gender based division of labour etc). The consultant examined the issues concerning these vulnerable sections, and recommended strategy in which decision-making was more transparent and vulnerable groups are given more voice in planning, implementation and monitoring of various activities under the project. 2.4 ASSESSMENT OF IMPACTS ON TRIBAL POPULATION AND THE POSSIBLE NEED TO DEVELOP TRIBAL DEVELOPMENT PLAN: The project covers some Page 8 Social Assessment of WBADMI Project Final Report 4 of the Scheduled Tribes (ST) areas of the state. Consultations were carried out with Scheduled Tribe population in the project area. 2.5 INSTITUTIONAL ASSESSMENT AND DEVELOPMENT OF PARTICIPATION FRAMEWORK: The objective of the project is to ensure a long-term sustainability and equitable flow of benefits. So ownership and empowerment of beneficiary groups is a key to success. The SA was conducted, in consultation with local communities, exploring suitable institutional and process mechanisms for enhancing ownership and empowerment of beneficiaries. 2.6 ASSESSMENT OF PHYSICAL AND / OR ECONOMIC DISPLACEMENT CAUSED BY THE PROJECT AND THE development of Resettlement Action Plan (RAP): The project will use approaches that minimize, if not avoid, involuntary land acquisition. The SA was conducted to identify likely physical and/or economical displacement as a result of project interventions. The MI projects do not require such land acquisition as farmers come forward to part with their land as and where required 2.7 LEGISLATIVE AND REGULATORY CONSIDERATION: The consultants undertook a review of all relevant national and state legislation and regulations pertinent to the project as well as broader policy and reform context within which the project comes. SA reviewed the aspects of all the legal and regulatory systems to facilitate programme implementation. The results of the social assessment study are presented in the following sections of the document:- ¾ Section-I: Introduction ¾ Section-II: Social Assessment Study ¾ Section-III: Study Methodology ¾ Section-IV: Socio-Economic and Cultural Profile of West Bengal ¾ Section-V: Minor Irrigation Systems in West Bengal: Challenges and Opportunities ¾ Section-VI: Existing Governance and Operational Arrangements in Respect of Minor Irrigation Development ¾ Section-VII: Stakeholder Analysis ¾ Section-VIII: Lands for Minor Irrigation Facilities ¾ Section-IX: Issues Significant for the Project ¾ Section-X: Design Elements to approach the Issues ¾ Section-XI: Pilot Study ¾ Section-XII: Photo Gallery Page 9 Social Assessment of WBADMI Project Final Report 5 III. STUDY METHODOLOGY 3.1 GENERAL Social Assessment (SA) of any project is a technique to identify the best possible implementation process of the project by analyzing the potential strength and weaknesses of the proposed project through a participatory process involving all stakeholders and enhance the success rate of the project to its optimum and thereby minimize or mitigate risks and adverse effects on the people and area. It also gives direction for project’s future sustainability and ownership by the beneficiaries. The SA tries to evolve a process of people’s participation at every step of the project since its designing to long term maintenance, management and sustainability. In the process it gives birth to community functioning and ways and means of conflict resolutions that may arise during its implementation. The methodology includes collection of both primary and secondary information. The primary data is collected through field surveys carried out in selected sample Minor Irrigation schemes in different Agro-climatic regions of the state. In addition to the survey of the schemes, concerned village surveys and some household surveys were also carried out to obtain characteristics of minor irrigation practices. The secondary data in the information collected from various agencies and is in the form of documents, project reports, census etc. 3.2 SAMPLE MINOR IRRIGATION SCHEMES AND VILLAGES The state of West Bengal is spread over 6 agro-climatic regions. It has 18 districts with 339 blocks excluding the city of Kolkata. It is pertinent to select sample blocks in each district for field survey. The ADMIP Directorate under the Water Resources Investigation and Development Department, Govt. of West Bengal provided a preliminary list of 60 blocks covering all the 18 districts of the state to take up field survey in one scheme in each of those blocks for the Social Assessment study under the project. District wise representative list of sample blocks in different Agro-climatic regions, soil Groups and Hydro geological status are given in Table 3.1 . The Administrative map and Agro- climatic maps are given in Plate 1 & 2 respectively. Page 10 Social Assessment of WBADMI Project Final Report 6 Table 3.1 District Wise list of representative blocks in different agro-climatic regions. Sl. No . District Agro- Climatic Region Soil Group Hydrological Status of the Block Block or part of Block covered by respective Zones No. of Scheme s Recent to subrecent Alluvium Coochbehar - I 1 Recent to subrecent Alluvium Tufanganj - II 1 Recent to subrecent Alluvium Holdibari 1 1 Coochbeh ar Terai Teesta Flood Plain Acidic soils / Sandy Loam Total No. of Schemes: 3 Piedmont Zone Matigara 1 2 Darjeeling Terai Teesta Flood Plain Acidic soils / Sandy Loam Total No. of Schemes: 1 Piedmont Zone Nagarkata 1 Hill Zone Piedmont Zone Madari Hat 1 Recent to Subrecent Alluvium Dhupguri 1 Recent to Subrecent Alluvium Alipurdwar II 1 Recent to Subrecent Alluvium Falakat 1 3 Jalpaiguri Terai Teesta Flood Plain Acidic soils / Sandy Loam Total No. of Schemes: 5 Terai Teesta Flood Plain Acidic soils / Sandy Loam Recent to Subrecent Alluvium Islampur 1 Recent to Subrecent Alluvium Karandighi 1 Recent to Subrecent Alluvium Hemtabad 1 Recent to Subrecent Alluvium Itahar (P) 1 4 Uttar Dinajpur Gangetic Alluvial Zone Alluvial / Sandy Loam Total No of Schemes: 4 Older Alluvium Banshihari 1 Terrai Teesta Flood Plain Acidic soils/Sandy Loam Older Alluvium Tapan 1 Younger Alluvium Gangarampur 1 Younger Alluvium Balurghat 1 5 Dakshin Dinajpur Gangetic Alluvial Zone Alluvial/ Sandy Loam Total No of Schemes: 4 Older Alluvium Bamangola 1 6 Malda Vindhya Alluvial Z Alluvial/ Sandy loam/ L l Older Alluvium Gajol 1 Page 11 Social Assessment of WBADMI Project Final Report 7 Sl. No . District Agro- Climatic Region Soil Group Hydrological Status of the Block Block or part of Block covered by respective Zones No. of Scheme s Zone Loamy clay Recent to Subrecent Alluvium Harishchandrapu r I 1 Recent to Subrecent Alluvium Ratua II 1 Recent to Subrecent Alluvium Kaliachak I 1 Gangetic Alluvial Zone Alluvial/ Sandy loam/ Loamy clay Total No of Schemes: 5 Vindhya Alluvial Zone Alluvial/ Sandy loam/ Loamy clay Older Alluvium Sagardighi 1 Recent to Subrecent Alluvium Lalgola 1 Recent to Subrecent Alluvium Beldanga I 1 Recent to Subrecent Alluvium Raninagar I 1 7 Murshidab ad Gangetic Alluvial Zone Alluvial/ Sandy Loam Total No of Schemes: 4 Recent to Subrecent Alluvium Karimpur I 1 Recent to Subrecent Alluvium Nakashipara 1 Younger Alluvium Haringhata 1 8 Nadia Gangetic Alluvial Zone Alluvial / Sandy Loam Total No of Schemes: 3 Younger Alluvium Bagdah 1 Younger Alluvium Habra I 1 Gangetic Alluviul Zone Alluvial/ Sandy Loam Younger Alluvium Barrackpore I 1 Coastal Saline Tract Minakhan 1 Coastal Saline Tract Sandekhali II 1 9 24 Parganas (N) Coastal Saline Zone Coastal/ Saline/ Loam/ Clay Total No of Schemes: 5 Coastal Saline Tract Kultali 1 10 24 Parganas (S) Coastal Saline Zone Coastal/ Saline/ Loam/ Clay Total No of Schemes: 1 Gangetic Alluvial Zone Alluvial/San dy Loam Younger Alluvium Amta I 1 11 Howrah Total No of Schemes: 1 12 Hooghly Gangetic Alluvial Alluvial/San dy Loam Recent to Subrecent Alluvium Panndua 1 Page 12 Social Assessment of WBADMI Project Final Report 8 Sl. No . District Agro- Climatic Region Soil Group Hydrological Status of the Block Block or part of Block covered by respective Zones No. of Scheme s Recent to Subrecent Alluvium Chinsura-Mogra 1 Younger Alluvium Chanditala I 1 Younger Alluvium Goghat I 1 Younger Alluvium Khanakul II 1 Alluvial Zone Total No of Schemes: 5 Younger Alluvium Ketugram II 1 Coal Belt Faridpur- Durgapur 1 13 Burdwan Gangetic Alluvial Zone Alluvial/San dy Loam Total No of Schemes: 2 Younger Alluvium Bolpur- Santiniketan 1 Vindhya Alluvial Zone Alluvial / Sandy loam / Loamy clay Marginal Strips & Older Alluvium Rampurhat I 1 Marginal Strips & Older Alluvium Nalhati II 1 14 Birbhum Undulating Red Lateritic Zone Weathered Laterite / moorum /Sandy Loam Total No of Schemes: 3 Younger Alluvium Keshpur 1 Older Alluvium & Lateritic Garbeta I 1 Vindhya Alluvial Zone Alluvial / Sandy loam / Loamy clay Younger Alluvium Debra 1 Older Alluvium, Lateritic, Marginal Strip Jhagram 1 Hard Rock Binpur I 1 15 Paschim Medinipur Undulating Red Lateritic Zone Weathered Lateritic/moo rum/Sandy Loam Total No of Schemes: 5 Younger Alluvium Potashpur II 1 Coastal & Saline Tract Tamluk 1 Coastal & Saline Tract Contai I 1 16 Purba Medinipur Vindhya Alluvial Zone Alluvial/ Sandy loam/ Loamy clay Total No of Schemes: 3 Older Alluvium & Lateritic Onda 1 Vindhya Alluvial Zone Alluvial/ Sandy loam/ Loamy clay Younger Alluvium Kotulpur 1 Hard Rock Chhatna 1 Hard Rock Ranibandh 1 17 Bankura Undulating Red Lateritic Zone Weathered Lateritic/moo rum/Sandy Loam Total No of Schemes: 4 Page 13 Social Assessment of WBADMI Project Final Report 9 Sl. No . District Agro- Climatic Region Soil Group Hydrological Status of the Block Block or part of Block covered by respective Zones No. of Scheme s Hard Rock Bagmundi 1 Hard Rock Hura 1 18 Purulia Undulating Red Lateritic Zone Weathered Lateritic/moo rum/Sandy Loam Total No of Schemes: 2 TOTAL IN ALL DISTRICTS 60 Accordingly, a list of 60 MI schemes were identified but the list does not adequately cover the SC/ST habitations. To provide adequate representation for SC/ST habitation and to ensure proper coverage of the sample, consultants and experts from World Bank have suggested inclusion of additional villages comprising of SC/ST habitations. Hence, 109 sample schemes in 89 Blocks covering of 18 districts of the state, representing all regions, including SC/ST habitations have been visited to have an overall glimpse of the beneficiaries, success of the schemes, changes in the economic scenario of the area, migration pattern, availability of other social infrastructures like education, health etc., opportunities and avenue of alternative income and other social issues like women’s participations, planning and implementing process of the scheme, the ownership component of the scheme by beneficiary etc. The list of 109 MI Schemes visited by the Social Assessment Team is given in Table 3.2. Table 3.2 List of MI Scheme visited Sl. No. Name of Districts Name of M.I. Schemes Type of Scheme Maintenance Dalua Dasgir Coochbehar-I Major RLI Department Monjarampur Tufangunj-II PDW Farmers Bosmansingh Haldibari STW Benificiary Chilakhana / Tufangunj-I MDTW Benificiary Dalua Dasgir Coochbehar-I Major RLI Department 1. Coochbehar Monjarampur Tufangunj-II PDW Farmers Niranjanpara, Dhupguri RLI Beneficiary Kodal Kathi STW Beneficiary Jena Para, Kabirajpara, Sen Para I, II, III. Dholabari, Malbazar STW Cluster Beneficiary Debijhora Dhupguri SFMI Beneficiary Dakshin Bhuskadanga Maynaguri Mini RLI Beneficiary Lalitabari / Rajgunj MDTW (Proposed) Uttarmajgram / Mal STW Beneficiary Uttardangapara STW (Proposed) 2 Jalpaiguri Kalabari / Nagrakata Mini RLI Farmers Page 14 Social Assessment of WBADMI Project Final Report 10 Sl. No. Name of Districts Name of M.I. Schemes Type of Scheme Maintenance Mujnai Madarihat WDS Beneficiary Chaparerpar Alipurduar-II STW Beneficiary Deomali / Falakata STW Beneficiary Falash, Phansideyoa Mini RLI Beneficiary Hatiram RLI Department Alokjhari / Kharibari Sprinkler Benificiary Rajajhar / Naxalbari PDG Farmers Bandargach Phansidewa RLI Department 3 Darjeeling Sukna / Matigara WDS Farmers Fulatti, Kaliaganj DTW Department Aliganj Islampur STW Beneficiary Haria Karandighi INWB Farmers Jatapur Hemtabad WHT Farmers 4 Uttar Dinajpur Jamalpur Itahar Major RLI Department Katapukur Bill (Lake), Gangarampur Lift Irrigation from stored water. Beneficiary Gouripara / Banshihari STW Beneficiary Jamalpur / Tapan WHT Farmers 5 Dakshin Dinajpur Paranpur / Balurghat Major RLI Department Mandirpur, Old Malda HDTW Department Musadanga, Bhabanipur, Gajol HDTW Beneficiary Kanchamitha Khari Canal Irigation Beneficiary Khushakhari(Maraghat), Bamongola Canal Irrigation Beneficiary Kahartta Harischandrapur -I STW Beneficiary Gobindopur / Ratua-II Major RLI Department Baliadanga Kalichak-I STW Beneficiary Atgama Gajol SFMI Farmers Bamangola Bamangola SFMI Farmers 6 Malda Kahartta Harischandrapur -I STW Beneficiary Ratanpur, Bendanga I RLI, Major Department Run Bhapta, Bendanga I DTW Department Dighirpar, Raninagar RLI Department Dasturhat, Sagardighi RLI, Major Department 7 Murshidabad Basumati, Niamatpur, Lalgola RLI Department Bhomrapara Haringhata RLI Department Dahakula Karimpur-I RLI Major Department 8 Nadia Uttar Bahirgachha Nakashipara HDTW Department Deara, Malipota Bagda RLI-Mini-II Beneficiary 9 24 Parganas (North) Aira, Habra-I HDTW Department Page 15 Social Assessment of WBADMI Project Final Report 11 Sl. No. Name of Districts Name of M.I. Schemes Type of Scheme Maintenance Mamudpur, Barrackpore-I MDTW Beneficiary Debitala, Minakhan Canal Minor Irrigation Beneficiary Patkulpota, Sandeshkhali Canal Minor Irrigation Ready for Handover Alghara, Baruipur MDTW Department Kerolberia Bhangar-II Major RLI Department 10 24 Parganas (South) Godabar / Kultali WHT Farmers Hatipukur, Masat, Chanditala-I Water Harvesting Tank Beneficiary Tarajit, Kotalpur, Khanakul-II Medium RLI Beneficiary Damodarpur, Goghat Major RLI Beneficiary DTW Multi, Pandua Multi, LDTW Department Basna, Balaragh Watershed Tank Beneficiary 11 Hooghly Debanandapur, Chinsura DTW Department 12 Howrah Ghoshpur, Amta RLI, Major Beneficiary Chakbhabani, Potashpur-II DTW Department Lochubad, Potashpur II HDTW Department Gobardhanpur, Potashpur II LDTW Department Aklabad, Egra-I MDTW Department Barakumarda, Potashpur II HDTW Department Sirkantha Kalagonda Tamluk - I Major RLI Department 13 Purba Medinipur Raghunandanpur Contai - III Major RLI Benificary Amrakuchi, Keshpur MDTW Department Sonadiha, Keshpur MDTW Department Paschim Dharasol, Debra HDTW Department Abdalipur, Debra HDTW Department Kamalapur, Medinipur MDTW Beneficiary Panchkhuri, Medinipur MDTW Department Velaijuri, Jhargram WHT Farmers Nutandihi, Binpur - I WHT Farmers Ghosalband, Garbeta - I INWB Farmers 14 Paschim Medinipur Velaijuri, Jhargram WHT Farmers Gara, Dubrajpur DTW, Minor Department Ramnagar, Ilambazar DTW Department Kharui, Dubrajpur DTW Department Sarparajpur, Lavpur RLI, Major Beneficiary Laldaha, Srineketan Mini RLI Beneficiary 15 Birbhum Mahisadal / Bolpur-Srinikatan RLI & STW Department & Private Page 16 Social Assessment of WBADMI Project Final Report 12 Sl. No. Name of Districts Name of M.I. Schemes Type of Scheme Maintenance Darpasil / Bolpur-Sriniketan WDS & STW Beneficiary & Private Dam Dama / Bolpur-Sriniketan Surface flow Schemes Farmers Amgachi Suri - I Un irrigated - Bhola / Nalhati - I Dug Well Govt. Kutubpur / Rampmhat - I Major RLI Department Mahisadal / Bolpur-Srinikatan RLI & STW Department & Private Bharpeta, Memari I HDTW Department Shankarpur, Memari I LDTW / HDTW Beneficiary Chaupira / Memari-I LDTW Farmer Jot Chaitan / Memari-I LDTW Society Teora / Ketugram-II Dugwell Farmer 16 Burdwan Dhobani / Faridpur-Durgapur WHT Farmer Bonkathi, Bishnupur Mini RLI Beneficiary Hazrapukur, Bishnupur MDTW Department Parasia , Chhatna RLI Department Malpur, Bishnupur HDTW Department 17 Bankura Radhamadhabpur, Bishnupur DTC Department Nildi, Raghunathpur Major RLI Department Solanchi Major RLI Department Belguma, Purulia Dug Well Beneficiary Jambad, Hura SFMI Farmers Kushumtikri Bagmundi SFMI Farmers Belguma, Purulia Dug Well Beneficiary 18 Purulia Jambad, Hura SFMI Farmers Total schemes visited = 109 Map of West Bengal showing approximate location of the sample M.I. scheme is given in Plate 3. 3.3 SURVEY OF VILLAGE AND VISIT TO MI SCHEMES MI Schemes were visited through participatory approaches such as group discussions with beneficiary farmers, walks in the command area, meetings with community level stake holders to assess benefits available from the existing schemes and likely benefits from the proposed schemes. The majority schemes were visited and surveys were carried out during November, 08 to February, 09 and again the remaining was covered in April, 2010. 3.3.1 Stages of Surveys Survey of villages and visit to MI Schemes were conducted in 3 stages and are noted in brief below. Page 17 Social Assessment of WBADMI Project Final Report 13 First Stage: On entering the village in which the sample scheme was situated, the team members met the Gram Panchayat (GP) Member and his / her representatives. They introduced themselves and the project. A brief presentation was made on the project parameters to elicit their issues and expectations on the project. In this informal meeting some detailed information about the village were gathered, particularly, Minor Irrigation scenario in the village based on both surface and ground water was assessed. Constraints, if any, on availability of surface water and ground water in lean months were also understood. The role of Gram Panchayet in the development of the village and its participation in the project were discussed. Second Stage: In this stage, overall status of the village was gauged by conducting cross sectional look through different hamlet in the village. Different sub-groups were identified. Their habits, income level, education, general health and environment, cattle and other physical infrastructure were assessed through participatory discussions. Third Stage: In this stage, command areas of the schemes were physically visited, discussions with beneficiary committees and also beneficiary farmers were held. Information on O&M, water rates, accounting systems, major problems both in respect of O&M and source of water were noted. Discussions with share croppers, agricultural labours, Self Help Groups were also held. 3.3.2 House Hold Survey: House hold survey were carried out to collect information on the Socio-economic profile of general population and also to note minor irrigation practices adopted by them and their expectations for further development. The house hold survey was conducted in 2 districts covering 7 villages. Total house hold covered for the survey was 1211 of which 492 belonged to Scheduled Tribe community. The surveys focused on occupational pattern, education, health, house conditions, employment, income, irrigation practices, cropping strategies during lean months etc. 3.4 CONSULTATIONS 3.4.1 State Level: Consultations and meetings were held with policy making authorities and senior level officials of some line departments and corporations. Their inputs on the programmes under WBADMI project were noted and discussed. Such consultations and meetings were spread over the period of August, 08 – June, 2009. The list of officials consulted includes: 1. Principal Secretary and Engineer in Chief, Department of WRI&D 2. Chief Engineers, WRDD 3. Managing Director, WBSMIC Ltd. 4. Director, Agriculture 5. Officials of BCWD 6. Director, Agril. Marketing 7. Director, Horticulture 8. Director (Distribution), West Bengal State Electricity Distribution Co. Ltd. 9. Professors of Calcutta University 10. Project Director, WBADMIP 11. Officials of Animal Resources Department 12. Officials of Fisheries Department Page 18 Social Assessment of WBADMI Project Final Report 14 13. Officials of Sericulture 14. Director, State Water Investigation Directorate (SWID) 15. Superintending Geologist, SWID 3.4.2 District Level Consultation: In all the 18 districts consultations were held with District Level officials of some line departments and Zilla Parishad members. The salient features of the project were introduced to the Karmadhyakshyas of the Krishi Sech O Samabay Sthayee Samity in the Zilla Parishad (highest tier of the PRI in the district). All matters related with agriculture, Irrigation and Co-operatives in the Districts were discussed in this level and issues are settled. These inputs on the programmes under ADMI Project were noted and discussed apart from discussing with other officials in the districts. The Executive Engineers of both Agri-Irrigation and Agri-mechanical wings of the Water Resources Development Directorate (WRDD) and their Assistant Engineers and others, being the implementing authorities, were consulted from time to time. Such consultations, discussions and meetings were spread over 27.11.2008 to 13.04.2010. The list of officials consulted in the districts includes: · Executive Engineer WRI&DD & SWID · Principal Agriculture Officer · District Magistrate · District Fishery Officer · Sabhadhipati and Mmbers of Zilla Parishad · District Welfare Officer, BCWD · Chief Medical Officer of Health · NGO Functionaries · District Officers of Agro Industries Corporation · Divisional Engineers WBSEDCL · Divisional Engineers, WBSMICL Moreover, District level stake holders’ meetings were organized at the district Head Quarters in Bankura and Jalpaiguri District (two of the tribal dominated districts of the state). The most important objective of the consultation was to assess community willingness towards O&M. Members of Beneficiary Committee, SHGS, Community based organizations and representatives of civil society and functionaries from ITDP, WRD Directorate, Agriculture, Fishery, Forest, Revenue etc. participated in the consultation during the meeting. 3.4.3 Block Level Consultations: Panchayat Samity, the middle tier of the three tiers PRI, operates its activities at the block level. The Sabhapati of the Samity, its Executive officer, Agriculture Officer, Sub- Assistant Engineers in the BDO Office particularly of WRDD were consulted in the time span of December, 08 – March, 09. They were apprised of the elements of the ADMI Project. Their inputs were noted and discussed. 3.4.4 Village Level Consultation Village level consultations were made in 109 villages covering all 18 districts of the state except Kolkata. In the village level consultation it is reflected that, the Pradhan of the Gram Panchyat co-ordinates the implementation of different Infrastructure Development Page 19 Social Assessment of WBADMI Project Final Report 15 Programme including tribal areas. The tribal people express their views for their development in both financially and socially in this body. Page 20 Social Assessment of WBADMI Project Final Report 16 IV. SOCIO-ECONOMIC AND CULTURAL PROFILE OF WEST BENGAL 4.1 SOCIO-ECONOMIC PROFILE OF THE STATE 4.1.1 Introduction West Bengal is on the eastern bottleneck of India, stretching from the Himalayas in the north to the Bay of Bengal in the south. The Darjeeling Himalayan hill region in the northern extreme of state belong to the Eastern Himalayan. The narrow Terai region separates this region from the plains, which in turn transitions into the Ganges delta towards the south. The Rarh region intervenes between Ganges delta in the east and western plateau and high lands. A small coastal region is on the extreme south, while the Sundarbans mangrove forests form a remarkable geographical landmark at the Ganges delta. The state is bounded by Latitude 1 3 21 0 ¢ North to 1 3 27 0 ¢ North and Longitude 0 2 5 4 85 0 ¢ ¢ ¢ East to 3 5 89 0 ¢ East. It is bordered by Nepal and Bangladesh and the states of Orissa, Jharkhand, Bihar, Sikkim and Assam in different directions. The Administrative map of West Bengal is given in Plate 1. The state is divided into three Administrative Divisions and 19 Administrative Districts including Kolkata District, the state capital. The Districts of Darjeeling, Jalpaiguri, Coochbehar, Uttar and Dakshin Dinajpur and Malda comes under Jalpaiguri Division while the districts of Murshidabad, Nadia, Howrah, North & South 24 Parganas and Kolkata (state capital) falls under Presidency Division. The Burdwan Division has its jurisdiction over the districts of Hooghly, Burdwan, Birbhum, Bankura, Paschim and Purba Medinipur and Purulia. The state is divided into 3 Agro-climatic Regions, viz, Eastern Himalayan Region (Zone- II), Lower Gangetic Plain Region (Zone-III) and Eastern Plateau and Hill Region (Zone VII) as classified by Planning Commission, Govt. of India. 4.1.1.1 Demographic Profile As per 2001 Census, the total population of the state is 80.176 million when compared to 68.078 million in 1991 registering a decadal (1991-2001) growth rate of 17.8%. The density of population in the state is 903 persons per sq.km. in 2001, as against 767 in 1991 and 615 in 1981. Out of total population of 80.176 million in 2001, rural population accounts for 57.748 millions contributing to 72% of the total population. The urban population is only 28% of the total population in 2001. The state witnessed an overall growth rate of 17.8% during 1991-2001 which is almost 17% below the national average growth rate of 21.34%. The growth rate of rural population in the same period was 21.5% which is almost 13% more than the national average rural population growth rate of 19% in 1991-2001. Table 4.1 presents the comparison of population growth in West Bengal and the country during the last decade. Table 4.1: Comparison of Population Growth - India and West Bengal 1991 2001 Parameters India West Bengal India West Bengal Total Population Millions 838 68.078 1025 80.176 Page 21 Social Assessment of WBADMI Project Final Report 17 Rural Population Millions 622 49.370 740 57.748 Population growth rate - Total % 23.85 24.73 21.34 17.77 Population growth rate - Rural % 20.01 23.00 19.00 16.97 Source: Primary Census Abstract Volume 1, West Bengal (Census of India, 2001) 4.1.1.2 Growth of Rural Population The rural population as a percentage of the total population has been consistently declining. In 1901, the rural population was 88.50% of the total population. This had declined to 76.08% in 1951. The declining trend continued in the post-independence period and in 2001 is at 72% of the total population. 4.1.1.3 Sex Ratio The important indicator for measuring the extent of gender equity at a given point of time is sex ratio. In 2001 census, the sex ratio of total population in the state has improved to 934 from 917 recorded in 1991. The ratio has improved both in rural and urban areas of the state during the decade. In rural areas it has increased from 940 to 950 while in urban areas it has increased from 858 to 893. Among the districts, the highest sex ratio has been recorded in Paschim Medinipur (961) while Howrah has the lowest sex ratio of 906 in 2001 census. District wise sex ratio is given in Table 4.2. Table - 4.2: District wise sex ratio, West Bengal as per Census 2001 Source: Census 2001 and 1991 The sex ratio among the scheduled castes population for the state has also increased from 931 in 1991 to 949 in 2001. Hooghly district has the highest sex ratio for the scheduled castes (977) whereas South 24 Parganas has the lowest (937) as per census 2001. Among the scheduled Tribes population, the sex ratio has increased from 964 in 1991 to 982 in 2001. At the district level, the highest sex ratio of Scheduled Tribes population has been noted in Hooghly (1011) and Coochbehar with 917 has the lowest. 4.1.1.4 Birth and Death Rate The Birth Rate of the state as per Report of Ministry of Health and Family Welfare, Govt. of India was 20.7 in 2000 as against the all India level of 25.8. Sex Ratio Sex Ratio Sex Ratio Sl. No. District 1991 2001 Sl. No . District 1991 2001 Sl. No . District 1991 2001 1. Darjeeling 913 937 8. Birbhum 946 950 15. Paschim Medinipur 939 947 2. Jalpaiguri 927 942 9. Burdwan 848 922 16. Purba Medinipur 948 961 3. Coochbehar 934 949 10. Nadia 935 946 17. Howrah 881 906 4. U. Dinajpur 920 938 11. 24 Parganas (North) 907 926 18. 24 Parganas (South) 929 937 5. D. Dinajpur 944 951 12. Hooghly 917 947 19. State 917 934 6. Malda 938 948 13. Bankura 951 952 7. Murshidaba d 943 952 14. Purulia 946 954 Page 22 Social Assessment of WBADMI Project Final Report 18 The Death Rate in the state as per the same report was 7.0 as against the all India level of 8.5. The Birth and Death Rates of some states are given in Table 4.3 . Table - 4.3: Birth and Death Rate in selected states-2000 Sl. No. States Birth Rate / 1000 Death Rate / 1000 1. India 25.8 8.5 2. Andhra Pradesh 21.3 8.2 3. Assam 26.9 9.6 4. Bihar 31.9 8.8 5. Gujarat 25.2 7.5 6. Haryana 26.9 7.5 7. Karnataka 22 7.8 8. Kerala 17.9 6.4 9. Madhya Pradesh 31.4 10.3 10. Maharashtra 21 7.5 11. Orissa 24.3 10.5 12. Punjab 21.6 7.4 13. Rajasthan 31.4 8.5 14. Tamil Nadu 19.3 7.9 15. Uttar Pradesh 32.8 10.3 16. West Bengal 20.7 7 Source: Ministry of Health and Family Welfare, Govt. of India. 4.1.1.5 Profile of Scheduled Castes Population The Scheduled Castes population of the state has increased from 16.1 million in 1991 to 18.5 million in 2001. In percentage terms it has decreased marginally from 23.6% in 1991 to 23.01% in 2001. Among the states and union territories, West Bengal has third highest population of scheduled castes in percentage terms. Among the districts, highest proportion of Scheduled Castes population to total population in 2001 census has been recorded in Coochbehar district (50.1%) followed by Jalpaiguri (36.7%). Both in 1991 and 2001 Census, Coochbehar district has the highest proportion of Scheduled Castes population among all the districts of the country. The lowest percentage of Scheduled Castes population has been reported in Murshidabad (12%). Percentage of Scheduled Castes population is more than 10% in 2001 in all the districts except Kolkata. 4.1.1.6 Profile of Scheduled Tribes Population The Scheduled Tribes population in the state has increased from 3.8 million in 1991 to 4.4 million in 2001 constituting 5.5% of the total population. Among the districts, Jalpaiguri has the highest proportion of 18.9% of Scheduled Tribes population, followed by Purulia (18.3%) and Dakshin Dinajpur (16.1%). Howrah has the lowest percentage of Scheduled Tribes population at 0.4%. Page 23 Social Assessment of WBADMI Project Final Report 19 Comparison of SC/ST population in India and West Bengal is given in Table 4.4 . Table 4.4 : Comparison of SC and ST Population - India and West Bengal Parameters India West Bengal Population (SC + ST) 530,422,415 22,859,349 Population growth rate (Decadal) 19.08 15.07 Sex ratio 946 934 % of SC population (1991) 16.48 23.62 % of ST population (1991) 8.08 5.59 % of SC population (2001) 23.015 % of ST population (2001) 5.496 Source - Primary Census Abstract Volume 1, West Bengal (Census of India, 2001) 4.1.2 Economic Profile: 4.1.2.1 Work Participation Rate (WPR): The work participation rate is defined as the proportion of total workers (i.e., main and marginal workers) to total population. In the state, 29.5 million population forming 36.8 percent of the population have been returned as workers in 2001 against 21.9 million (32.2 percent) in 1991. The state has, thus, recorded increase in the number as well as percentage of workers in 2001. Among the districts, Bankura with 44.7 percent accounts for the highest overall work participation rate followed closely by Purulia 44.5 percent. South 24 Parganas with 32.5 percent has the lowest work participation rate in 2001 Census. 4.1.2.2 Male Female Work Participation Rate: The overall male work participation rate at the state level is 54.0 percent. The corresponding percentages for the Scheduled Castes and Scheduled Tribes are 54.4 percent and 53.8 percent respectively. At the state level, 7.1 million females (18.3 percent) have been recorded as workers in 2001. The corresponding percentages of female workers in case of Scheduled Castes and Scheduled Tribes are 22.3 percent and 43.7 percent respectively. The female work participation rate has increased from 11.3 percent in 1991 to 18.3 percent in 2001. The difference in male – female work participation rates has marginally narrowed down from 40 percentage points in 1991 to 36.7 percentage points in 2001 Census. 4.1.2.3 Main and Marginal Workers Out of the total workers in the state, 23 million accounting for 78.1 percent are main workers and 6.5 million (21.9 percent) are marginal workers. In absolute terms, the number of main workers has increased from 20.6 million in 1991 to 23.0 million in 2001. However, the proportion of main workers has decreased from 93.9 percent in 1991 to 78.1 percent in 2001. The sharp decline in the proportion of main workers is due to increase in the proportion of marginal workers which may be for improved netting of marginal workers in 2001. The decline is discernable in case of both male and female main workers. For males, it has declined from 98.6 percent to 87.1 percent and females from 70.8 percent to 49.7 percent. Page 24 Social Assessment of WBADMI Project Final Report 20 The state has registered a considerable increase in number of marginal workers from 1.3 million in 1991 to 6.5 million in 2001. Overall the proportion of marginal workers among persons, males as well as females, has increased from 6.1 percent, 1.4 percent and 29.2 percent in 1991 to 21.9 percent, 12.9 percent and 50.3 percent in 2001 respectively. This may be attributed to a better coverage of paid or unpaid work in farm and family enterprises in 2001 Census. In case of the Scheduled Castes, though absolute main workers have increased during 1991 to 2001, their proportion has declined from 31.1% to 28.7% in 2001. Among the Scheduled Castes males also, the percentage main workers has declined from 51.3% in 1991 to 46.1% in 2001. However, among females the proportion has increased from 9.4% to 10.3%. The corresponding increase in the marginal workers is sharp from 0.8% to 8.3% for males and 3.8% to 12% for females during 1991 – 2001. Contrary to the rising trend in total and the Scheduled Castes population, main workers among the Scheduled Tribes have registered a decline both in terms of absolute numbers and percentages. The percentage of main workers among the Scheduled Tribes has declined from 43.1% in 1991 to 32% in 2001. Similar decline has been noted among the males from 52.6% to 42.1% and among females from 33.3% to 21.8% during 1991 – 2001. There has been corresponding increase in the percentage of the Scheduled Tribes marginal workers from 4.6% in 1991 to 16.7% in 2001. The increase is very sharp among the Scheduled Tribes female marginal workers from 7.7% to 21.9% while among males it increased from 1.5% to 11.6% during 1991 – 2001. The WPR related to 1991 and 2001 census is presented in Table 4.5 . Page 25 Social Assessment of WBADMI Project Final Report 21 Table 4.5: Size of Work Force and Work Participation Rates in West Bengal No. of workers and non- workers (in million) % of workers and non- workers to total population Category 1991 2001 1991 2001 No. of workers 21.9 29.48 32.2 36.8 (i) Main 20.58 23 30.23 28.69 (ii) Marginal 1.33 6.5 1.97 8.10 Non-workers 46.16 50.69 67.78 63.23 Total Population 68.10 80.17 100 100 WPR (Male) 26.81 27.92 51.41 54 WPR (Female) 5.38 8.85 11.23 18.3 WPR (Total) 32.19 36.77 32.15 36.77 Source: Census 2001 4.1.2.4 Per Capita Income: West Bengal is the fourth largest populated state in the country and its density of population is highest. Despite of the pressure of population, the state has managed to raise its per capita income owing to massive investment plans in sectors like steel, real estate, power, retail and IT. The average income per person was recorded at Rs. 20,896 in 2003-04, as per Report of Development and Planning Department, Govt. of West Bengal. 4.1.2.5 Poverty Levels: The estimates of poverty made by the union planning Commission in 1999-2000 show that 27.02% of the state’s population lives below the poverty line against the all India average of 26.10%. In Rural Area 31.85% and in Urban Area 14.86% of the respective population of the state live below poverty line as per the same estimate. The status of poverty in the state has improved significantly as evident from the table presented below. It could manage the negative gap from that of national average due to steady growth in the state. Table - 4.6: Trend of Population Below The Poverty Line States 1973-74 1977-78 1983 1987-88 1993-94 1999-2000 2004-05 (at URP)* West Bengal Rural 73.1% 68.3% 63.1% 48.3% 40.8% 31.9% 28.6% West Bengal Total 63.4% 60.5% 54.9% 44.7% 35.7% 27% 24.7% India Rural 56.4% 53.1% 45.7% 39.1% 37.3% 27.1% 28.3% India Total 54.9% 51.3% 44.5% 38.9% 36% 26.1% 27.5% Source: Planning Commission, Govt. of India * Calculated from Uniform Reference Period Distribution of NSS 61 Round of Consumer expenditure. 4.1.2.6 Human and Gender Development Index: The Human Development Index (HDI) for West Bengal stands at 0.61 as compared to 0.59 for India. Relative position of the state with National average in respect of various parameters is presented in Table 4.7. Table 4.7: Relative Position of West Bengal and India Page 26 Social Assessment of WBADMI Project Final Report 22 Indicators Ref. Year India West Bengal Decadal Pop. Growth Rate (%) 1991-2001 21.34 17.8 Sex Ratio 2001 933 934 Literacy Rate (%) 2001 65.38 68.6 Work Participation Rate (%) 1991 37.46 36.8 Poverty Rate (%) 2000 26.1 27 Life Expectancy at Birth (Years) 2001-2005 62.3(M) 63.9(F) 63.9(M) 65.5(F) Infant Mortality Rate (Per 000) 2001 58 38 Death rate (Per 000) 2001 7 Birth Rate (Per 000) 2001 20.7 Kerala HDI 2006 0.61 0.64 0.76 GDI 2006 0.59 0.62 0.75 Source - 1. Primary Census Abstract , WB Volume - 1 4.2 PROFILE OF THE DISTRICTS The state of West Bengal has now (2010) 19 districts including Kolkata which is completely urban. However, during independence, the state was formed with 14 districts. Coochbehar became a district of the state from the princely state of Coochbehar on 19 th January 1950. Puruila district was formed on 1 st November 1956 from parts of the Manbhum district of Bihar. Later three large districts were divided into smaller districts. On 1 st March 1986 the district of 24 Parganas was bifurcated into two districts, North and South 24 Parganas. On 1 st April, 1992, the West Dinajpur District was splitted into North and South Dinajpur. On 1 st January 2002, Medinipur was bifurcated into Purba and Paschim Medinipur. Chandernagore, a part of French India, became a part of Hooghly district on 2 nd October 1954. 4.2.1 Demographic Profile – Growth rate and Composition of Rural Population All the 18 districts (leaving Kolkata being entirely urban) have recorded a positive growth (more than 9%) of rural population during 1991 – 2001. 6 districts experienced higher growth rate than the state average of rural growth rate of 16.97%. Uttar Dinajpur has recorded highest growth of 23.44% followed by Malda (19.64%), Dakshin Dinajpur (18.37%), Nadia (17.79%), Murshidabad (17.30%) and Darjeeling (16.98%). The Burdwan district has recorded the lowest growth (9.68%) followed by Hooghly (10.65%). Remaining 10 districts have recorded growth rate ranging between 11.18% and 16.78%. The districts of Malda, Bankura, Birbhum and Coochbehar have the highest proportion of rural population to total population at 92.68%, 92.63%, 91.43% and 90.90% respectively. The rural population to total population in 13 of 18 districts is higher than that of state average of 72%. North 24 Parganas have recorded the lowest proportion at 45.70% closely followed by Howrah at 49.64%. Such proportions in remaining 3 districts are between 63.06% and 67.65%. The district wise growth rate and composition is presented in Table 4.8. Page 27 Social Assessment of WBADMI Project Final Report 23 Table 4.8: District wise Growth Rate and Comparison of Rural Population, 2001 Population % of population Sl. No. Name of District Total population Growth rate (%) SC ST SC ST 1 Darjeeling 1088740 16.98 207422 178878 19.05 16.43 2 Jalpaiguri 2794291 16.18 1124404 625585 40.24 22.39 3 Coochbehar 2253537 11.18 1197449 13136 53.14 0.58 4 Uttar Dinajpur 2147351 23.44 623649 122110 29.04 5.69 5 Dakshin Dinajpur 1306324 18.37 397599 236271 30.44 18.09 6 Malda 3049528 19.64 518987 224698 17.02 7.37 7 Murshidabad 5133835 17.30 610729 73202 11.90 1.43 8 Birbhum 2757002 15.63 830700 19612 30.13 0.71 9 Burdwan 4348466 9.68 1384945 347072 31.85 7.98 10 Nadia 3625308 17.79 1128190 101911 31.12 2.81 11 24 Parganas North 4083339 13.02 1208661 168686 29.60 4.13 12 Hooghly 3354227 10.65 981740 198486 29.27 5.92 13 Bankura 2957447 13.01 943745 329080 31.91 11.13 14 Purulia 2281090 11.68 408706 456573 17.92 20.02 15 Purba Medinipur 4051232 11.33 592762 23797 14.63 0.59 16 Paschim Medinipur 4575651 14.36 860371 750518 18.80 16.40 17 Howrah 2121109 11.34 465837 8543 21.96 0.40 18 24 Parganas South 5820469 14.88 2039029 79208 35.03 1.36 Source - District Statistical Hand book 2005, Bureau of Applied Economics and Statistics, GOWB Among the districts, the Scheduled Caste population with respect to the district rural population ranges from 11.90% in Murshidabad district to as high as 53.14% in Coochbehar district. The Scheduled tribe population in the rural areas of the districts varies from as high as 22.39% in Jalpaiguri district closely followed by 20.02% in Purulia, 18.09% in Daksin Dinajpur, 16.43% in Darjeeling and 16.40% in Paschim Medinipur districts to as low as 0.40% in Howrah, 0.28% in Coochbehar and 0.71% in Birbhum districts. Out of the 18 districts, 13 districts have recorded high proportion of Rural Population to total population ranging from 78.73% to 92.68%. Such figures against the districts are given below in Table 4.9 Table 4.9: District wise comparison in the Proportion of Rural to total Proportion Sl. No. District Proportion of Rural to total population 1. Malda 92.68% 2. Bankura 92.63% 3. Birbhum 91.43% 4. Coochbehar 90.90% 5. Purulia 89.93% 6. Medinipur (Combined) 89.76% Page 28 Social Assessment of WBADMI Project Final Report 24 Sl. No. District Proportion of Rural to total population 7. Uttar Dinajpur 87.94% 8. Dakshin Dinajpur 86.90% 9. Murshidabad 87.51% 10. 24 Parganas (South) 84.27% 11. Jalpaiguri 82.16% 12. Nadia 78.73% 13. Darjeeling 67.65% 14. Hooghly 66.53% 15. Burdwan 63.06% 16. Howrah 49.64% 17. 24 Parganas (North) 45.70% District wise geographical area and population characteristics are presented in Table 4.10 . Table 4.10: District wise Geographical Area, Population and Population Density Population Sex Ratio Sl. No. Name of District Geo- graphical Area (Sq. Km.) Male Female Population Density (per sq km) Total General Scheduled Caste (SC) Scheduled Tribe (ST) 1 Darjeeling 3149 830644 778528 511 100 71.2 16.1 12.7 2 Jalpaiguri 6227 1751145 1650028 546 100 44.4 36.7 18.9 3 Coochbehar 3387 1272094 1207061 732 100 49.3 50.1 0.6 4 Uttar Dinajpur 3140 1259737 1182057 778 100 67.2 27.7 5.1 5 Dakshin Dinajpur 2219 770335 732843 677 100 55.1 28.8 16.1 6 Malda 3733 1689406 1601062 881 100 76.3 16.8 6.9 7 Murshidabad 5324 3005000 2861569 1102 100 86.7 12 1.3 8 Nadia 3927 2366853 2237974 1173 100 67.9 29.7 2.5 9 Birbhum 4545 1546633 1468789 663 100 63.8 29.5 6.7 10 Bankura 6882 1636002 1556693 464 100 58.4 31.2 10.4 11 Purulia 6259 1298078 1238438 405 100 63.4 18.3 18.3 12 Burdwan 7024 3588376 3307138 982 100 66.6 27 6.4 13 Hooghly 3149 2589625 2452351 1601 100 72.2 23.6 4.2 14 Purba Medinipur 4295 2268323 2149053 1028 100 93.08 6.65 0.28 15 Paschim Medinipur 9786 2648120 2545290 531 100 79.48 11.25 9.27 16 Howrah 1467 2241898 2031201 2913 100 84.1 15.4 0.4 17 24 Parganas North 4094 4638756 4295530 2182 100 77.2 20.6 2.2 18 24 Parganas South 9960 3564993 3341696 693 100 66.7 32.1 1.2 Source: District Statistical Handbook, Bureau of Applied Economics &Statistics & Census 2001 4.2.2 Literacy Rates Page 29 Social Assessment of WBADMI Project Final Report 25 The highest literacy rate in rural areas in 2001 has been recorded in Purba Medinipur district (80.2%) followed by North 24 Parganas (78.1%), Howrah (77%), Hooghly (75.1%). All the districts except four, Uttar Dinajpur (47.9%), Malda (50.3%), Murshidabad (54.3%) and Purulia (55.6%), have recorded a literacy rate of more than 60%. The literacy rate among rural males of West Bengal is 75.04% whereas it is 55.93% among rural females. In the case of males, Purba Medinipur tops with a literacy rate of 89.1%, followed by 24 Parganas North 83.9%, Howrah 83.2%, Hooghly 82.6%, Paschim medinipur 81.3%, Darjeeling 80.1%. The districts of Uttar Dinajpur (58.4%), Malda (58.8%) and Murshidabad (60.7%) are at the bottom in terms of male literacy rates. In the literacy rate among rural females of the districts, 24 Parganas North (71.7%), Purba Medinipur (70.7%), Howrah (70.3%) are at the top. The lowest rates are recorded in Uttar Dinajpur (36.5%), purulia (36.5%), Murshidabad (47.6%) and Bankura (49.4%). 4.2.3 Sex Ratio Sex ratio has not crossed the figure of 1000 in any of the 18 districts. Only 5 districts recorded sex ratio above 950, 15 districts recorded a sex higher than the state average (934). The remaining 3 districts recorded a sex ratio lower than that of state average. The districts of Paschim Medinipur (961), Purulia (954), Bankura (952), Murshidabad (952), Dakshin Dinajpur (951) and Birbhum (950) recorded the highest sex ratio, while Howrah (906), Burdwan (922) and 24 Parganas North (926) recorded low sex ratio. The literacy rates and sex ratio is presented in Table 4.11 . Table 4.11: District wise Rural Literacy and Sex Ratio Total Literacy Rate Literacy Rate 2001 Sex Ratio Sl. No. Name of District 1991 2001 Male Female LDR 1991 2001 1 Darjeeling 57.95 71.8 80.1 62.9 0.785 913 937 2 Jalpaiguri 45.10 62.9 72.8 52.2 0.717 927 942 3 Coochbehar 45.80 66.3 75.9 56.1 0.739 934 949 4 Uttar Dinajpur 34.60 47.9 58.4 36.5 0.625 920 938 5 Dakshin Dinajpur 46.40 63.6 72.4 54.3 0.750 944 951 6 Malda 45.10 50.3 58.8 41.3 0.702 938 948 7 Murshidabad 38.28 54.3 60.7 47.6 0.784 943 952 8 Birbhum 48.60 61.5 70.9 51.6 0.727 946 950 9 Burdwan 61.88 70.2 78.6 61.0 0.776 848 922 10 Nadia 52.53 66.1 72.3 59.6 0.824 935 946 11 24 Parganas North 66.80 78.1 83.9 71.7 0.854 907 926 12 Hooghly 66.80 75.1 82.6 67.2 0.813 917 947 13 Bankura 52.00 63.4 76.8 49.4 0.643 951 952 14 Purulia 43.30 55.6 73.7 36.5 0.495 946 954 15 Purba Medinapur 74.00 80.2 89.1 70.7 0.793 939 947 16 Paschim Medinapur 65.40 70.4 81.3 59.1 0.726 948 961 Page 30 Social Assessment of WBADMI Project Final Report 26 17 Howrah 67.60 77.0 83.2 70.1 0.842 881 906 18 24 Parganas South 55.10 69.4 79.2 59.0 0.744 929 937 Source - Primary Census Abstract Volume 1, West Bengal (Census of India, 2001) 4.2.4 Economic Profile – Work Force Participation Rates and Composition. The census of India 2001 reflects that in the state of West Bengal, the rural working population is 37.90% of the rural population of which 73.58% are main workers and 26.42% are marginal worker. The Work Force Participation Rate (WFPR) in rural areas is higher than that of the state average in 10 districts while it is lower in 7 districts. In the calculation Purba and Paschim Medinipur have been considered as one district (Medinipur). In respect of WFPR, Purulia district tops the list with 46.21% followed by Bankura (45.57%), Dakshin Dinajpur (42.13%), Malda (41.45%), Medinipur, Purba and Paschim combined (39.94%). The WFPR is lowest in 24 Parganas South (32.57%) followed by Howrah (33.39%), Murshidabad (33.47%) and 24 Parganas North (33.64%). Agricultural labourers constitute 31.48% of total rural workers in the state. This followed by cultivators who form almost 25% of total rural work force. Other workers are the major working groups in rural West Bengal forming more than 43%. In 7 districts, proportion of cultivators is higher than that of state average. The district of Dakshin Dinajpur has the highest ratio (34.36%) followed by Purulia (33.33%), Bankura (32.56%), Coochbehar (30.96%), Medinipur combined (30.31%) and Uttar Dinajpur (28.99%). The Howrah district accounts for only 10.21% followed by 24 Parganas South 19%, Burdwan (20.67%), Hooghly (21.11%) and 24 Parganas North (21.21%). Other districts account for more than 25%. In 7 districts, proportion of rural agricultural labourers to total rural workers is higher than that of state average (31.48%). Burdwan has the highest agricultural labours (41.91%) followed by Dakshin Dinajpur (40.02%), Birbhum (39.68%), Purulia (38.37%), Bankura (37.18%) and Hooghly (34.14%). The lowest proportion is found in Howrah district with only 10.18% followed by Darjeeling with 10.24%, 24 Parganas North with 13.62%. Other districts have more than 20%. The work force participation rates and the composition are presented in Table 4.12, 4.13 and 4.14. Page 31 Social Assessment of WBADMI Project Final Report 27 Table 4.12 : District wise Rural Work Force Composition, 2001 Work Force participation rate 2001 - % Composition of work force (%) 2001 Sl. No. Name of District Main Workers Marginal Workers Non- workers Cultivators Agricultural Labourers HH Industries Other Workers 1 Darjeeling 29.8 5.6 64.6 15.5 10.2 2.8 71.5 2 Jalpaiguri 30.1 8.2 61.7 20.7 17.7 2 59.6 3 Coochbehar 30.4 8.6 61 37.4 29.5 4.1 29 4 Uttar Dinajpur 29.3 9 61.7 29.6 39.7 3.7 27 5 Dakshin Dinajpur 31.4 9.4 59.2 31 36.2 4.9 27.9 6 Malda 29.4 11.4 59.2 20.8 30.7 15.6 32.8 7 Murshidabad 28.5 5.7 65.8 18.7 28 20.4 32.9 8 Birbhum 27.6 9.8 62.6 23.1 36.9 6.5 33.5 9 Burdwan 27.6 8 64.4 14.8 29.9 4.9 50.4 10 Nadia 30.5 4.6 64.9 19.8 23.3 11.4 45.5 11 24 Parganas North 29.4 4.1 66.5 10.1 13.6 4.4 71.9 12 Hooghly 30.3 6.6 63.1 14.9 24.3 5.2 55.6 13 Bankura 29.6 15.1 55.3 30.8 35.3 5.8 28.1 14 Purulia 25.4 19 55.6 31.3 36 7.5 25.2 15 Purba Medinipur 24.06 12.6 63.34 25.67 27.4 7.01 39.92 16 Paschim Medinipur 28.25 12.79 58.96 29.99 35.12 7.69 27.2 17 Howrah 28.7 5 66.3 5.2 10.2 11.5 73.1 18 24 Parganas South 24.3 8.2 67.5 16.2 26 6.1 51.7 Source - Primary Census Abstract Volume 1, West Bengal (Census of India, 2001) . Page 32 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 2 8 S o u r c e - P r i m a r y C e n s u s A b s t r a c t V o l u m e 1 , W e s t B e n g a l ( C e n s u s o f I n d i a , 2 0 0 1 ) T a b l e 4 . 1 3 : D i s t r i c t - w i s e f i g u r e s o n M a i n a n d M a r g i n a l W o r k e r s T o t a l W o r k e r s M a i n W o r k e r s M a r g i n a l W o r k e r s S l . N o . N a m e o f t h e D i s t r i c t C u l t i v a t o r s A g r i c u l t u r a l L a b o u r e r s H o u s e h o l d I n d u s t r y W o r k e r s O t h e r W o r k e r s T o t a l C u l t i v a t o r s A g r i c u l t u r a l L a b o u r e r s H o u s e h o l d I n d u s t r y W o r k e r s O t h e r W o r k e r s T o t a l 1 D a r j e e l i n g 6 8 6 6 5 3 1 2 8 8 1 0 9 3 7 3 6 7 9 6 1 4 7 8 8 5 1 1 9 5 2 9 2 7 0 6 2 4 9 1 5 3 9 0 8 5 9 0 5 9 1 2 J a l p a i g u r i 2 0 9 8 3 0 1 3 4 3 6 0 1 8 8 6 4 6 6 2 3 7 9 1 0 2 5 4 3 3 6 0 1 1 4 9 5 8 0 3 7 9 7 5 1 1 3 8 1 1 2 7 7 7 0 3 3 C o o c h b e h a r 2 9 0 5 9 8 1 8 8 4 0 0 2 9 1 7 1 2 4 6 1 4 2 7 5 4 3 1 1 7 1 2 4 2 9 7 0 2 6 1 0 0 8 4 3 4 0 4 2 2 1 2 3 9 4 4 U t t a r D i n a j p u r 2 3 0 2 0 8 2 4 5 3 0 3 2 0 9 5 3 2 2 0 0 1 9 7 1 6 4 8 3 4 6 5 2 3 1 2 5 7 3 1 1 3 4 6 1 3 3 3 2 6 2 1 9 0 4 1 5 D a k s h i n D i n a j p u r 1 6 5 4 7 1 1 4 2 5 9 7 1 9 8 6 9 1 4 3 2 5 0 4 7 1 1 8 7 2 4 3 4 3 7 9 4 0 8 9 8 6 1 2 7 9 2 9 1 4 1 5 4 1 6 M a l d a 2 4 5 9 0 9 2 4 6 7 2 3 1 2 7 2 6 3 3 4 7 2 4 8 9 6 7 1 4 3 3 3 3 6 7 1 6 5 1 3 9 8 2 0 4 4 9 3 0 1 3 3 7 3 5 6 3 7 M u r s h i d a b a d 3 4 8 1 8 2 4 5 4 2 8 1 2 8 7 8 5 4 5 8 1 9 9 4 1 6 7 2 3 1 1 2 6 9 9 0 1 0 7 5 9 3 1 2 1 1 2 0 7 7 1 6 0 3 3 2 8 6 3 8 B i r b h u m 2 2 0 6 2 2 2 5 1 8 4 4 4 0 8 9 3 3 1 8 3 4 0 8 3 1 6 9 9 4 0 3 3 3 1 6 5 1 0 5 3 2 1 8 0 5 9 1 8 0 2 9 6 7 9 8 9 B a r d h a m a n 3 1 4 4 0 4 4 6 3 1 8 5 8 2 8 8 3 1 0 4 1 8 6 2 1 9 0 2 3 3 4 4 7 2 8 3 2 7 0 8 3 7 3 8 3 8 8 1 9 2 3 9 9 5 4 8 9 0 7 1 0 N a d i a 2 8 7 6 5 2 3 2 8 4 6 4 1 4 4 5 7 6 6 4 5 0 3 2 1 4 0 5 7 2 4 3 2 8 1 2 4 7 0 7 7 3 9 8 3 5 9 0 2 5 7 2 0 9 9 8 1 1 1 2 4 P a r g a n a s ( N o r t h ) 2 7 3 7 5 1 3 0 9 7 9 3 9 0 8 0 9 1 9 4 8 9 9 9 2 6 2 3 3 5 2 2 7 1 7 9 9 7 1 3 8 4 1 9 1 7 1 9 8 5 7 4 3 6 4 8 0 8 1 2 H o o g h l y 2 3 7 0 6 8 3 0 2 2 8 6 6 4 0 7 2 9 2 4 6 1 4 1 5 2 8 0 4 0 4 0 8 3 3 1 4 9 8 2 8 3 2 1 3 2 1 0 8 6 5 4 3 3 1 4 4 7 1 3 B a n k u r a 3 1 6 5 9 3 2 6 5 3 3 9 4 6 9 5 0 3 1 5 3 3 4 9 4 4 2 1 6 1 2 3 3 6 4 2 3 7 8 7 5 3 6 5 4 2 8 5 2 7 5 4 8 3 0 5 6 1 4 P u r u l i a 2 4 3 0 4 3 1 2 1 3 5 7 5 1 5 4 7 2 2 9 5 5 9 6 4 5 5 0 6 1 0 9 6 6 9 2 8 4 8 6 6 3 2 9 1 9 5 4 5 2 8 4 8 1 9 8 2 1 5 M e d i n i p u r 7 6 4 5 2 0 6 1 6 4 8 8 1 4 7 3 0 6 1 0 0 1 7 9 8 2 5 3 0 1 1 2 2 9 0 4 0 4 5 7 5 8 7 5 1 3 0 3 0 1 2 2 4 3 6 5 1 2 2 0 9 4 5 1 6 H o w r a h 6 3 7 7 2 8 8 7 7 0 1 2 0 3 0 8 9 5 2 1 2 2 1 2 2 4 9 7 2 1 1 1 6 3 5 7 7 2 2 4 5 4 2 1 9 9 5 9 6 2 1 3 9 0 2 1 7 2 4 P a r g a n a s ( S o u t h ) 2 6 9 9 4 2 3 2 8 7 1 9 8 8 9 0 0 9 9 0 5 6 9 1 6 7 8 1 3 0 9 2 1 6 8 2 5 5 2 9 7 4 7 2 7 7 1 6 9 8 8 8 5 6 4 6 3 0 T o t a l f o r t h e S t a t e e x c l u d i n g K o l k a t a = 4 5 5 0 2 3 0 4 5 1 9 1 9 7 1 3 9 3 1 5 5 1 0 9 3 7 2 2 2 2 1 3 9 9 8 0 4 1 0 9 7 3 1 6 2 8 3 9 3 8 2 7 2 6 3 7 2 1 7 0 1 0 8 2 6 3 6 4 1 5 2 Page 33 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 2 9 T a b l e 4 . 1 4 : R u r a l W o r k F o r c e P a r t i c i p a t i o n i n D i f f e r e n t D i s t r i c t s o f W e s t B e n g a l R u r a l W o r k e r S l N o . D i s t r i c t R u r a l p o p u l a t i o n M a i n M a r g i n a l T o t a l T o t a l C u l t i v a t o r ( M a i n & M a r g i n a l ) R u r a l T o t a l A g r i c u l t u r a l L a b o u r ( M a i n & M a r g i n a l ) R u r a l P r o p o r t i o n o f r u r a l w o r k e r t o r u r a l p o p u l a t i o n P r o p o r t i o n o f C u l t i v a t o r s t o r u r a l w o r k e r s P r o p o r t i o n o f A g r i c u l t u r a l l a b o u r t o r u r a l w o r k e r s P r o p o r t i o n o f o t h e r w o r k e r s t o r u r a l w o r k e r s 1 D a r j e e l i n g 1 0 8 8 7 4 0 3 2 3 4 2 3 7 9 8 1 6 4 0 3 2 3 9 8 7 4 1 1 3 5 5 9 7 3 7 . 0 3 7 2 1 . 6 7 7 8 . 8 2 8 6 9 . 4 9 5 2 J a l p a i g u r i 2 7 9 4 2 9 1 8 4 3 6 7 6 2 6 2 6 1 3 1 1 0 6 2 8 9 2 6 6 7 9 0 1 5 9 0 7 7 3 9 . 5 9 1 2 4 . 1 1 6 1 4 . 3 7 9 6 1 . 5 0 5 3 C o o c h b e h a r 2 2 5 3 5 3 7 6 8 5 7 4 5 2 0 7 5 6 6 8 9 3 3 1 1 2 7 6 6 3 7 1 6 9 2 3 3 3 9 . 6 4 0 3 0 . 9 6 8 1 8 . 9 4 4 5 0 . 0 8 8 4 U t t a r D i n a j p u r 2 1 4 7 3 5 1 6 3 0 5 6 6 2 1 1 4 1 7 8 4 1 9 8 3 2 4 4 1 3 4 2 2 4 4 4 6 3 9 . 2 1 0 2 8 . 9 9 5 2 6 . 6 5 7 4 4 . 3 4 8 5 D a k s h i n D i n a j p u r 1 3 0 6 3 2 4 4 1 4 1 2 9 1 3 6 2 3 1 5 5 0 3 6 0 1 8 9 1 2 2 2 2 0 2 6 0 4 2 . 1 3 0 3 4 . 3 6 3 4 0 . 0 2 1 2 5 . 6 1 6 6 M a l d a 3 0 4 9 5 2 8 8 9 6 2 9 5 3 6 7 9 5 0 1 2 6 4 2 4 5 2 7 8 5 5 2 4 1 1 1 7 1 4 1 . 4 5 7 2 2 . 0 3 3 3 2 . 5 2 3 4 5 . 4 4 4 7 M u r s h i d a b a d 5 1 3 3 8 3 5 1 4 2 1 2 4 3 2 9 7 3 0 4 1 7 1 8 5 4 7 3 7 1 4 3 4 5 5 4 9 7 5 3 3 . 4 7 5 2 1 . 6 1 3 3 2 . 2 9 3 4 6 . 0 9 3 8 B i r b h u m 2 7 5 7 0 0 2 7 5 5 9 0 1 2 8 8 5 4 7 1 0 4 4 4 4 8 2 5 9 9 3 8 4 1 4 4 3 9 3 7 . 8 8 3 2 4 . 8 8 8 3 9 . 6 8 0 3 5 . 4 3 2 9 B u r d w a n 4 3 4 8 4 6 6 1 2 4 7 7 7 5 4 3 8 9 0 8 1 6 8 6 6 8 3 3 4 8 7 8 6 7 0 6 9 0 8 3 8 . 7 8 8 2 0 . 6 7 9 4 1 . 9 1 1 3 7 . 4 1 0 1 0 N a d i a 3 6 2 5 3 0 8 1 0 8 1 8 7 1 1 7 7 9 9 8 1 2 5 9 8 6 9 3 1 5 0 8 4 3 6 6 4 2 9 3 4 . 7 5 2 2 5 . 0 0 9 2 9 . 0 8 5 4 5 . 9 0 6 1 1 2 4 P a r g a n a s N o r t h 4 0 8 3 3 3 9 1 1 3 8 5 0 5 2 3 5 4 3 4 1 3 7 3 9 3 9 2 9 1 4 5 3 3 9 2 6 1 6 3 3 . 6 4 7 2 1 . 2 1 3 2 8 . 5 7 6 5 0 . 2 1 1 1 2 H o o g h l y 3 3 5 4 2 2 7 1 0 1 1 8 7 3 2 8 2 4 8 6 1 2 9 4 3 5 9 2 7 3 3 1 7 4 4 1 9 8 2 3 8 . 5 8 9 2 1 . 1 1 6 3 4 . 1 4 7 4 4 . 7 3 7 1 3 B a n k u r a 2 9 5 7 4 4 7 8 7 3 5 9 2 4 7 4 3 5 3 1 3 4 7 9 4 5 4 3 8 9 8 8 5 0 1 1 8 6 4 5 . 5 7 8 3 2 . 5 6 7 3 7 . 1 8 1 3 0 . 2 5 1 1 4 P u r u l i a 2 2 8 1 0 9 0 5 8 1 4 4 7 4 7 2 8 2 4 1 0 5 4 2 7 1 3 5 1 3 8 4 4 0 4 5 6 1 4 6 . 2 1 8 3 3 . 3 3 0 3 8 . 3 7 4 2 8 . 2 9 7 1 5 M e d i n a p u r 8 6 2 6 8 8 3 2 2 6 3 8 1 1 1 1 8 2 1 0 5 3 4 4 5 9 1 6 1 0 4 4 5 3 5 1 1 7 2 6 0 1 3 9 . 9 4 4 3 0 . 3 1 2 3 4 . 0 2 9 3 5 . 6 5 9 1 6 H o w r a h 2 1 2 1 1 0 9 5 5 9 5 3 9 1 4 8 7 9 7 7 0 8 3 3 6 7 2 3 3 7 1 3 9 5 1 3 3 3 . 3 9 5 1 0 . 2 1 2 1 9 . 6 9 6 7 0 . 0 9 2 1 7 2 4 P a r g a n a s S o u t h 5 8 2 0 4 6 9 1 3 7 7 1 8 9 5 1 8 7 1 3 1 8 9 5 9 0 2 3 6 0 3 3 1 5 7 6 7 6 3 3 2 . 5 7 3 1 9 . 0 0 6 3 0 . 4 2 2 5 0 . 5 7 3 W e s t B e n g a l 5 7 7 4 8 9 4 6 1 6 1 0 6 5 8 0 5 7 8 3 0 6 2 2 1 8 8 9 6 4 2 5 4 7 0 2 3 3 6 8 9 1 7 5 7 3 7 . 9 0 5 2 4 . 9 9 0 3 1 . 4 8 4 4 3 . 5 2 6 S o u r c e - P r i m a r y C e n s u s A b s t r a c t V o l u m e 1 , W e s t B e n g a l ( C e n s u s o f I n d i a , 2 0 0 1 Page 34 Social Assessment of WBADMI Project Final Report 30 4.2.5 Human Development The picture of Human Development of the state is not homogeneous. Much variation across districts are noticed. Table 4.15 presents the calculations for the Human Development Index for the different districts, as well as for the state as a whole. There are very substantial differences across districts, such that the HDI ranges from a high of 0.68 for Howrah, to a low of 0.44 for Malda. Table 4.15: Human Development Indices by districts Development Indices Districts Health Incom e Education HDI HDI Rank Bankura 0.67 0.26 0.62 0.52 11 Birbhum 0.53 0.27 0.61 0.47 14 Burdhwan 0.74 0.47 0.71 0.64 5 Cooch Behar 0.5 0.41 0.65 0.52 11 Darjeeling 0.73 0.49 0.72 0.65 4 Dinajpur (Uttar & Dakshin) 0.62 0.39 0.53 0.51 13 Howrah 0.77 0.53 0.75 0.68 2 Hooghly 0.77 0.46 0.67 0.63 6 Jalpaiguri 0.61 0.38 0.6 0.53 10 Kolkata 0.82 0.73 0.8 0.78 1 Malda 0.49 0.36 0.48 0.44 17 Medinipur (Purba & Paschim) 0.68 0.45 0.74 0.62 7 Murshidabad 0.57 0.29 0.52 0.46 15 Nadia 0.65 0.41 0.66 0.57 9 North 24 Parganas 0.72 0.49 0.76 0.66 3 Purulia 0.61 0.18 0.55 0.45 16 South 24 Parganas 0.71 0.4 0.68 0.6 8 West Bengal 0.7 0.43 0.69 0.61 Source: West Bengal State Human Development Report 2004 4.2.6 Gender Development Gender discrimination, though declined in some respect, remains significant in the state. It is more evident in economic variables and in literacy. Health position is improving relative to men. The calculations of gender Development Index are presented in Table 4.16. Table 4.16: Gender Development Indices by districts District Health Index Income Index Education Index GDI Rank Darjeeling 0.731 0.356 0.714 0.600 2 Jalpaiguri 0.614 0.281 0.581 0.492 11 Coochbehar 0.497 0.287 0.628 0.471 13 Dinajpur 0.616 0.291 0.527 0.478 12 Malda 0.491 0.291 0.465 0.416 17 Murshidabad 0.566 0.176 0.527 0.423 16 Birbhum 0.533 0.178 0.595 0.435 14 Burdwan 0.740 0.270 0.669 0.560 7 Nadia 0.649 0.215 0.653 0.506 9 Page 35 Social Assessment of WBADMI Project Final Report 31 District Health Index Income Index Education Index GDI Rank North 24 Parganas 0.721 0.219 0.752 0.564 6 Hooghly 0.764 0.259 0.720 0.581 3 Bankura 0.662 0.215 0.605 0.494 10 Purulia 0.606 0.161 0.506 0.424 15 Medinipur 0.683 0.323 0.728 0.578 4 Howrah 0.773 0.194 0.742 0.570 5 Kolkata 0.824 0.320 0.783 0.642 1 South 24 Parganas 0.705 0.192 0.666 0.521 8 West Bengal 0.697 0.270 0.681 0.549 Source: West Bengal State Human Development Report 2004 From the tables it is indicative that the GDI broadly follow the same pattern as the HDI rankings in a district. The districts with low HDI also tend to have low GDI. However, some districts like Howrah, North 24 Parganas, Burdwan and Coochbehar have higher HDI rankings in contrast to their lower GDI rankings, suggesting acute gender discrimination in those districts. Low work force participation of women is also evident from the very low Income Index component of the GDI. 4.2.7 Agriculture Profile The state of West Bengal is broadly divided into three Agro-climatic regions covering 6 Agro- climatic sub-regions as classified by Planning Commission, Govt. of India. All the 18 districts fully or partly are distributed in these regions. Table 4.17 presents the distributions of Land Use Statistics for different districts. Page 36 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 3 2 T a b l e 4 . 1 7 : D i s t r i c t - w i s e L a n d U s e S t a t i s t i c s f o r t h e y e a r 2 0 0 6 - 0 7 N a m e o f t h e A g r o - C l i m a t i c Z o n e R e p o r t i n g A r e a F o r e s t A r e a A r e a u n d e r n o n - a g r i c u l t u r a l u s e B a r r e n a n d U n - c u l t u r a b l e l a n d P e r m a n e n t P a s t u r e s a n d o t h e r G r a z i n g l a n d L a n d u n d e r m i s c e l l a n e o u s T e e c r o p s a n d g r o v e s n o t i n c l u d e d i n n e t a r e a s o w n C u l t u r a b l e w a s t e l a n d F a l l o w l a n d o t h e r t h a n c u r r e n t f a l l o w C u r r e n t F a l l o w N e t a r e a s o w n D a r j e e l i n g 3 2 5 4 6 9 1 2 4 5 7 5 3 4 6 3 3 2 4 9 0 7 5 7 2 0 8 9 1 4 6 7 3 7 5 6 1 3 3 4 0 1 4 2 3 6 2 J a l p a i g u r i 6 2 2 7 0 0 1 7 9 0 0 0 8 3 5 2 2 3 2 6 1 0 5 0 4 6 5 6 4 1 1 6 0 4 8 3 3 5 7 2 6 C o o c h b e h a r 3 3 1 5 6 5 4 2 5 6 6 6 1 9 0 1 3 4 6 1 4 1 8 7 4 6 8 3 3 8 9 1 8 9 4 2 4 8 2 6 8 U t t a r D i n a j p u r 3 1 2 4 6 6 5 8 0 3 0 8 6 2 4 9 3 8 2 3 1 2 2 4 5 3 7 3 2 7 2 7 7 6 0 2 D a k s h i n D i n a j p u r 2 2 1 9 0 9 7 4 9 3 0 8 1 3 2 9 8 5 1 2 9 2 7 8 2 0 2 1 3 6 2 9 1 7 5 0 3 2 M a l d a 3 7 0 8 6 2 1 6 7 9 8 4 4 1 5 0 0 2 8 9 7 9 3 3 0 2 7 0 0 7 6 2 1 1 4 0 0 M u r s h i d a b a d 5 3 2 4 9 9 7 7 1 1 2 5 3 1 7 1 9 0 1 1 3 6 7 3 4 8 6 3 8 9 3 9 3 4 0 2 2 9 5 N a d i a 3 9 0 6 5 5 1 2 1 6 8 6 5 2 2 1 6 7 7 0 4 4 0 4 6 9 7 6 7 4 6 9 0 3 2 9 0 0 0 2 2 4 P a r g a n a s ( N o r t h ) 3 8 6 5 2 4 0 1 1 9 7 0 4 0 0 4 4 4 3 0 0 2 3 9 9 2 5 9 9 7 8 2 4 P a r g a n a s ( S o u t h ) 9 4 8 7 1 0 4 2 6 3 6 2 1 3 6 1 5 5 4 0 0 4 2 0 8 5 7 4 0 9 8 1 0 0 8 1 3 7 2 7 5 8 H o w r a h 1 3 8 6 7 6 0 4 9 6 7 2 1 1 6 1 9 1 0 8 1 6 0 2 3 4 5 3 0 8 8 2 1 8 6 H o o g h l y 3 1 3 3 7 9 5 3 0 8 8 8 0 3 1 1 0 4 1 7 6 2 1 4 9 0 1 5 4 1 6 2 2 0 5 1 9 B u r d h w a n 6 9 8 7 6 2 2 1 1 6 5 2 0 0 8 8 9 8 2 2 6 4 7 8 1 2 6 9 2 0 1 9 5 5 7 0 4 1 4 5 8 5 1 1 B i r b h u m 4 5 1 1 1 8 1 5 8 5 3 9 4 5 6 7 3 0 1 2 4 7 1 0 2 6 3 0 8 7 4 1 0 7 1 4 2 5 6 3 1 7 6 7 4 B a n k u r a 6 8 7 9 9 8 1 4 9 1 6 9 1 4 6 6 6 4 1 5 2 6 7 1 7 2 9 3 5 1 5 6 8 3 2 0 4 0 4 3 3 3 4 4 6 5 6 P u r u l i a 6 2 5 6 4 6 7 5 0 4 8 9 9 9 0 2 6 3 0 4 1 0 3 4 3 9 2 1 8 9 3 7 4 7 2 9 1 1 5 6 3 1 3 1 0 2 4 0 P a s c h i m M e d i n i p u r 9 2 8 5 8 1 1 7 1 9 3 5 1 5 6 9 3 0 1 7 3 9 8 8 9 9 4 9 3 6 3 1 8 4 5 5 9 2 1 4 0 3 5 5 5 6 4 5 P u r b a 3 9 6 5 9 4 8 9 9 9 7 4 4 1 4 4 9 2 2 8 9 0 3 0 4 3 1 3 3 1 4 2 2 9 1 1 5 4 Page 37 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 3 3 N a m e o f t h e A g r o - C l i m a t i c Z o n e R e p o r t i n g A r e a F o r e s t A r e a A r e a u n d e r n o n - a g r i c u l t u r a l u s e B a r r e n a n d U n - c u l t u r a b l e l a n d P e r m a n e n t P a s t u r e s a n d o t h e r G r a z i n g l a n d L a n d u n d e r m i s c e l l a n e o u s T e e c r o p s a n d g r o v e s n o t i n c l u d e d i n n e t a r e a s o w n C u l t u r a b l e w a s t e l a n d F a l l o w l a n d o t h e r t h a n c u r r e n t f a l l o w C u r r e n t F a l l o w N e t a r e a s o w n M e d i n i p u r T o t a l : 8 6 8 4 1 1 3 1 1 7 3 7 8 7 1 7 3 3 0 0 1 2 1 3 4 5 4 8 6 0 5 7 9 6 8 3 3 7 5 6 2 2 4 6 1 3 4 1 3 2 0 5 2 9 6 0 0 8 S o u r c e : E v a l u a t i o n W i n g , D i r e c t o r a t e o f A g r i c u l t u r e , G o v e r n m e n t o f W e s t B e n g a l Page 38 Social Assessment of WBADMI Project Final Report 34 District wise cropping pattern, cultivable area with net and gross cropped area including cropped intensity is presented in Table 4.18, 4.19 respectively. The cropping intensity in 2006-07 was highest in Hooghly (242.96%) followed by Nadia (241.84%), Murshidabad (235.35%), Howrah (199.57%), North 24 Parganas (198.56%), Coochbehar (196.11), Purba Medinipur (198.78%), Burdwan (185.86%). The lowest intensity was recorded in Purulia (115.7%) followed by Darjeeling (135.19%) and South 24 Parganas (144.61%) Table 4.18: Existing cropping pattern by districts Sl. No. Name of the District Irrigated Non - Irrigated 1 Darjeeling Paddy - Wheat / Vegetable / Potato Paddy / Pulses 2 Jalpaiguri Jute - Paddy - Wheat / Vegetable / Oilseed / Potato Jute - Paddy / Pulses 3 Coochbehar Jute - Paddy - Wheat / Vegetable / Oilseed / Potato Jute - Paddy / Pulses 4 Uttar Dinajpur Jute - Paddy - Wheat / Vegetable / Oilseed / Boro Paddy Jute - Paddy / Pulses 5 Dakshin Dinajpur Jute - Paddy - Wheat / Vegetable / Oilseed / Boro Paddy Jute - Paddy / Pulses 6 Malda Jute - Paddy - Wheat / Vegetable / Oilseed / Boro Paddy Jute - Paddy / Pulses 7 Murshidabad Jute - Paddy - Wheat / Vegetable / Oilseed / Sugar Cane Jute - Paddy / Pulses 8 Nadia Jute - Paddy - Wheat / Vegetable / Oilseed / Sugar Cane Jute - Paddy / Pulses 9 North 24 Parganas Vegetable - Paddy / Oilseed / Boro Paddy Paddy - Pulses 10 South 24 Parganas Vegetable - Paddy / Oilseed / Boro Paddy Paddy - fallow 11 Howrah Jute - Paddy - Boro Paddy Paddy - Pulses 12 Hooghly Jute - Paddy - Potato / Vegetables / Oilseed Paddy - Pulses 13 Burdwan Jute - Paddy - Potato / Vegetables / Oilseed Paddy - Pulses 14 Birbhum Paddy - Potato / Vegetables / Oilseed / Boro Paddy / Sugar Cane Paddy - Pulses 15 Bankura Paddy - Potato / Vegetables / Oilseed / Boro Paddy Paddy - Pulses 16 Purulia Paddy - Oilseed / Vegetable Paddy - Pulses 17 Paschim Medinipur Paddy - Potato / Pulses / Oilseed / Boro Paddy Paddy - Pulses 18 Purba Medinipur Paddy - Pulses / Vegetable / Oilseed / Boro Paddy Paddy - Pulses Source: Evaluation Wing, Directorate of Agriculture, Government of West Bengal Page 39 Social Assessment of WBADMI Project Final Report 35 Table 4.19: District wise Cultivable Area, Net Cropped Area, Gross Cropped Area and Cropped Intensity for 2006 – 07 Sl. No. Name of the District Cultivable area Gross Cropped Area Net Cropped Area Cropping Intensity (%) 1 Darjeeling 163014 192458 142362 135.19 2 Jalpaiguri 356917 550464 335726 163.96 3 Coochbehar 259632 486873 248268 196.11 4 Uttar Dinajpur 280523 470490 277602 169.48 5 Dakshin Dinajpur 190233 303018 175032 173.12 6 Malda 284768 396827 211400 187.71 7 Murshidabad 404374 946786 402295 235.35 8 Nadia 302680 701345 290002 241.84 9 North 24 Pargana 266820 516214 259978 198.56 10 South 24 Pargana 385789 539085 372785 144.61 11 Howrah 88869 164019 82186 199.57 12 Hooghly 223941 535781 220519 242.96 13 Burdwan 475239 852176 458511 185.86 14 Birbhum 340150 549725 317674 173.05 15 Bankura 389922 551043 344656 159.88 16 Purulia 443358 358953 310240 115.7 17 Paschim Medinipur 597088 966714 555615 173.99 18 Purba Medinipur 297803 552564 291154 189.78 Total 5751120 9634535 5296005 182.00 Cultivable area includes Net Area sown, Current Fallow, Fallow Land Other than Current Fallow, Culturable Waster Land, Land Under Misc. Tree Crops and Groves Source: Evaluation Wing, Directorate of Agriculture, Government of West Bengal Page 40 Social Assessment of WBADMI Project Final Report 36 Page 41 Social Assessment of WBADMI Project Final Report 37 4.3 Salient Features of the State: Salient Features of the state of West Bengal are presented in Table 4.20 in page 20 of 4 . 4.4 Salient Features of the Districts: Salient features of 18 districts of the state are presented below in Table 4.21 and 4.22 . Table 4.21: Salient Features of Demography and Administration by Districts Area (sq.km.) No. of Blocks No. of Mouzas Population Density per sq. km. Decadal Growth Rate (%) % Share of SC % Share of ST Sex Ratio Sl. No. Districts (1) (2) (3) (4) (5) (6) (7) (8) 1 Darjeeling 3149 12 708 511 23.79 16.09 12.69 937 2 Jalpaiguri 6227 13 756 546 21.45 36.71 18.87 + 942 3 Coochbehar 3387 12 1202 732 14.19 50.11 + 0.57 949 4 Uttar Dinajpur 3140 9 1504 778 28.72 + 27.71 5.11 938 5 Dakshin Dinajpur 2219 8 1638 677 22.15 28.78 16.12 951 6 Malda 3733 15 1798 881 24.78 16.84 6.90 948 7 Murshidabad 5324 26 2210 1102 23.76 12.00* 1.29 952 8 Birbhum 4545 19 2473 663 17.99 29.51 6.74 950 9 Burdwan 7024 31 2529 982 13.96 26.98 6.41 922 10 Nadia 3927 17 1346 1173 19.54 29.66 2.47 946 11 24 Parganas North 4094 22 1581 2182 22.69 20.60 2.23 926 12 Hooghly 3149 18 1915 1601 15.77 23.58 4.21 947 13 Bankura 6882 22 3830 464 13.82* 31.24 10.36 952 14 Purulia 6259 20 2683 405* 14.02 18.29 18.27 954 15 Purba Medinipur 4295 25 3035 1028 15.35 14.47 0.60 947 16 Paschim Medinipur 9786 29 8701 531 15.35 18.05 14.87 961 + 17 Howrah 1467 14 734 2913 + 14.57 15.42 0.45* 906* 18 24 Parganas South 9960 29 2139 693 20.85 32.12 1.23 937 West Bengal 903 17.77 23.02 5.50 934 + Highest * Lowest Table 4.22: Salient Features of Literacy, Indices, Employment, and others by Districts Sl. No. Districts Literacy Rate (%) 2001 Gender Gap in Literacy (2001) Human Development Index value (2004) Gender Development Index value (2004) Work Participation Rate (Rural) 2001 Per Capita Income (2003-04) at current % of B.P.L. families (P&R.D, Page 42 Social Assessment of WBADMI Project Final Report 38 Work Participation Rate (Rural) 2001 Male Female (1) (2) (3) (4) (5) (6) (7) (8) 1 Darjeeling 71.79 17.11 0.65 0.57 + 47.90* 25.70 23967.49 + 46.43 + 2 Jalpaiguri 62.85 20.62 0.53 0.45 52.20 26.20 19103.63 35.87 3 Coochbehar 66.30 19.81 0.52 0.45 55.10 23.30 16657.68 46.01 4 Uttar Dinajpur 47.89* 21.97 0.51 0.46 52.10 25.50 14046.26* 40.98 5 Dakshin Dinajpur 63.59 18.15 0.51 0.46 56.60 26.90 17895.20 43.54 6 Malda 50.28 17.55 0.44* 0.39* 52.70 29.60 18643.99 38.81 7 Murshidabad 54.35 13.08 0.46 0.41 51.30 14.70 17486.22 43.31 8 Birbhum 61.48 19.34 0.47 0.42 54.50 20.30 16466.24 44.02 9 Burdwan 70.18 19.66 0.64 0.54 56.50 20.00 23769.90 26.24* 10 Nadia 66.14 12.73 0.58 0.49 55.10 13.20 19980.67 34.22 11 24 Parganas North 78.07 12.20 0.66 0.55 54.10 12.00 16502.79 37.70 12 Hooghly 75.11 15.38 0.63 0.56 57.70 + 18.90 22397.81 29.08 13 Bankura 63.44 27.33 0.52 0.46 57.00 33.50 18236.17 42.48 14 Purulia 55.57 37.22 + 0.45 0.40 52.90 39.20 + 16182.38 43.65 15 Purba Medinipur 80.20 18.40 0.62 0.55 55.00 24.30 20914.35 26.89 16 Paschim Medinipur 70.40 22.20 0.62 0.55 55.00 24.30 20914.35 32.88 17 Howrah 77.01 + 13.11* 0.68 + 0.56 55.50 10.30* 22565.69 32.18 18 24 Parganas South 69.45 20.18 0.60 0.51 51.10 20.90 17759.77 37.21 West Bengal 68.64 17.41 54.10 20.90 20895.64 36.38 + Highest * Lowest 4.5 ISSUES OF SIGNIFICANCE · West Bengal’s overall development matches with that of the country as a whole as reflected in HDI and GDI values. However, it lags behind several other states indicating scope for further improvements. Page 43 Social Assessment of WBADMI Project Final Report 39 · Intra-state viz., inter-district HDI/ GDI differentials in W Bengal are quite high. · Despite significant development, quite a large number of households are poor – more than a third of them are below poverty line. · The state is predominantly ‘rural’ as 72% of the population lives in rural areas. Rural population relative to the total population of the district as a whole exceeds 80% in as many as 11districts and four of them exceed 90%. · West Bengal has relatively larger number of socially vulnerable households as reflected in higher proportion of Scheduled Caste and Scheduled Tribe population. · Sex ratio wise, the state matches with that of the country, however, the same is quite high in respect of SC and STs. · Cropping Intensity viz., Net Cropped Area relative to Gross Cropped Area for the state as a whole is quite high. However, inter-district CI differentials are very high ranging between 116 and 243, indicating substantial scope for further increases which is possible only by expanding irrigation facilities. · Given that the state is predominantly rural, and scope exists for enhancing CI, this project aimed at expanding area under minor irrigation, could contribute significantly for overall development. Page 44 Social Assessment of WBADMI Project Final Report 40 V. MINOR IRRIGATION SYSTEMS IN WEST BENGAL: CHALLENGES AND OPPORTUNITIES 5.1 PHYSICAL DIVERSITY OF MINOR IRRIGATION SYSTEM IN WEST BENGAL Minor Irrigation Schemes in the state are broadly of two categories. i) Ground water based schemes ii) Surface water based schemes 5.1.1 Ground Water Based MI Schemes Ground water is utilized in this type of schemes for irrigation. Dug well, Shallow Tube well (STW), Light Duty Tube well (LDTW), Medium Duty Tube well (MDTW) and Heavy Duty Tube well (HDTW) are the types of schemes under this category. Natures of ground water based schemes practiced in the State are depicted in Table 5.1 . Table 5.1 : Nature of Ground water Based Schemes with brief details Sl. No. Nature of Scheme Particulars Yield Capacity Command Area Water Distribution System 1. Dug well Well size 1.2 m dia and above with depth around 10-15 m Depends on recuperation 0.5 ha and above Installed by department, individuals and groups Field channel 2. STW Pipe Size 80 mm / 100 mm dia and taps 1 st or 2 nd aquifer 30 cum per hour and runs with centrifugal pump 4 to 6 ha Field channel or lay flat hose 3. LDTW Pipe Size 80 mm / 100 mm dia and taps 1 st or 2 nd aquifer 30 cum per hour and runs with submersible pump set 4 to 6 ha Field channel or lay flat hose 4. MDTW Pipe Size 150 mm dia and taps 2 nd or successive layers of aquifer 100 cum per hour and runs with submersible pump set 20 ha Underground pipe line distribution system 5. HDTW Pipe Size 250 to 300 mm dia and taps 2 nd or successive layers of aquifer 200 cum per hour and runs with submersible pump set 40 ha Underground pipe line distribution system Page 45 Social Assessment of WBADMI Project Final Report 41 5.1.2 Surface Water Based MI Schemes Surface water is the source of this type of schemes – river, streams, nallahs, lakes, reservoirs, tanks, ponds, beels, bangors, springs etc. are used as sources. Such schemes are broadly divided into two categories, viz, ¾ Surface Flow Schemes in which surface water is used by gravity flow ¾ Surface lift schemes in which water is lifted from the source either manually or using pump sets for distribution. Brief details about nature of such schemes are given in Table 5.2 . Table 5.2 : Nature of surface water based MI Schemes and its brief details Sl. No. Name of Scheme Brief details Pump Type CCA Remarks Surface Flow Category 1. Jampui Schemes Spring water is guided to the fields with lined h l Gravity flow Depends on spring flow Such schemes are available in Dooars 2. Storage Schemes Runoff is harvested and conserved in surface storage. Irrigation is provided canal network. Gravity flow Depends on the capacity of storage Such schemes are available in Purulia, Bankura and Paschim Medinipur Surface Lift Category 1. Surface lift irrigation schemes Lifted water is guided to the fields through unlined field channels or by flat hose Lifted manually or by 2 to 5HP single centrifugal 0.5 ha to 6 ha Such schemes are most common and are adopted by unorganized sector 2. Mini RLI Under ground pipe line with pressure distribution system takes care of field irrigation Two pumps set each of capacity 50 cum per hour 20 ha Such schemes are normally installed by the department and handed over to Panchayat for O&M. 3. Medium RLI Under ground pipe line with pressure distribution system takes care of field irrigation Two pumps set each of capacity 100 cum per hour 40 ha Such schemes are normally installed by the department and handed over to Panchayat for O&M. 4. Major RLI Under ground pipe line with pressure distribution system takes care of field irrigation Two pumps set each of capacity 200 cum per hour 80 ha Such schemes are normally installed by the department and handed over to Panchayat for O&M. Page 46 Social Assessment of WBADMI Project Final Report 42 Moreover, any of the Minor Irrigation Schemes depending upon attachment of special water distribution system is also termed as Drip and Sprinkler irrigation scheme. 5.1.3 Trend of Minor irrigation Development Minor Irrigation system in the state is popular amongst the cultivators. Whenever the farmers manage a fund either by loan or own savings, their first priority is development of irrigation in their fields. Moreover, they try to avail full advantage whenever there is scope for any scheme from any department of the Government. As a result numbers of various schemes have increased considerably resulting in substantial increase in Minor Irrigation coverage. While the number of schemes has increased by around 14%, the CCA has increased by 25% in 2000-01 as compared to the figures of 1987-88. The trend of Minor Irrigation development is projected in Table 5.3 . Table 5.3: Results of different Minor Irrigation Census in the State of West Bengal Number of schemes as per Sl. No. Name of Scheme 1 st MI Census 1987 - 88 2 nd MI Census 1990 - 91 3 rd MI Census 2000 - 01 1. Dug well 63387 55983 39377 2. STW 368316 504638 603667 3. DTW 3122 4039 5139 4. Surface Flow Schemes 70820 66454 53781 5. Surface Lift Schemes 205471 83645 107595 Total Number 711116 714759 809559 Total CCA 1681046 ha 1428275 ha 2095849 ha 5.2 DIVERSITY IN USES OF MI SCHEMES IN THE STATE MI Schemes are used mainly for single purpose i.e. for irrigation. However in practice, uses for other purposes are also noticed. ¾ Direct Uses · Irrigation · Pisciculture in the Reservoir type M.I. Scheme · Drinking water in STW/LDTW/MDTW/HDTW Schemes · Fingerling cultivation in reservoir type schemes · Aquatic plants like Makna etc. · Fodder cultivation Page 47 Social Assessment of WBADMI Project Final Report 43 · Duck rearing in reservoir type schemes · Bathing and Washing including live stock · Maintaining rituals / ceremonies particularly in reservoir and water detention type schemes. ¾ Peripheral Uses: · Silted reservoir bed clay for different purposes like pottery, bricks, improving agricultural land, earth works for houses. · Vegetative cover around the reservoir bed and in the catchment and command are used for cattle grazing · Fuel wood from the vegetative cover · Maintaining the ecological balance of the area 5.3 SOCIO-ECONOMIC DIVERSITY A total of 109 sample schemes have been covered by the Social Assessment team. 109 villages are associated with these schemes. These villages are spread over 18 districts representing various cross-sections of people. People of different socio-economic background residing in those villages are direct or indirect beneficiaries of the M.I. schemes. Primary information generated from 109 villages indicates the following: i) Around 80% belongs to marginal farmers having less than 1.00 ha of land; ii) About 15% having 1-2 ha of land belongs to small farmers iii) About 5% having land 2-10 ha belongs to medium farmers. Big farmers are negligible. In the villages of Jot Chaitani, Bharpota and Chaupira in Memari-I Block of Burdwan district, there are 281 households possessing about 221 ha of agricultural land. Amongst these 244 are marginal, 4 are medium farmers and 33 are small. Big farmers were not found. The remaining families (60) in those villages are dependent on agricultural labours and other allied activities. 5.4 OBSERVATION IN SAMPLE VILLAGES IN VARIOUS DISTRICTS 5.4.1 NADIA - 3 M.I. Schemes In Nadia 3 M.I. schemes have been visited. Both the Executive Engineers (Agri-Irrigation and Agri-Mech) despite their busy schedule accompanied the Social Assessment team to the M.I. schemes. · Bhomrapara RLI, Haringhata Page 48 Social Assessment of WBADMI Project Final Report 44 The RLI at Bhomrapara cater to 17 hamlets covering an area of 60 ha with 157 farmers of which 65% are small and rest marginal. The project is commissioned on the brink of a huge natural watershed (beel) called Bhomra Beel. The beel is mainly rain-fed. It is learnt form the beneficiaries that the farming scenario of the area has since changed after the commissioning of this project. The pump is running for the last 42 years. On an average it runs 4000 hours a year. The main cultivation is Kharif, Rabi and Boro also. A few of the beneficiaries grow vegetables too. Though the project is run by the department, a Beneficiary Committee exists for the project. The committee has engaged 4 people to monitor distribution of water in the command area, operation of pump on holidays and emergencies, collection of tax, etc. During interaction the beneficiaries suggested that the Beel needs to dredge so that its water holding capacity increases since they are facing paucity of water. Farmers who have land at the end of the command area get less water. Moreover, the field channels being ‘kutcha’ and the land being loamy, the seepage loss is higher. When asked regarding their own management of the scheme, the beneficiaries preferred that the government should continue looking after the scheme as it is. However, they like to have more training on operation and maintenance of pump. During lean period the beneficiaries are also engaged in NREGA, masonry work, fishing, etc. While mainly the males are engaged in farming the women try to augment the family income through forming Self Help Groups (SHG). There are 100 SHGs for women and these groups are engaged in micro credits and handicrafts business. The young generation being educated often show reluctance to farming. They prefer official jobs. The village has got 2 ICDS centers run by women and Child development Department, GoWB, 4 Primary schools and one High school. Some of the beneficiaries mentioned the problem of Arsenic in drinking water. · Dahakula, Karimpur - I The scheme is situated on the no man’s land of India –Bangladesh Border on the river Mathabhanga. It is a major RLI scheme and caters to 2 mouzas with 115 beneficiary farmers. 99% of these farmers are marginal. They grow rice, wheat, mustard, jute and banana. The soil is loamy and sandy. The scheme was commissioned in 1974. During rainy season the pump is shifted to a higher place. The scheme has a beneficiary committee but the function of this committee is limited. A major portion of the command area has fallen in the no man’s land and as a result every time the farmers go to the field they have to take permission from the Border security Force authority. After the sunset they are normally not allowed. The farmers informed that they get water during cultivation but sometime due to low voltage the pump does not work. It takes long time in case of any fault in the machine or transformer breakdown. The coordination between WRDD and that of State Electricity Board seems to be not sufficient. There are cases of migration to other Page 49 Social Assessment of WBADMI Project Final Report 45 places from this farming community. Some of the farmers have even gone to Dubai as laborer. The village has got 1 ICDS centre, 1 Primary school and 1 nearby High school. Average family size was found to be 7. There exists no SHGs but most families do goat rearing business. · Uttar Bahirgachi, Nakashipara HDTW This Heavy Duty Tube Well caters to 250 families of which 88% are marginal farmers. The scheme was initiated in 1994. Its command area is 40 ha. The beneficiaries of this scheme are engaged in farming activities throughout the year. In fact they have pre kharif produce also. During interaction the farmers informed that the field channels being ‘kutcha’ they go out of water some time, especially when the machine can not be run to its fullest capacity due low voltage. The SA team observed some shallow tube wells also. On inquiry it was learnt that during problem time they hire these shallow pumps to save their crops. The farmers reported that the service from the State Electricity Board needs improvement. Farmers feel that the spout to spout pipe line is laid with PVC pipe and this pipe often gets leaks due to pest, rabbits, etc. They prefer RCC pipes. Farmers having land at a distant face crisis of water as it takes long time. This they feel wastage of water. The beneficiaries have their committee to look into operation of the pump during holidays, collection of tax, etc. The village has got 1 ICDS centre, 1 Primary school, 1 health centre and 6 SHGs. The SHGs are engaged in mid meal cooking, NREGS, etc. There are migration from this village to places for jewellry work, ‘Zari’ work, carpentry and masonry work. A brief detail of the schemes is given in Table 5.4 . Name of the District: Nadia 1 Name of the block: Karimpur-I Haringhata Nakashipara 2 Name of the scheme: Dahakula RLI Major (Mathabhanga River) Bhomrapara RLI, (Bomra Beel) Uttar Bahirgachi 3 Type of the scheme: RLI RLI HDTW 4 Type of the beneficiary: Marginal Farmers – 114, Small Farmers - 1, Total – 115 Marginal Farmer - 47, Small Farmer – 110, Total – 157 Marginal Farmer - 213, Small Farmer – 37, Total – 250 5 Cultivable Command Area (CCA): 41 ha. 60 ha 41 ha 6 Villages benefitted: Dahakula, Baruipara- 2 Mouzas and 4 villages 17 villages Sheikpara , Dafadarpara, Purbapara 7 Crops and cropping pattern: Rice, Wheat, Mustard, Jute and Banana. Multiple cropping done in the command area. Boro, Aman, Vegetables. Multiple cropping done in the command area. Til, Jute, Paddy, Wheat, Mustard. Multiple cropping done in the command area. 8 Type of soil: Loamy, Sandy Loamy, Clay Loamy, Clay 9 Cropping Intensity and crop yield: 50% for Aman 200% 170% Page 50 Social Assessment of WBADMI Project Final Report 46 10 Maintenance: Department Department Department 11 Educational B ackground of the Beneficiaries: Beneficiaries are literate Beneficiaries are literate Average Literacy 12 No. of Educational Institutions: 1 ICDS, 1 Primary school, and 1 High School 2 ICDS, 4 Primary school, and 1 High School 1 ICDS, 1 Primary school, and 1 High School 13 Average Family size: 7 members 5 members 10 members 14 Electricity Supply: Electricity supply is a problem. Voltage remains low during April and May Electricity supply and voltage is good Electricity supply is a problem, SEB service is not good, no stabilization system, waterdistribution is not uniform (nearest field get maximum water supply than farthest field, that’s why they do not cultivate Boro, paddy). Education level of the young generation is up to High School. They try to go to Dubai and other places as cheap labour to earn money. Young boys and girls cannot continue their studies after ‘Madhyamik’ (10th standard) due to poor economic condition. Other than own land cultivation, they (beneficiaries) do small business, grocery, daily wage earner. They have beneficiary committee but their function is very limited. Since their cultivable land is situated in the Bangladesh border known as the ‘No mans Land’ they get permission twice a day to enter their land only if they show voters ID card. They have to leave their land before 4 pm. Other than fisheries beneficiaries are engaged in NREGA, fisheries, masonry etc. Two members supervise the water distribution, machine operation and tax collection from the beneficiaries. (One government operates the machine and after his duty time member of this committee operates this machine). 15 Other Informations: Most of the time their ripe crops are harvested by the people who live on the other side of the border. As such the poor farmers loose all their crops. Beneficiary committee is formed and they have 4 members to supervise the land wise water requirement, water distribution, machine operation and tax collection. (One government operator operates the machine and after his duty time member of this committee operates this machine). They use chemical fertilizers. It is important to note that the surface water is of good quality, because in water this type of chemical is absent. During April and May, 15% of the land is not irrigated due to low water level. They use chemical fertilizers. It is important to note that the surface water is of good quality, because in water this type of chemical is absent. Page 51 Social Assessment of WBADMI Project Final Report 47 5.4.2 24 Parganas (North) - 5 M.I. Schemes · Deora – Bagda: This scheme is a mini RLI on the river Ichamati at India-Bangladesh Border. It caters to 80 marginal farmers and its command area is 20 ha. The scheme was initiated in the year 2005 and handed over to the beneficiary committee in the same year. This is a diesel operated scheme. It has got a 9 member beneficiary committee and this committee manages the scheme well. In addition to fuel charges they collect extra money from the beneficiaries to carry out other works like maintenance of the pump, payment to supervisors who are looking after water distribution in the field, etc. The beneficiary informed that they are to purchase diesel at a higher cost. The BSF authority also takes away diesel while transporting to the field. Every time they bring diesel they are required to produce a certificate from the Panchayat which is not always an easy task and it is time consuming too. Moreover, the running cost is also higher with diesel. They preferred that the scheme be converted into electrically operated one. Other than farming they are also engaged in NREGA schemes. The women members are engaged in Beedi rolling. 1000 rolled Beedi fetch them an earning of Rs 25 a day. Many young people are migrating from the village to Gujarat, Mumbai and Delhi and even to Dubai. The village has got 2 ICDS centers, 1 Primary school, 1 High school, 1 Health centre and 3 SHGs. All beneficiaries belong to SC community. · Aira, Habra-I: Aira is a HDTW scheme covering an area of 40 ha and catering to 150 families. All these farmers are marginal farmers. The harvest 3 crops a year. The beneficiaries have their own committee. One member of this committee operates the pump during holidays though he is not trained. They complained about low voltage. The area falls under the Habra Municipality but they do not get any facility from the municipality. Rather, they being in the municipality area they are to pay more tax. The SA team separately talked to a group of women regarding their activities. They are not aware of the various schemes available with the government. The scheme though run by the department it appeared that beneficiaries take main responsibility of operating of the scheme. The village has got 3 ICDS centers, 1 Primary school. The High school is far and the Health centre is 4 km away. There exist 5 SHGs and they work in the field of micro- credit only. · Mamudpur, Barrackpore-I This scheme is a medium Deep Tube well installed in 1972 and covering an area of 26 ha with 100 beneficiary families. 90% of the beneficiaries are marginal farmers. They harvest 2 crops a year. The scheme was handed over to the beneficiaries in Page 52 Social Assessment of WBADMI Project Final Report 48 2002. The beneficiaries have a 7 member committee who looks after the operation, maintenance of the pump, distribution of water and collection of tax, etc. The committee has appointed 2 people to look after water distribution in the fields. They get Rs1000/ per head per month during the season. They have also 1 operator who gets Rs 10000 during aman and boro. The operator is not trained. Small maintenance is taken care of by the committee, but for major repairing they go to the department. During off season farmers are engaged in other professions like van rickshaw pulling, Masonry work, NREGA work, etc. The village has got 1 ICDS centre, 1 Primary school, 1 Health Centre, 1 High school. The education level is good. · Debitala, Minakhan The SA Team was shown a Canal Irrigation site. The canal is in the vested land and by rotation Panchayat or Irrigation department dress or de-silt the canal. This year the Irrigation department has carried out re-excavation work in the canal so that its water storage capacity increases. The canal is basically rain-fed and can provide water to 100 acre. Total number of beneficiaries attached to this scheme is 100 marginal farmers. They cultivate two crops a year- Boro and Aman. There is no pump set installed. Farmers hire shallow pumps for lifting water from the canal. They pay Rs 40 per hectare excluding the cost of diesel. Diesel cost is higher than that of market rate. Farmers who have their own pumps they use that and even hire out also. The command area is on either side of the canal. During interaction the farmers suggested that the depth of the canal should further be increased so that they get adequate water during farming season. Water exists only for 7 months in a year. The beneficiaries belong to minority community. There is 1 ICDS centre, 1 Primary school. The High school is 1 km away and the health centre is 4 km away. Literacy level is quite low. The villagers work as daily labourer during off season. · Barneajeer, Patkulpota, Sandeshkhali - II: This is again an irrigation scheme from the canal. The department maintains the canal. There is no beneficiary committee. Farmers have to lift water at their own cost. The rate is Rs 10 per bigha excluding the cost of diesel. The farmers complain that the depth of the canal is very less and water remains only 9 months. Farmers want that the canal be re-excavated to such a depth that water remains throughout the year. They also suggested for electricity as the cost of diesel is higher than that of prevailing market rate. The village has got only 1 ICDS centre and 1 Primary school. The population belongs to SC and ST communities. The literacy rate is low. There is hardly any other option for earning income. A brief detail of the schemes is given in Table 5.5. Page 53 Social Assessment of WBADMI Project Final Report 49 Name of the district: 24 Parganas (North) 1 Name of the block: Bagda Barrackpur - I Habra - I Minakhan Sandeshkhali - II 2 Name of the scheme: Deara RLI - Mini II (River Icchamati) 137 T, Mamudpur West DTW 162 HDTW Aira Poiner Canal Minor Irrigation (Rain fed Canal) Patkulpota Canal Minor Irrigation (Rainfed Canal) 3 Type of the scheme: RLI - Mini II DTW HDTW Canal Minor Irrigation Canal Minor Irrigation 4 Type of the beneficiary: Marginal Farmer = 80, Total = 80 Marginal Farmer = 90 , Small farmers =10 Total = 100 Marginal Farmer = 150, Total = 150 Marginal Farmer = 100 Total = 100 Marginal Farmer = 40 Total = 40. 5 Cultivable Command Area (CCA): 20.23ha 26.30ha 40.41 ha. 40.41 ha. 32.4 ha 6 Villages benifitted: - - - - Bermajur No. 1, Aitepara, Bermajur, Majherpara, Bermajur, Nutanpara 7 Crops and cropping pattern: Aman, Aus, Mustard, Vegetable, Jute Multiple cropping pattern is practised. Aman and Boro Multiple cropping pattern is practised. Aman, Boro, Banana, Potato, Vegetable Multiple cropping pattern is practised. Aman, Boro Multiple cropping pattern is practised. Aman, Boro, 8 Type of soil: Sandy, Loamy Clayey,loamy Sandy, Loamy Clay Sandy 9 Cropping Intensity and crop yield: - - Boro = 28 acre Aman = 10-12 bags/bigha. Boro = 3-4 bags/bigha. - 10 Maintenance: Maintained by the Beneficiary Maintained by the Beneficiary Maintained by the Department Maintained by the Beneficiary Maintained by the Beneficiary 11 Educational Background of the Beneficiaries: Average Literacy Upto primary - Average Literacy Above primary 12 No. of Educational Institutions: ICDS = 2, Primary School =1, High School = 1, SHG=3 (Women work only for social work). ICDS = 1,Primary School = 1, High School = 1, Health Centre = 1 ICDS = 3, Primary School =1, Health Centre= 1. ICDS = 1, Primary School = 1, Health Centre = 1. ICDS = 1, Primary School = 1, Health Centre = 1. 13 Average Family size: 5 members. 5 members. 6 members. 12 members 6 members. 14 Electricity Supply: - Low voltage and load shedding is the main problem. Electricity exist in this mouza. Sometime low voltage disturbs the water distribution. - - Page 54 Social Assessment of WBADMI Project Final Report 50 15 Other Information Beneficiaries are all SC. Beneficiary Committee exist with President, Secretary and Cashier. Total no. of members is 9. This mouza is refugee colony. Refugees are from Khulaa and Faridpur district of Bangladesh. Beneficiary Committee of 7 members with President, Secretary and Cashier. 1 of the member is operator. But he is not trained. Operator get Rs. 10,000/- for 2 (Aman and Boro) seasons from the collected money from all beneficiary. Committee members collect the money from all beneficiaries crops basis, like for Boro crop money amount is Rs. 900 / acre and for Aman crop money amount is Rs. 300 / acre Beneficiary Committee exist with 10 members. 1 Govt. operator posted but after his duty hours 1 member of this committee operates the machine. He is not trained. Beneficiaries pay tax, for Boro they pay Rs. 816 / acre, for Aman they pay Rs. 204 / acre and for vegetables they pay Rs. 340 / acre. Beneficiary Committee exist. Few farmers have own pump. Diesel cost is Rs. 36 / litre. Rent of pump is Rs. 40 / hr excluding diesel cost, i.e. in total Rs. 600 / bigha. Beneficiaries are all from minority community. Maximum beneficiaries are illiterate. Children go to school. Other than cultivation, they work as labourer. Beneficiary Committee is yet to be formed. After completing the excavation of this canal, it will be handed over to beneficiaries. After that they will operate the two machines, water distribution, fuel cost etc. Pumps will be operated by diesel. Diesel cost is Rs. 36/litre, 10 HP Machine consumes 1 litre/hr. Beneficiary committee maintains this RLI. They Supervise the water distribution and operate the machine. Committee members collect the money from all the beneficiaries as per crops like, they collect Rs. 60 / bigha for paddy Rs. 40 / bigha for mustard excluding diesel cost. Because, each beneficiary has to buy and collect the diesel.Before this RLI, they cultivate only half of the present utilized land. If any minor problems arise in machine, operator can repair that problem. But in case of major problem, they call mechanic from Agri-Irrigation division from BarasatCommittee supervise and maintenance the land and water distribution. Beneficiaries (cultivators) are not so educated, few literate and few illiterate. But their children go to schools and college.Group of women are very much active and energetic. They need some help from Govt. for their side income. Their main complain is they do not get any help for cultivation and any other scheme from Municipality. Depth of canal is not sufficient for minimum coverage of boro cultivation. They suggested for increasing the depth because there is no other option. Beneficiaries are 50% SC and 50% ST Community. But educational level is good. In every family there is at least one graduate member. They do not go outside for service. They work as labourer. Page 55 Social Assessment of WBADMI Project Final Report 51 : They suggested for electrification in this RLI. Electric supply is present in this mouza. They suggest for electric connection because diesel is costly. They face various problem at the time of collection of diesel. BSF is a main problem. If any person do not show Panchayat certificate then BSF do not allow this diesel and person lost all the fuel. If there any urgency arise, they cannot use this diesel which affect on cultivation process. Other profession is Masonry, NREGA worker, Rickshaw and van puller - - Depth of newly excavated canal is not sufficient for water reserve. In rainy season canal gets flooded for this reason. They suggested for more depth for maximum coverage of cultivable land. Because they are fully dependent on this land use. They have no other option Their main occupation is cultivation other than cultivation they work for NREGA Project. Young boys and girls going to school and college. Few male persons go to Dubai, Gujrat, Mumbai and Delhi.All the women members of each family is engaged with “Beeri” binding. It is also another source of income. They work morning and evening. Each day each woman can make 1000 'beeri'. Main cultivators are not highly educated but literate. But young generation becoming graduate and service holder. - - - Page 56 Social Assessment of WBADMI Project Final Report 52 5.4.3 HOOGHLY 7 M.I. Schemes · Hatipukur, Masat, Canditala I The SA team visited a potential water harvesting tank. The tank was excavated in 1983 but after that no re-excavation is done. As a result the depth of the pond has been decreased. The pond has the capacity of covering 12 ha of land. Its catchment area is 6 ha and 3 canals also lead to this pond. One of the canals is connected to DVC water source. The beneficiaries do not have any committee. They harvest 3 crops a year including vegetables. A few farmers are also engaged in professions like rickshaw van pulling, tailoring, etc. During interaction the farmers suggested that the present depth of the pond which is 2.4 m is not sufficient to hold water in the pond throughout the year. The village has got 4 ICDS centers, 4 Primary schools, 1 High school and a Health centre nearby. There exists 7 SHGs who are engaged in hatchery. · Hamia, Khanakul This RLI scheme is a medium one with coverage of 34 ha. The beneficiaries are all marginal farmers. The scheme has been handed over to the 7 member Beneficiary Committee. The education level is quite good of this committee. The committee is running the scheme successfully. They have appointed 2 persons to look after the distribution of water in the field and pay Rs 2000 per head per month for 7 months. They collect tax to cover the cost of electricity and supervision. They proposed to convert the scheme into an electric run one. The farmers spoke of the need for training on pump operation, maintenance, etc. The village has got 3 ICDS centre, 2 Primary schools, 1 High school at a distant. The female members of the village have formed 6 SHGs and they engaged in ‘Zari’ work, cattle management, etc. · Damodarpur, Goghat This is a major RLI scheme established in 1971 with coverage of 47 ha. All beneficiaries are marginal farmers. Total number of beneficiaries is 375. The scheme is maintained by the department. The department’s operator here is a lady who has difficulty in coming to the site daily. As a result the committee has to carry out the operation of the pump themselves. They prefer that a male operator is appointed immediately. The farmers also requested to increase the number of spouts. The farmers also stressed upon the need for proper training of the members of the beneficiary committee. Regarding the handing over of management of the scheme they are not ready now to accept. The village is educated one and connected with metal roads. There are 3 ICDS centre and 4 Primary schools. No of HS school is 1. The women folks have formed 12 SHGs and they are engaged in ‘Zari’ and jute work. Page 57 Social Assessment of WBADMI Project Final Report 53 · Multi, Pandua This Deep Tube well has coverage of 40 ha with 150 beneficiary families. The scheme was established in 1973 and re-drilled in 1993. The majority of the beneficiaries are small farmers. However, there are at least 30% big farmers. The overall economic condition is good and they have adequate agricultural produce. The scheme is run by the department. The operator stays in the site. However, in case of emergency the members of the beneficiary committee operate the pump. He has been given a preliminary training by the department. The low voltage problem exists. The farmers also carry out teak plantation as a source of extra income. The village has got 2 ICDS centers and 2 Primary schools. Young generation prefers to go for service. Close by the above there is a LDTW scheme run by the department. The scheme was installed in 1984. It covers an area of 6 ha with 94 beneficiaries. 3 harvests come from this scheme. 50% of the beneficiaries are ST (Mandi, Hansda). The Beneficiary Committee is very active here. They have organized the stay of the government operator in the village itself. In addition they have their own operator who helps in running the pump in case of dire necessity. The area has got some problems. The topography of the land is not plain but undulating. There field is undulating. As a result water does not flow equally and automatically. They had to stop boro cultivation due to paucity of water. Water level falls during dry season. The village has got 1 ICDS centre and 2 Primary schools. · Chandanpukur The SA team was shown a water harvesting tank in this spot. The tank is owned by a single farmer and it was not clear during meeting with the villagers whether the water would be given to the farmers if it is developed as a water harvesting tank. The owner was absent during interaction. The tank however has the potential of covering 20 ha of land around it. Not much data was available. · Debanandapur This is a department run Deep Tube Well centre. It covers an area of 40 ha and benefits 125 families. 60% of the beneficiaries are marginal farmers. The scheme was established during late seventies. Beneficiaries of this scheme harvest 3 crops a year. The beneficiary committee looks after the collection of tax, distribution of water, etc. In the absence of the government operator they operate the pump also. They have their paid supervisor to do such things. The problem of low voltage was mentioned by the beneficiaries during interaction. The delay in attaining electrical fault by the State Electricity Board people was also mentioned Education standard of this village is good. Young people go out in search of jobs. It has got 4 ICDS centers, 2 Primary schools and a High school. Page 58 Social Assessment of WBADMI Project Final Report 54 A brief detail of the schemes is given in Table 5.6 – 4.7. Name of the district: Hooghly 1 Name of the block: Chanditala Chinsura Pandua 2 Name of the scheme: Hatipukur Pond-Water Harvesting Tank D ebanandapur - DTW Multi LDTW 3 Type of the scheme: Water Harvesting Tank DTW LDTW 4 Type of the beneficiary: Marginal Farmer - 100, Small Farmer – Nil, Total – 100 Marginal Farmer - 70, Small Farmer – 55, Total – 125 Marginal Farmer - 7, Small Farmer – 67, Total – 74. 5 Cultivable Command Area (CCA): 12 ha 40.5 ha 6.07 ha 6 Villages benefitted: Mashat Ghoshpara, Banerjee Para, Pal Para, Ghati Para Debanandapur, Krishnachandanpur, Manaspur, Choto Khejuria - 7 Crops and cropping pattern: Aman, Boro, Vegetables (Potato) Multiple cropping is done in the command area. Jute, Til, Aman, Boro, Mustard. Multiple cropping is done in the command area. Aman, Mustard, Potato, Vegetables 8 Type of soil: Loamy Clay, Loamy Loamy, Clay 9 Cropping Intensity and crop yield: - - - 10 Maintenance: Maintained by the farmers (not Beneficiary Committee). Maintained by the Department Maintained by the Department 11 Educational Background of the Beneficiaries: Beneficiaries are educated up to Primary school level Educated above Primary school level Beneficiaries are literate 12 No. of Educational Institutions: 4 ICDS, 4 Primary school, and 1 High School 4 ICDS, 2 Primary school 1 ICDS, 2 Primary school. 13 Average Family size: 5 members 5 members 4-5 members 14 Electricity Supply: - Electricity supply and voltage is good - 15 Other Informations: There is no beneficiary committee. They are not able to renovate this pond. Present depth of water is 2.4m which is not sufficient to meet the need of irrigation. If government excavates this pond the surrounding land will be covered. They need proper guidance for formation of beneficiary committee and respective roles and responsibilities for proper maintenance and utilization knowledge. Members of the beneficiary committee supervise the water distribution in the land, time to time operation of the machine in the absence of Government operator though they have no training to operate the machine. They collect the tax from all beneficiaries and for the above volunteer works they get small amount remuneration from all beneficiaries. Young boys & girls usually go to the college and also are service holders.Beneficiaries are 50% ST (Mandi, Hansda etc.) Page 59 Social Assessment of WBADMI Project Final Report 55 Other than cultivation beneficiaries are engaged in tailoring, rickshaw drivers and van drivers etc. Few young boys and girls are i nto government service. Educational background is g ood. Maximum young boys and girls are into service and move to other places for any type of job. Name of the district: Hooghly 1 Name of the block: Pandua Khanakul-II Goghat 2 Name of the scheme: Deep Tube Well Clusters Tarajit Kotalpur RLI Damodarpur RLI 3 Type of the scheme: Deep Tube Well RLI RLI 4 Type of the beneficiary: Marginal Farmer – 35, Small Farmer – 105, Big Farmers – 10 Total – 150. Marginal Farmer Marginal Farmer 5 Cultivable Command Area (CCA): 40.5ha 34 ha 46.5 Ha 6 Villages benifitted: - Hanua, Manikdeep, Jhari Chawk Uttarpara, Paschimpara, Dakshinpara 7 Crops and cropping pattern: Boro, Aush, Aman, Mustard, Potato, Vegetables Rice, Potato. Ground Nut, Vegetables Potato. Ground Nut, Jute, Boro 8 Type of soil: Sandy, Loamy Sandy, Loamy Sandy, Loamy 9 Cropping Intensity and crop yield: - - - 10 Maintenance: Maintained by the Department Maintained by the Beneficiary Committee.7 in no Maintained by the Beneficiary Committee. 11 Educational Background of the Beneficiaries: Beneficiaries are educated up to Primary school level Graduate, Madhyamik, VIII standard Beneficiaries are educated up to Primary school level 12 No. of Educational Institutions: 2 ICDS, 2 Primary school 3 ICDS, 2 Primary school 3 ICDS, 4 Primary school and 1 High School 13 Average Family size: - - - 14 Electricity Supply: - - - 15 Other Informations: Young generation move out for services. Other than cultivation, their income generation source is plantation of teak wood tree Villages used to go outside namely Medinipur, Howrah for agricultural work. No. major power cut,Year of Establishment of the Scheme – 1971,NREGA Scheme is functional in this area Page 60 Social Assessment of WBADMI Project Final Report 56 The Beneficiary committee supervise the water distribution, operate the machine in the absence of government .Operators get training from government operator The scheme is run with diesel but they are looking for electric connection which could minimize the tax amount besides avoiding miscellaneous problems like carrying of Diseal,storage etc. There is no male operator in this area. One female person is there as on die hard case. A problem of proper handling is seen. In case of hand over the scheme the beneficiary committee would face lack of time to attend office 5.4.4 MURSHIDABAD – 5 MI Schemes · Ratanpur Ratanpur RLI at Bhapta is a major RLI scheme. Its command area is 76 ha and benefits 300 farming families of which 99% are marginal farmers. The scheme was installed in 1990. The beneficiary committee is very active here. The collection of tax is good. The tax collected during 2007 was Rs. 36,182/-. The beneficiaries belong to SC and Minority communities. The beneficiaries informed that they do not have to go out for jobs as they remain busy in their own land. They produce lot of vegetables also. The beneficiary committee is very big here with 21 committee members. The farmers mentioned the problem of low voltage. They do not have training on operation and maintenance. Regarding their own management of the scheme they responded that they are yet ready for that. The village has got 3 ICDS centers and 4 Primary schools, 2 High schools and 1 Madrasa. Most of the young people are also attached to agriculture. As a result there is very little migration from this village. Sometimes they get engaged in NREGA work. The village has got SHGs and members of these SHGs are engaged in ‘beedi’ rolling, vegetable selling, etc. · Niamatpur, Lalgola This is a major RLI scheme with 200 marginal farmers as its beneficiary. It was installed in 1972 and covers 120 ha of land. The beneficiaries harvest 2 crops a year. The beneficiary committee has 8 members. They manage the scheme during holidays. But they are not ready for handover of the scheme since they require training for it. The village has got ICDS centre and 3 Primary schools. There is one HS School. The female members of the families have formed SHGs and are engaged in Mid-day meal cooking, beedi rolling, etc. · Dasturhat, Sagardighi This is a major RLI scheme. The scheme was established in 1977 and covers an area of 120 ha. The number of families who are benefitted from the scheme is 150. 95% of the beneficiary families are marginal. The beneficiary committee has got 17 members. During interaction the farmers, they mentioned problems like soil erosion on the river bank. Page 61 Social Assessment of WBADMI Project Final Report 57 Problem of rabbit was also mentioned. Low voltage is also a problem. The education standard of the village is good. It has got ICDS centre, MSKs, Primary school. The village is facing a migration problem of young generation. They prefer service to agriculture. · Dighirpar, Raninagar This RLI covers 32 ha of land and it benefits 200 families. It was installed during 1974. After installation of this scheme the agricultural activities have increased. They face employment crisis and as a result many families go out of the village for livelihood. The harvest they get out of their land is not adequate to maintain their families throughout the year. Regarding management of the scheme by themselves they are not interested at all because of the high cost of maintenance. The village has got ICDS centre and 3 Primary schools. Women folks have formed SHGs and they engaged in cooking midday meals, beedi rolling, etc. · Bhapta This Deep Tube Well was established in 1965, one of the oldest DTW the SA team has visited so far. It has got 85 beneficiary families and 90% of them are marginal farmers. Its command area is 41 ha. The farmers mentioned that the produce they get from their field is not adequate for the family for whole year. They mentioned the problem of Arsenic, low voltage, iron deposition in the tube well, wastage of water, irregular payment of tax, etc. The village has got 6 Primary schools, 2 High schools. There are ICDS and SSK centers also. A brief detail of the schemes is given in Table 5.11. Name of the district: Murshidabad 1 Name of the block: Lalgola Beldanga-I Beldanga-I Raninagar Sagardighi 2 Name of the scheme: Basumati I RLI Project Bhapta 10 M Scheme Ratanpur, Bhapta RLI Dighir Pahar RLI Dasturhat No. 2 Scheme 3 Type of the scheme: RLI DTW RLI RLI RLI Major type 4 Type of the beneficiary: Marginal Farmer Marginal Farmer = 90%, Small Farmers = 10% Marginal Farmer Marginal Farmer Marginal Farmer = 95%, Small Farmers = 5% 5 Cultivable Command Area (CCA): 121.4 Ha. 41.3 Ha. 75.6 Ha. 32.4 Ha. 121.4 Ha. 6 Villages benefitted: Kadamtala, Ram Chandrapur, Chamakpur, Balipa, Singha Bhapta, Uttarpara, Dakshinpara, Niz Para, Sankar Para, Mohula Ratan Gopalbati, Maheshpur, Bhapta, Char Shibpur Dighir Pahar, Kalaberia, Char Islampur Hatpara, Baganpara, Shibpur, Dasturhat, Nichupara, Madhyapara, Tiktiki Para, Biswanathpur. Page 62 Social Assessment of WBADMI Project Final Report 58 7 Crops and cropping pattern: Jute, Aman, Rabi, Boro Jute, Aman, Rabi, Boro Jute, Aman, Rabi, Boro Boro, Aman, Wheat, Rai, Til, Banana Aman, Jute, Wheat, Rai 8 Type of soil: Sandy Sandy Sandy Sandy Sandy 9 Cropping Intensity: - - - - - 10 Maintenance: Maintained by Department Maintained by Department Maintained by Department Maintained by Department Maintained by Department 11 Educational Background of the Beneficiaries: Upto Primary level Upto Primary level Upto Primary level Upto Primary level Upto Primary level 12 No. of Educational Institutions: ICDS, 3 Primary school, and 1 High School ICDS, 6 Primary school, and 2 High School, High Madrasa. 4 ICDS, 2 Primary school, and 3 High School ICDS, 3 Primary school, and 1 High School ICDS, 1 Primary school 13 Average Family size: - - - - - 14 Electricity Supply: - Electric supply is in low voltage. Electric supply is in low voltage. - Electric supply is very poor 15 Total no. of beneficiaries are 120.Irrigation tax as per Govt. rate. Murshidabad is Arsenic affected.Iron in ground water Total no. of beneficiaries: 300. Irrigation tax as per Govt. rate.Total amount of tax collected in the last year – Rs. 36, 182/-. Total no. of beneficiaries:200. Irrigation tax as per Govt. rate.12) SHGs are in this area (Mid day meal helper, Bidi industry) Total no. of beneficiaries : 150. Irrigation tax as per Govt. rate.Soil erosion is a major problem. Other Informations: Beneficiary Committee 7-8 in members. Young generation mainly go to outside for masonry work. Beneficiary Committee is not ready to take over the charges Water damage is there. In case of handover the committee would face problem with irregular payment of tax. Most of the young generation also attached to the agriculture NREGA is present. SHGs are there (engaged in bidi making, vegetable selling). Not ready to take over the project as the tax will be more. There is no training for the beneficiary committee to operate the machine. NREGA is very poorly implemented. There is no permanent income in this area. No. of people moving out is very high. Young generation go to outside for masonry work. Rabbits and other problem related to water damage 5.4.5 HOWRAH - 1 MI Scheme · Ghoshpur, Amta-I Page 63 Social Assessment of WBADMI Project Final Report 59 This is an ideal example of handover scheme. This is a major RLI scheme and covers 60 ha of land with 350 beneficiaries. The scheme was established in 2006 and handed over to beneficiary committee in 2007. The committee has 19 members. All 350 beneficiaries are marginal farmers. This RLI is only for Boro cultivation. The machine runs for only 3 months in a year. Soil type is clay and the farmers do want to grow other crop. The beneficiary has their own Bank Account in the name of the committee. They collect tax to cover the cost of fuel and other supervision costs. The committee has appointed 2 operators who stay 24 hours in the project site. Their salary is Rs 3000 and Rs 2000 per month. The committee collected tax of Rs 1.43 lakh during last Boro season. They are planning electrification of the scheme so that they can increase their profit. Since the main cultivation from this scheme is Boro, the farmers during rest of the time in the year are engaged in making power glass for spectacles. The population density of the village is very high. However, the migration rate is not very high. Only 5% of the young people go out for jobs like Gold and diamond jewelry. It is noticeable that there is no government service holder in the village. The farmers mentioned that they require four more chambers in the scheme. A brief detail of the schemes is given in Table 5.12. Name of the district: Howrah 1 Name of the block: Amta-I 2 Name of the scheme: Ghoshpur RLI 3 Type of the scheme: RLI 4 Type of the beneficiary: Marginal Farmer = 350, Small Farmer = Nil, Total = 350 5 Cultivable Command Area (CCA): 60.7 Ha. 6 Villages benefitted: Ghospur, Mahisgola, Sherpur, Madhyakul, Chandrapur, Bhandargacha, Chatra 7 Crops and cropping pattern: Aman, Boro. Multiple cropping is done in the command area. 8 Type of soil: Clay 9 Cropping Intensity and crop yield: Boro - 35 quintal / acre, Aman - 16 quintal/acre 10 Maintenance: Beneficiary Committee 11 Educational Background of the Beneficiaries: Beneficiaries are literate 12 No. of Educational Institutions: ICDS- 5, Primary School – 2, MSK – 1, High School – 2 13 Average Family size: - 14 Electricity Supply: - 15 Other Informations: This RLI utilized only for Boro cultivation. Machine runs only 3 months. Soil type is clay and for this reason other crops cannot be cultivated by the farmers. Aman cultivation depends on nature. But before this MI scheme they cultivate only 50% of the present land, now cultivation is almost doubled. Page 64 Social Assessment of WBADMI Project Final Report 60 Name of Beneficiary Committee is “Ghoshpur Krishak Bandhu Nadi Jalatollon Prakolpa”. This project covers – 2 GPS, (i) – Bhadargacha. (ii) – Chandrapur. Committee formed in the year 2007 Committee consist of 19 members, h eaded by President & Secretary. 2 Machine Operators appointed among beneficiaries. 2 operators stay in the place 24 hours in the Boro season. They supervise water distribution, minor machine repairing. In case of major problem then they call outside mechanic. They are paid persons, among them one person get Rs. 3000/month and other Rs. 2000/ month. Beneficiary committee collects the money from all beneficiaries like: Rs. 450/- bigha from these who hold low land and Rs. 500/- bigha from those who hold upper land. This collected money they spend it for diesel machine maintenance, remuneration of operators. But diesel is very costly for beneficiaries as it requires to be transported which require extra cost. Other than Boro and Aman cultivation beneficiaries are engaged in socio-political activities. Density of population is very high in this area. Young boys and girls are going to college, specially girls from minority group. 5.4.6 PURBA MEDINIPUR - 5 MI Schemes · Chakbhabani, Patashpur This is a Deep-Tube well scheme installed in 1974 but from last 4 years sand is coming out from the Tube well. The scheme has a command area of 40 ha with 350 beneficiaries. 50% of the beneficiaries are SC. The DTW is used only for Boro. Last 4 years the beneficiaries are not using the Deep Well as it is choked. Instead they have made their own arrangement. The area being flood prone cultivation of other crops is also a risk. The beneficiary committee of this scheme has 5 members. They collect tax and monitor water distribution from source they have created. . The village has got 3 ICDS centers, 2 Primary schools, 1 High school and a Health centre. There are 10 SHGs formed and these SHGs are engaged in mid day meal cooking. · Lochubad, Patashpur This HDTW has a command area of 30 ha with a total number of beneficiaries of 100. 92% are marginal farmers but mostly general caste people. The scheme was installed in 1992. The farmers get two crops out of this scheme. The beneficiary committee has 8 members. They have their own appointed people to look after tax collection, distribution of water, etc. During discussion the beneficiaries mentioned the problem of load shedding and low voltage. One important point for this scheme was noted by the SA team that 20 ST families were brought to the site and given land to stay. They were assured of drinking water and electricity and other civic facilities. But even after 16/17 years gone, no such arrangement is made. These 20 ST families Page 65 Social Assessment of WBADMI Project Final Report 61 showed their anger to the visiting SA team. They are extremely unhappy of this deprivation and demand for immediate solution. The village has got 1 ICDS centre, 1 Primary school, 1 High school and a Health centre. There is only 1 SHG working in DWCRA scheme. · Gobardhanpur This is a LDTW having a command area of 40 ha with 150 numbers of beneficiaries. 75% of the beneficiaries belong to minority community. The scheme was installed in 1983. The scheme is useful for 1 harvest in a year. This is a flood prone area and so cultivation is difficult. The beneficiary can only cultivate Boro paddy. But that too is hampered due to prolonged and frequent load shedding and also low voltage. During rest of the year farmers work as daily laborer. The beneficiary committee is not very active. The committee has only 5 members. Regarding management of the scheme by themselves they are not interested. The drinking water scarcity is also found in the village. There is one big pond at the entrance of the village used for fishery. The village has got 2 ICDS centre, 2 Primary schools, 2 High schools. The health centre is 8 km away. There exist 2 defunct SHGs without any specific activities. · Aklabad, Egra This Minor Deep Tube Well covers 40 ha with 1200 beneficiaries. All beneficiaries are marginal farmers. The scheme was installed in 1983 and facilitates 2 harvests a year. The beneficiaries here are fully dependant on agriculture. They face problems like load shedding and low voltage. As a result they do not have adequate water in the field. Standing crops often suffer and the yield reduces. The beneficiary committee exists with 8 members. They have appointed supervisors to look after water distribution, tax collection, etc. Government operators are absent most of times because of official works in BDO office. The area is flood prone. Beneficiaries engage themselves in jobs like daily labourer, in the village or go nearby places in search of jobs. The village has got ICDS centre and 1 Primary school. High school is 2 km away. There are 2 SHGs and they engaged in mat weaving and other social work. · Barakumarda This is a HDTW that covers an area of 30 ha with 108 beneficiaries. The scheme was installed in 1994. The beneficiaries are 80% marginal and 20% small farmers. They can harvest one crop a year. The beneficiary committee has 5 members. Two beneficiaries operate the pump almost every day as the government operator hardly comes. They are paid Rs 8000 per season by the beneficiary committee. The beneficiaries cultivate Boro but they can not do it properly because of frequent load shedding and low voltage. As a result they use private shallow tube wells. The SA team has seen 8 such shallow pumps. In absence of work during rest of the year young people migrate to Delhi and Gujarat. Page 66 Social Assessment of WBADMI Project Final Report 62 The village has got 2 ICDS centers, 2 Primary schools, 1 High school. There are 72 SHGs formed but all their activities were not known. A few activities mentioned were mat weaving, mid day meal cooking in schools, etc. A brief detail of the schemes is given in Table 5.13. Name of the district: Purba Medinipur 1 Name of the block: Egra - I Patashpur - II Patashpur - II Patashpur - II Patashpur - II 2 Name of the scheme: Aklabad DTW Barakumarda HDTW Chakbhabani DTW Gobardhanpur LDTW Lochubad HDTW 3 Type of the scheme: DTW HDTW DTW (Choked) LDTW HDTW 4 Type of the beneficiary: Marginal Farmer = 100, Total = 100 Marginal Farmer = 80, Small farmers =20 Total = 100 Marginal Farmer = 350, Total = 350 Marginal Farmer = 145, Small farmers = 5 Total = 150 Marginal Farmer = 92, Small farmers = 8, Total = 100 5 Cultivable Command Area (CCA): 40.41 ha. 28.33 ha. 40.41 ha. 40.41 ha. 30 ha 6 Villages benefitted: - Pradhanpara, Bera Para, Jana Para, Singha Para, Samanta Para. Multiple cropping is practiced. Bera Para, Ghoraipara, Garai Para, Jana Para, Patra Para West Gobardhanpur, East Gobardhanpur - 7 Crops and cropping pattern: Aman and Boro. Multiple cropping pattern is practiced. Boro Boro Boro Boro. Multiple cropping pattern is practiced. 8 Type of soil: Alluvial Clay Clay Sandy Sandy 9 Cropping Intensity and crop yield: - - - - - 10 Maintenance: Maintained by the Department Maintained by the Department Maintained by the Department Maintained by the Department Maintained by the Department 11 Educational Background of the Beneficiaries: Above primary Above primary Upto primary Above primary Above primary 12 No. of Educational Institutions: ICDS = 2, Primary School =1, High School = 1, SHG=1 (They are involved in Mat weaving, Social work). ICDS = 2,Primary School =1, High School = 1, Health Centre=1 SHG=72 ICDS = 2,Primary School =3, High School = 1, Health Centre=1 SHG=10 (They have no such work but few engaged in mid- day meal cooking) ICDS = 2,Primary School =2, High School = 2, Health Centre=1 SHG=2 (They are not involved in any work ) ICDS = 1,Primary School =1, High School = 1, Health Centre=1 SHG=1 (Involved in DWACRA Programme ) 13 Average Family size: - 6 members. - 8 members 6 members. Page 67 Social Assessment of WBADMI Project Final Report 63 14 Electricity Supply: Main problem is load shedding and low voltage. Low voltage and load shedding is the main problem. - No electricity in these villages Load shedding and low voltage is the main problem 15 Other Informations Farmers cannot get necessary water for cultivation for long time due to load shedding and low voltage. 99% of the farmers depend on cultivation. Beneficiary Committee formed with 5 members including MLA representative and Sabhapati representative. 2 beneficiaries supervise the water distribution and operate the machine all time because Govt. operator hardly comes. Beneficiary Committee formed with 5 members. 2 beneficiaries supervise the water distribution and operate the machine. Their remuneration is Rs. 5000/- per season for 2 persons and tax amount is Rs. 900 / acre including above mentioned. This mouza is heavily flood prone zone and for this reason farmers can cultivate only Boro. Due to load shedding and low voltage farmers cannot cultivate whole land in the season. Other than one time cultivation farmers are working on masonry, daily labour in another place. Farmers are mostly school final passed. Beneficiary Committee exists with 8 members. 2 beneficiaries supervise the water distribution and operate the machine in absence of Govt. operator. Maximum time operator from beneficiary operates the machine. 5.4.7 BIRBHUM - 5 MI Schemes · Gara, Dubrajpur This Light Duty Tube Well Centre (as the beneficiaries call it) covers 30 ha of land and has got 90 beneficiaries. 88% of these beneficiaries are marginal farmers. The scheme was installed in 1973 and the farmers get 3 crops a year. The beneficiary committee does the usual work of water distribution and collection of tax. The committee has appointed 1 person to look after the water distribution and pay him either in cash or kind with crops collected from the beneficiaries. During interaction it was learnt that the power supply was good. They also informed that they do not migrate outside village for jobs. Regarding management of the scheme by their committee they are not ready and informed that they are not interested in handed over schemes. The village has got 1 ICDS centre, 1 Primary school, 1 High school and 1 Health centre. SHGs exist but number not known. They are mostly engaged in mid day meal cooking. · Ramnagar, Illambazar This Light Duty Tube well covers 20 ha of land and has 80 beneficiaries. It was established in 1973. The farmers of this scheme harvest 3 crops a year. The Page 68 Social Assessment of WBADMI Project Final Report 64 beneficiary committee has 11 members and look after water distribution and tax collection. The committee has appointed 1 person for water distribution and he gets Rs10/per bigha. The committee has appointed 1 person as night guard. He also gets the same remuneration. The beneficiaries informed that they do not have problem with the supply of electricity. They do not also have the problem of migration from the village as they harvest 3 crops a year. They mentioned the need for training for operation and maintenance of pump. They do not want to take over the responsibility of the scheme. The village has got 1 ICDS centre, 1 Primary school. High school and Health centre are far from the village. There are 8 SHGs and they are engaged in NREGS and mid day meal programmes. · Khorui, Dubrajpur This Light Duty Tube Well cluster covers 20 ha of land and has 85 beneficiaries. The scheme was installed in 1973 and gives 3 crops a year to its beneficiaries. 92% of the beneficiaries are marginal farmers. The beneficiary committee exists with 7 members. The farmers informed that they pay taxes as per government rates. The committee has appointed 1 person for water distribution and pays him for that. They operate the pump in absence of government operator. The electricity supply is normal and there is no migration from the village. The village has got 2 ICDS, 1 Primary school, 1 high school. There exist some SHGs and they work for mid meal programme. · Sarparajpur, Lavpur This is a major RLI scheme. The command area is 60 ha and it has 250 beneficiaries. The scheme was installed in 1992 and was handed over to the beneficiary committee in the same year. The beneficiaries can harvest 2 crops a year from this scheme. The scheme is diesel operated. The pump is not run throughout the day. They suggested that the scheme should be electrified to reduce the cost of operation. The village has got 1 ICDS centre, 1 Primary school, 1 High school and 1 Health centre. The SHGs that exist are engaged in mid day meal programme. · Laldaha, Sriniketan This RLI scheme covers 100 ha and has got 300 beneficiaries of whom 50% are ST. The scheme was commissioned in 1992 and was handed over in 1993. It gives 2 crops a year. This is diesel run scheme. The beneficiaries have to pay for fuel as per land size. The beneficiary committee is not very active. The schemes work during rainy season more efficiently. The beneficiaries have arranged for two submersible pumps to continue cultivation for the whole year. The farmers suggested for electrification of the scheme to increase its cost benefit efficiency. Page 69 Social Assessment of WBADMI Project Final Report 65 The village has got 1 ICDS centre, 3 Primary schools, 2 High schools and 1 Health centre. SHG members are engaged in mid day meal cooking. A brief detail of the schemes is given in Table 5.14. Name of the district: Birbhum 1 Name of the block: Bolpur - Sriniketan Dubrajpur Dubrajpur Ilambazar Lavpur 2 Name of the scheme: Laldaha MI Gara DTW Clusters. Kharui DTW Clusters Ramnagar DTW Clusters Sarparajpur MI. 3 Type of the scheme: RLI - Mini DTW DTW DTW RLI – Major (River - Kuye) 4 Type of the beneficiary: Marginal Farmer = 280, Small Farmer = 10, Big Farmer = 10, Total = 300. Marginal Farmer = 88, Small Farmer = 2, Total = 90. Marginal Farmer = 80, Small Farmer =5, Total = 85. Marginal Farmer = 76, Small Farmer =4, Total = 80. Marginal Farmer = 250, Total = 250. 5 Cultivable Command Area (CCA): Aman = 100 hectare, Wheat = 30 hectare, Veg. = 50 hectare 26.31 ha 20.24 ha 20.24 ha 60.70 ha 6 Villages benefitted: Sarpalehana, Laldaha, Sarbanandapur, Barkahena, Kalaharpur, Honudanga, Baradanga - - Gopalnagar, Kamarpara, Ramnagar. - 7 Crops and cropping pattern: Boro, Wheat, Mustard. Multiple cropping is practiced. Aman, Wheat, Vegetables, Mustard, Boro. Multiple cropping is practiced. Aman, Wheat, Veg., Mustard, Boro. Multiple cropping is practiced. Aman, Wheat, Veg., Mustard, Boro. Multiple cropping is practiced. Boro, Wheat, Mustard. Multiple cropping is practiced. 8 Type of soil: Loamy & Clay Sandy Sandy Sandy Sandy, Loamy 9 Cropping Intensity and crop yield: - Boro = 5 quintal/bigha, Mustrad = 7 kg/katha. Boro = 5 quintal/bigha, Mustrad = 8 kg/katha Boro = 5 quintal/bigha, Mustrad = 8 kg/katha - 10 Maintenance: Beneficiary (partially) Maintained by the department. Maintained by the department. Maintained by the department. Beneficiary Committee 11 Educational Background of the Beneficiaries: Have average literacy Above primary Above primary Above primary Have average literacy 12 No. of Educational Institutions: ICDS = 3, Primary School = 3, High School = 2, Health Centre = 1, SHG exist (engaged in mid-day meal cooking). ICDS = 1, Primary School =1, High School = 1, Health Centre = 1, SHG exist (engaged in mid-day meal cooking). ICDS = 2, Primary School =1, High School = 1, Health Centre = 1, SHG exist (engaged in mid-day meal cooking). ICDS = 1, Primary School =1, High School = 1, Health Centre = 1, SHG = 8 (engaged in mid-day meal cooking). ICDS = 1, Primary School =1, High School = 1, Health Centre = 1, SHG (engaged in mid-day meal cooking). Page 70 Social Assessment of WBADMI Project Final Report 66 13 Average Family size: - - - - - 14 Electricity Supply: - Electricity supply and voltage condition is normal Electricity supply and voltage condition is normal - - 15 Other Informations: There is no Beneficiary Committee. Only in rainy season this RLI works and other time it remains closed as the canal become dry. Diesel is used as fuel. Fuel cost is paid by each beneficiary as per his / her land size. They use 2 submersible pumps to continue the cultivation for whole year. They have suggested for electric supply in this RLI. 50% of the beneficiaries are ST. Beneficiary Committee exists. Beneficiaries pay taxes. Boro – Rs. 816 / acre as per Govt. rule. 1 person from beneficiaries supervises the water distribution and operates the pump in absence of Govt. operator. No. local migration occurs. Beneficiaries are not ready and not interested for handover scheme. Beneficiary Committee exists. Beneficiaries pay taxes for Boro – Rs. 816 / acre as per Govt. rule. 1 person from beneficiaries supervises the water distribution and operates the pump in absence of Govt. operator. No. local migration occurs. Beneficiaries are not ready and not interested for handover scheme. Beneficiary Committee exists with 11 members. Beneficiaries pay taxes for Boro – Rs. 816 / acres as per govt. rule. 1 person from beneficiaries supervises the water distribution and operates the pump in absence of Govt. operator and 1 person from beneficiaries work as night guard. For these 2 persons beneficiaries collect Rs. 10 / bigha for each crops as remuneration. No. local migration occurs. Farmers are mostly Madhyamik and HS passed. They are not ready for handed over scheme. Beneficiary Committee exists. Beneficiaries pay taxes as per Govt. rule. They have suggested for electric supply. Other data not available. 5.4.8 PASCHIM MEDINIPUR - 8MI Schemes · Amrakuchi, Keshpur This is a MDTW covering 20 ha of land and has got 200 marginal farmers as beneficiaries. 75% of the beneficiaries are SC and ST communities. There are some beneficiaries from the minority community. The scheme was installed 1993 and has created opportunity for the farmers to harvest 3 crops a year. This has the largest beneficiary committee the SA team has come across so far. The committee has 40 members. The committee has 3 operators who operate the pump during absence of the government operator. These 3 operators have got training from the department and a remuneration of Rs 2000/- a month. The farmers mentioned that the worst problem they face is load shedding and low voltage. It was informed by the farmers that the water level is decreasing day by day. Page 71 Social Assessment of WBADMI Project Final Report 67 The village has 2 ICDS centers, 1 Primary school and 1 Health centre. The High school is 2 km away. Young people go out to Delhi and Mumbai for other works. · Sonadiha, Keshpur This MDTW was created forty years back as informed by the old members of the beneficiary committee. It was re-drilled in 2007. The scheme covers an area 40 ha and has got 100 beneficiaries all marginal farmers. The beneficiaries comprise of 70% general and 30% SC. The farmers harvest two crops a year from the scheme. The beneficiary committee has 9 members. They have appointed 1 operator who operates the machine during absence of the government operator. He also looks after water distribution. He is paid Rs 3000 for the season. The farmers informed that the actual cultivable land has been decreased after re-drilling. The problem of load shedding and low voltage was mentioned by the farmers during interaction. They also mentioned the acute crisis of drinking water. This is an Arsenic prone area. They mentioned the need for training of their operator. The village has got 2 ICDS centers, 2 Primary schools, 1 SKs, 1 Health centre. High school is 1 and ½ km away. 14 SHGs exist. 4 SHG members are engaged in mid meal cooking. · Paschim Dharasole, Debra The scheme is a HDTW and was created in 1973. The command area is 28 ha and the number of beneficiaries is 100. Of the beneficiaries 80% are marginal farmers and 20% is small farmers. SC, ST and minority total to 75% of the beneficiaries. There exists a 10 member beneficiary committee. The committee has appointed 1 person to operate the machine when necessary and look after the distribution of water. This person does the work voluntarily. He belongs to the village. The problems they highlighted were low voltage arsenic, etc. The education level is good. No migration was reported. Neither the committee nor the farmers are interested in taking complete responsibility of managing the scheme. The village has got 6 ICDS centers, 3 Primary schools, 2 High schools and 1 Health centre. There are 2 SHGs engaged in mat weaving and cattle farming. · Abdalipur, Debra With coverage of 30 ha and 105 marginal farmer beneficiaries this HDTW was installed in 1973 to create facility for its beneficiaries to harvest 3 crops a year. The ST population is 75%. The scheme has 9 members beneficiary committee. The committee carries out normal task of water distribution and operation of the pumps during absence of government operator. The problem they mentioned was the low voltage. They are reluctant to take over the scheme. A section of the farmers migrate to nearby places to work as agricultural labour. Page 72 Social Assessment of WBADMI Project Final Report 68 The village has 2 ICDS centers, 1 Primary school, 1 High school. The health centre is 3 km away. The number of SHGs was not confirmed but they are engaged in ‘Zari’ work. · Kamalapur, Medinipur This MDTW has 150 beneficiaries with a command area of 20 ha. It was created in 2005 and handed over in the same year. It has potential to give 3 crops a year to its beneficiaries. 75% of beneficiaries are ST. The scheme is managed by a 9 member beneficiary committee. The committee has appointed a person to look after water distribution and pays him Rs 2000/- per month during the season. He has got informal training of operating the pump. The committee members mentioned that the electric bill is very high, Rs12000 to Rs 18000 per month. The committee gives water only for 2 bigha of Boro cultivation. The area has drinking water crisis they mentioned. The village has got 1 ICDS, 1 Primary school, 1 High school and 1 Health centre. There are 3 SHGs in the area and they are engaged in husking paddy, cattle farming, mid day meal cooking, candle making, etc. · Panchkhuri, Medinipur: This is a MDTW scheme. The command area of the scheme was not available as there were no committee members present. The departmental representative (surveyor) could not give any information. However, from the visit the SA team ascertained that the scheme has the potential command area of 20 ha. The scheme is run by the department. Two farmers were available and they mentioned that the water discharge is not adequate from the tube well. The village has got 1 ICDS centre, 1 Primary school, 1 High school and 1 Health centre. A brief detail of the schemes is given in Table 5.15. Name of the district: Paschim Medinipur 1 Name of the block: Debra Debra Keshpur Keshpur Medinipur Medinipur 2 Name of the scheme: Abdalipur - HDTW Paschim Dharasole HDTW Amrakuchi - MDTW Sonadiha - MDTW (installed - 2007) Kamalapur - MDTW Panchkuri - MDTW 3 Type of the scheme: HDTW HDTW MDTW MDTW (Replacement of HDTW which was installed - 1963) MDTW MDTW 4 Type of the beneficiary: Marginal Farmer = 105, Total = 105 Marginal Farmer = 60 , Small farmers =25, Big Farmers =15, Total = 100 Marginal Farmer = 200, Total = 200 Marginal Farmer = 100 , Total = 100 Marginal Farmer = 135 , Small farmers =15, Total = 150 - 5 Cultivable Command Area (CCA): 9.33 ha 28.33ha 20.24 ha. 40.41 ha. 20 ha - Page 73 Social Assessment of WBADMI Project Final Report 69 6 Villages benefitted: Abdalipur Purba Para, Ashrampally, Muslim Basti, Abdalipur Paschim Para Paschim Dharasole, Baucha, Satyapur, Pakpari, Tabageria, Garhkilla Amrakuchi, Dakshin Para, Uttar Para, Adibasi Para, Paschim Para. Sonadiha, Bakchuri, Pipurdah, Panchami, Dhalhara, Dogachia, Atghara. Kamalapur, Singh para, Adibasi Para, Sadgope Para, Teli Para, Brahman Para, Majhi Para Maharajpur, Panchkhuri, Nishintipur, Musripatna 7 Crops and cropping pattern: Aman, Boro, Flower, Mustard, Ground Nut. Multiple cropping pattern is practised. Aman, Boro, Mustard, Ground Nut, Vegetable, Til Multiple cropping pattern is practised. Mustard, Wheat, Ground Nut, Potato, Til, Boro. Multiple cropping pattern is practiced. Mustard, Wheat, Ground Nut, Potato, Til. Multiple cropping pattern is practiced. Aman, Boro, Wheat, Mustard, Ground Nut, Til. Multiple cropping pattern is practiced. Wheat, Mustard, Ground Nut, Til 8 Type of soil: Sandy Loamy Loamy Loamy Loamy Loamy 9 Cropping Intensity and crop yield: Boro = 9 quintal / Bigha. Aman = 8 quintal / Bigha Boro = 10 quintal / Bigha, Aman = 6 quintal / Bigha Boro = 480 kg/bigha - Boro = 9 quintal / Bigha - 10 Maintenance: Maintained by the Department Maintained by the Department Maintained by the Department Maintained by the Department Maintained by the Beneficiary Maintained by the Department 11 Educational Background of the Beneficiaries: Above primary Upto primary Average Literacy Above primary Above primary Average Literacy 12 No. of Educational Institutions: ICDS = 2,Primary School =1, High School = 1,Health Centre=1 ICDS = 6, Primary School =3, High School = 2, Health Centre=1,6) SHG = 2 (Mat weaving, Cattle farming, they get loan from Govt). ICDS =2, Primary School =1, High School = 1, Health Centre= 1. ICDS =2,Primary School =2, High School = 1,Health Centre= 1,SSK = 1, SHG = 14 (Mid- day Meal Cooking) ICDS = 1,Primary School =1, Health Centre= 1, High School = 1, SHG = 3 (Engaged in Husking paddy, Cattle farming, Mid- day Meal cooking, Candle Making) ICDS = 1,Primary School =1, Health Centre= 1, High School = 1 13 Average Family size: 5 members. 6 members. 6 members. 8 members 7 members. - 14 Electricity Supply: Low voltage and load shedding is the main problem. Low voltage is the main problem. Low voltage and load shedding is the main problem. - - - Page 74 Social Assessment of WBADMI Project Final Report 70 15 Other Informations Beneficiary committee formed with 9 members. Government operator resides in the attached quarter. Secretary of this beneficiary committee supervise the water distribution. For maintenance and operate the machine beneficiaries pay for Boro – Rs. 850 / acre Aman – Rs. 204 / acre Beneficiary Committee exists with 10 members. Govt. operator regularly operates the machine. But in his absence an operator from beneficiaries operate the machine and supervise the water distribution. But he does it voluntarily without any remuneration. He has no formal Government training for machine operation. Beneficiary Committee exists with 40 members. 3 operators from beneficiaries operate the machine in absence of Government operator. They have Government training and their remuneration is Rs. 6000/- per month is collected from all beneficiaries. Beneficiaries pay taxes and the amount is Rs. 540 / Bigha including operator’s remuneration. Beneficiary Committee exists with 9 members. 1 operator from beneficiaries operate the machine and supervise the water distribution in absence of Government operator. His remuneration is Rs. 3000/- per season, which is collected from all beneficiaries. He has no formal Government training for machine operation. Beneficiary committee formed with 9 members including President, Secretary and Cashier. 1 operator from beneficiaries operate the machine all time with remuneration of Rs. 2000/- per month. Operator is trained but formal. For maintenance and to operate the machine beneficiaries pay Boro – Rs. 1000 / bigha, Til – Rs. 750 / acre, Ground nut – Rs. 1000 / acre, Mustard – Rs. 600 / acre - Page 75 Social Assessment of WBADMI Project Final Report 71 This mouza is Arsenic prone area. Other than cultivation farmers work as labour in other place. They do not want handed over scheme due to shortage of their own fund. In this mouza 75% beneficiaries are ST, Muslims are also there. This MDTW is well maintained by beneficiaries Beneficiaries pay taxes for all crops as per Govt. rules. For Boro – Rs. 816 / acre, Aman – Rs. 204 / acre. This area is arsenic prone area. Education level is very high, in spite of that farmers are working as labour in other’s land. SC & ST community is 75%. Not interested in handed over scheme. 75% beneficiaries are SC & ST and Muslim community is also present. Water level is decreasing day by day. They do not prefer handed over scheme because of high maintenance cost. Young boys are going to Delhi, Mumbai for Gold and Jari work Beneficiaries pay taxes for all crops as per Govt. rules. For Potato – Rs. 340 / acre, Mustard – Rs. 102 / acre, Wheat – Rs. 204 / acre, Nut – Rs. 204 / acre, Til – Rs. 204 / acre. Actual cultivated area has been diminished after redrilling and installation of this MDTW. They pay huge amount of electric bill of about Rs. 12000 – 18000 per month. This MDTW is well maintained by beneficiaries. There is also limitations on water distribution. For Boro cultivation water distribution allotted only upto 2 bigha, not allotted more than 2 bigha. - - - - Drinking water crisis as water level is after 60 ft. that is arsenic prone. Young boys and farmers are educated. Local migration not occurred. In this mouza – SC 30% General 70% Farmers are maximum graduate. They do other work like, small business, labour etc. Local migration occurred. In this mouza 75% is ST. They are suggested for this type of facilities 4 or 5 more nos. There is crisis for drinking water - 5.4.9 BANKURA - 5 MI Schemes · Bonkathi, Bishnupur The scheme is a mini RLI with coverage area of 24 ha. It has got 70 beneficiaries, all small farmers. This diesel operated scheme was installed in 2005 and the scheme has been handed over. It has helped the beneficiaries to harvest 3 crops a year. It has got a 10 member beneficiary committee. The committee has one operator to look after the Page 76 Social Assessment of WBADMI Project Final Report 72 pump operation. He is also responsible to see distribution of water in the field. The beneficiaries here pay Rs 10/hr as maintenance charge. Cost of diesel is extra. Beneficiaries are better educated and have good ownership of the scheme. They suggested electrification of the scheme before the scheme is handed over to them. · Hazrapukur This MDTW can cover 20 ha of land. It has got 160 beneficiaries and all of them are marginal farmers. The scheme was installed in 1996 and has created opportunity for the farmers to harvest 3 crops a year. The beneficiary committee has 7 members. The government operator is very regular and has a good rapport with the beneficiaries. The committee has appointed an operator from the beneficiaries who operates the pump during his absence. He gets Rs1500/- per month. Regarding management of the scheme by themselves they do not prefer it. They are happy with government maintenance. Local migration occurs in the form of labourer. The village has got 2 ICDS centers, 2 Primary schools and 1 SSK. The High school is 2 km away. There is 1 Madrasa and 1 Health centre in the village. The women have 4 SHGs and the groups are engaged in Fodder farming and NREGA schemes. · Parasia, Chhatna The farmers here have a RLI scheme covering 40 ha of land. The number of beneficiaries is 112 of which 110 are marginal farmers. The scheme was installed in 1973 on the river Dwarakeswar. The farmers get 3 crops a year in the command area. The beneficiary committee has 11 members. The government operator lives in the site and is available 24 hours. Beneficiaries have their man to look after water distribution. In case of dire necessity however, one person operates the pump. The problem they mention was the erosion of the river bank. The area is flood affected. They are not willing to take handover of the scheme. The education standard is good. The village has got 1 ICDS centre, 1 Primary school and 1 Health centre. The High school is 5 km away. There are 5 SHGs and they are engaged in handicrafts and mid day meal cooking. · Radhamadhabpur The scheme has got a DTC with a command area of 25 ha. The scheme was commissioned in 1973. The scheme has got 120 beneficiaries, all marginal farmers. Farmers get 3 crops a year from the scheme. The scheme has got a beneficiary committee of 5 members. The committee has appointed 1 person to look after water distribution activities in the field and he also operates the pump when required. This person gets Rs 6000 for 4 months. Educational background of the farmers is good. At least 20% of the beneficiaries are graduates. 80% of the beneficiaries are General Caste and rest SC. Young generation is going out for higher education. The farmers apprehended that the next generation may not keep up farming as profession. Regarding handing over of the scheme they are not interested. Page 77 Social Assessment of WBADMI Project Final Report 73 The village has got 1 ICDS centre, 1 Primary school, 1 High school and 1 Health centre. There exist SHG groups but number not known. These groups are engaged primarily in mid day meal cooking. · Malpur Malpur has got a HDTW with coverage of 32 ha and the number of beneficiaries is 102. 97 farmers are marginal and the rest small. The scheme was commissioned in 1962. The beneficiaries get 3 crops a year. The committee has got 8 members and the committee has appointed 1 person to look after water distribution system. He gets Rs3000 per season. The farmers pointed out that the water level is gradually going down. They also mentioned that the spouts need immediate repair. The education standard of the village is good. However, no body goes out for work. The young generation goes for higher education. The village has got 1 ICDS centre, 1 Primary school, 1 High school and 1 Health centre. There exists 1 SHG group. The group is engaged in mid day meal cooking, tree plantation, etc. 5.4.10 24 PARGANAS (SOUTH) - 2 MI Schemes · Alghara, Baruipur The scheme is MDTW. Its command area is 20 ha and the beneficiaries are all marginal farmers. The exact year of installation of the scheme was not known. The beneficiaries get 2 crops a year. They mentioned the problem of power cut and low voltage. Farmers who have land at a distant from the scheme get less water. The tube well has high level of iron content in its water. Regarding management of the scheme they do not want to take handover schemes because of political hazards, cost of electricity and tax collection. They termed these as hidden pressure which they do not want to bear. The committee has 10 members. Committee members operate the scheme voluntarily on holidays. Education standard of the village is good. The village has got 8 ICDS centers, 8 Primary schools, 1 High school and 1 Health sub-centre. The number of SHGs was not known. However, it was mentioned that these groups are engaged in the preparation of Jam, Jelly, Sauce, Pickle, Painting brush, embroidery, etc. · Faldubi The scheme here is a MDTW. The command area is 12 ha and the exact number of beneficiaries was not known. The farmers grow Boro and Aman. The problem of load-shedding exists. In the evening they can not run the pump at all. The farmers mentioned that some of the field is higher than the water source point and as a result getting water to those points is difficult. They have to arrange alternative ways and means to take water to such points. The water has got high iron content. Due to this pipe lines are choked. They do not want the scheme to be handed over to them. Page 78 Social Assessment of WBADMI Project Final Report 74 The village has got 4 ICDS centers, 3 Primary schools, 1 High school and 1 Health centre. The number of SHGs is 3. These groups are engaged in embroidery and ‘Zari’ work. A brief detail of the schemes is given in Table 5.16. Name of the district: 24 Parganas (South) 1 Name of the block: Baruipur Faldubi 2 Name of the scheme: Basumati I Project - 3 Type of the scheme: Atghara MDTW MDTW 4 Type of the beneficiary: Marginal Farmer Marginal Farmer 5 Cultivable Command Area (CCA): 20.2 Ha. 12.14 ha 6 Villages benefitted: (8 Paras) Ghosh Para, Mondal Para, Sardar Para, Naskar Para, Madhupur, Bagberia, Nazirpur, Ghurkur. - 7 Crops and cropping pattern: Paddy, Vegetables, Fruits. Multiple cropping is practiced. Boro and Aman 8 Type of soil: Loamy Soil Loamy Soil 9 Cropping Intensity and crop yield: - - 10 Maintenance: Maintained by Department Maintained by Department 11 Educational Background of the Beneficiaries: Above Primary level - 12 No. of Educational Institutions: ICDS – 4, Primary School – 3, High School – 1, SHG – 2-3 (embroidery, Jari work) ICDS – 4, Primary School – 3, High School – 1, Health Centre – 1 SHG – 3 (embroidery, Jari work) 13 Average Family size: - - 14 Electricity Supply: Suffers power cut & low voltage The problem of load sheding exists. 15 Other Informations: Water Quality – Iron problem is very high. No Arsenic problem. In case of handover they strongly oppose due to political hazard, improper tax collection, high electricity bill and last of all maintenance. The problem of load sheding exists. In the evening they can not run the pump at all. The farmers mentioned that some of the field are higher that the water source point and as a result getting water to those points is difficult. Page 79 Social Assessment of WBADMI Project Final Report 75 This programme run by electricity, so most of the time it suffers power cut & low voltage. Some time at evening they want water for cultivation but it is difficult to operate due to voltage fluctuation.Major problem of this project is field level is very high than water source area. So field area which is away from water source cannot get sufficient water as per need. They requested to wash jammed pipeline. They have to arrange alternative ways and means to take water to such points. The water has got high iron content. Due to this pipe lines are choked. They do not want the scheme be handed over to them 5.4.11 DARJEELING - 2 MI Schemes · Falash, Fasideyoa This is a mini RLI scheme with coverage area of 25 ha. All 90 beneficiaries are marginal. The installation of the scheme is just being completed in March, 2009. The life expectation of the scheme is 15 years. It is expected that the farmers will get 3 crops a year from the scheme. Beneficiary committee formation has not been completed. However, one person has already been identified from the village and got machine operation training from the department. The scheme will be handed over to the farmers immediately after the installation is complete. Initially the department will guide the farmers in operation and maintenance of the scheme. The villagers are happy with the scheme. Presently, they hire pump set at a very high rate. Sometime, they depend only on rains. The village has got 3 ICDS centers, 3 Primary schools, 1 High school and 1 Health centre (PHC). The number of SHGs is 4. These groups are engaged in small business related to agriculture, cooking mid day meal in schools, etc. · Hatiram This is a Mini RLI scheme with coverage area of 20 ha. All 95 beneficiaries are marginal. The installation of the scheme is just being completed in March, 2009. The life expectation of the scheme is 15 years. It is expected that the farmers will get 2 crops a year from the scheme. Beneficiary committee formation has not been completed. Farmers are hopeful of benefits from the scheme. The scheme will be handed over to the farmers immediately after the installation is complete. Initially the department will guide the farmers in operation and maintenance of the scheme. The villagers are happy with the scheme. Presently, they hire pump set at a very high rate. The village has got 2 ICDS centers, 1 Primary school, 1 High school and 1 Health centre (PHC). The number of SHGs is 2. These groups are engaged in cattle farming, vegetable selling, etc. A brief detail of the schemes is given in Table 5.17. Name of the district: Darjeeling Page 80 Social Assessment of WBADMI Project Final Report 76 1 Name of the block: Phansideyoa Hatiram 2 Name of the scheme: Falash - 3 Type of the scheme: Mini RLI Mini RLI 4 Type of the beneficiary: Marginal Farmer Marginal Farmer 5 Cultivable Command Area (CCA): 24.28 ha. 20 ha 6 Villages benefitted: - - 7 Crops and cropping pattern: - - 8 Type of soil: Sandy Loam Sandy Loam 9 Cropping Intensity and crop yield: - - 10 Maintenance: Maintained by Beneficiaries Maintained by Department 11 Educational Background of the Beneficiaries: Above Primary level Above Primary level 12 No. of Educational Institutions: ICDS – 3, Primary School – 3 High School – 1,Health Centre -1, SHG – 4 (engaged in small business related to agriculture, cooking mid day meal in schools, etc.) ICDS – 2, Primary School – 1 High School – 1,Health Centre -1, SHG –2 (engaged in cattle farming, vegetable selling, etc.) 13 Average Family size: - - 14 Electricity Supply: - - 15 Other Informations: The installation of the scheme is just being completed in March, 2009. The life expectation of the scheme is 15 years. It is expected that the farmers will get 3 crops a year from the scheme. Beneficiary committee formation has not been completed. However, one person has already been identified from the village and got machine operation training from the department.The scheme will be handed over to the farmers immediately after the installation is complete.The villagers are happy with the scheme. Presently, they hire pump set at a very high rate. Sometime, they depend only on rains. The installation of the scheme is just being completed in March, 2009. The life expectation of the scheme is 15 years. Beneficiary committee formation has not been completed. Farmers are hopeful of benefits from the scheme. The scheme will be handed over to the farmers immediately after the installation is complete. Initially the department will guide the farmers in operation and maintenance of the scheme. The villagers are happy with the scheme. Presently, they hire pump set at a very high rate 5.4.12 JALPAIGURI - 7 MI Schemes · Niranjanpara, Dhupguri This is a mini RLI with coverage area of 18 ha. The beneficiaries are mostly marginal farmers and they belong to SC community. A few of the farmers are ST. The scheme was installed in 2006 and handed over to the beneficiary committee. Farmers get 3 Page 81 Social Assessment of WBADMI Project Final Report 77 crops a year from the scheme. Earlier they had to depend upon rain or hire pumps at a very high cost. The farmers informed that their income increased due to this scheme. The committee has got 9 members. The committee urged for training in pump operation and maintenance. The village has got 1 ICDS center, 1 Primary school, 1 SSK, 1 High school and 1 Health centre (PHC). The number of SHGs is 2. These groups are engaged in cattle farming, vegetable selling, etc. · Kodal Kathi, Malbazar The scheme is a Shallow Tube Well with coverage area of 4 ha. Beneficiaries are marginal farmers. The scheme was installed in 2006 and handed over to the Beneficiary committee. The farmers are getting 3 crops a year. Earlier farmers had to migrate to other places for work. The beneficiary committee has 7 members. The committee organizes meeting every month to discuss issues related to the scheme. The committee has opened a bank account. The beneficiaries belong to minority and ST communities. The village has got 5 ICDS centers, 1 Primary school, 1 SSK, 1 High school and 1 Health centre (PHC) .The number of SHGs is 7. These groups are engaged in rope making, stitching cement bags and cooking in mid day meal programme etc. · Dholabari -1100 The scheme is a STW with coverage of 4 ha. The beneficiaries are all marginal farmers and they are 20 in number. The scheme was installed in 2006 and handed over to the farmers. The beneficiary committee has 7 members. The farmers get 3 crops a year. The farmers informed that before the scheme was installed they used to cultivate only wheat and potato. The committee meets every month to discuss about the scheme. The committee has bank account also. The village has got 1 ICDS center, 1 Primary school, 1 High school, 1 MSK and 1 Health centre (PHC). · Dholabari-1400 The scheme is a STW with coverage of 4 ha. The beneficiaries are all marginal farmers. The scheme was installed in 2006 and handed over to the farmers. The beneficiary committee has 9 members. The farmers get 3 crops a year. The farmers informed that before the scheme was installed they used to cultivate only wheat and cabbage. Now they cultivate wheat, vegetables, oil seeds, potato, maize, aman paddy. The committee meets every month to discuss about the scheme. The committee has bank account. The village has got 1 ICDS center, 1 Primary school, 1 High school, 1 MSK and 1 Health centre (PHC) 1 SHG which is mostly engaged in cattle farming Page 82 Social Assessment of WBADMI Project Final Report 78 · Dholabari-449 The scheme is a STW with coverage of 4 ha. The beneficiaries are all marginal farmers. The scheme was installed in 2006 and handed over to the farmers. The beneficiary committee has 7 members. The farmers get 3 crops a year. The farmers informed that before the scheme they used to cultivate only wheat and potato. Now they cultivate many other crops. The committee meets every month to discuss about the scheme. The committee has bank account. The village has got 1 ICDS center, 1 Primary school, 1 High school, MSK 1. · Dholabari-1133 The scheme is a STW with coverage of 4 ha. The beneficiaries are all marginal farmers. The scheme was installed in 2006 and handed over to the farmers. The beneficiary committee has 7 members. The farmers get 3 crops a year. The farmers informed that before the scheme was installed they used to cultivate only wheat and potato. Now they cultivate many other crops. The committee meets every month to discuss about the scheme. The committee has bank account also. Some beneficiaries do small business. The village has got 1 ICDS center, 1 Primary school, 1 High school, MSK 1. There exists 1 SHG and the group is engaged in cattle farming etc. · Dholabari-1133 The scheme is a STW with coverage of 4 ha. The beneficiaries are all marginal farmers. The scheme was installed in 2006 and handed over to the farmers. The beneficiary committee has 7 members. The farmers get 3 crops a year. The farmers informed that before the scheme they used to cultivate only wheat and potato. Now they cultivate many other crops like Aman, oil seed, vegetables, etc .The committee meets every month to discuss about the scheme. The committee has bank account. Some beneficiaries do small business. The village has got 1 ICDS center, 1 Primary school, 1 High school, MSK 1. There exists 1 SHG and the group is engaged in cattle farming and puffed rice business. 5.4.13 BURDHWAN - 3 MI Schemes · Bharpeta, Mamudpur This is a HDTW with a command area of 50 ha. But the farmers cultivate only 40 ha. The exact date of installation of the scheme was not known. The committee has got 7 members and all 300 beneficiaries are marginal farmers belonging to general caste. The scheme has created opportunity for the farmers to harvest 3 crops a year. The scheme has been handed over to the farmers and they are maintaining it well. Electricity supply is good. Page 83 Social Assessment of WBADMI Project Final Report 79 The village has got 2 ICDS centers, 1 Primary school, 1 High school, SSK 1. There exists SHGs and the groups are engaged in ‘beedi’ making, bamboo crafts, etc. · Sankarpur This is a LDTW scheme. It covers 22 ha. The number of beneficiaries is 200. They are all marginal farmers. The scheme has been handed over to the farmers. They get 3 crops a year. The committee has got 7 members. The farmers mentioned the problem of low voltage. Beneficiaries belong to SC and ST communities. The village has got 1 ICDS center, 1 Primary school, SSK 2, and 1 Crèche for tribal children. There exists SHGs and the groups are engaged in cattle management, cooking and rice cleaning. · Sankarpur, Purbapara This is a HDTW scheme. It covers 66 ha. The number of beneficiaries is 400. They are marginal and small farmers. The scheme has been handed over to the farmers. They get 2 crops a year. The committee has got 15 members. The farmers mentioned the problem of low voltage. The village has got 1 ICDS center, 1 Primary school; High school is 2 km away. There exists 9 SHGs and the groups are engaged in cattle management, cooking and rice cleaning. There is one club of tribal women and this club has got a SHG. They give loan to the farmers. 5.4.14 PURULIA - 2 MI Schemes · Nildi, Raghunathpur This is a major RLI scheme covering 60 ha of land with 130 members as beneficiaries. Majority of them are SC. The scheme was installed in 1985 with diesel operation. The scheme was electrified in 1998. The voltage remains stable upto 5 p.m but falls down after that. The farmers harvest 3 crops a year. It has a regular beneficiary committee. The operator is locally stationed and operates the pump when required. The farmers mentioned the problem of migration to Orissa and Asansol. The village has got 3 ICDS centers, 2 Primary school, 1 High school, 2 SSK. 1 Health sub centre nearby. There exist 3 SHGs and the groups are engaged in puffed rice making and cooking. · Solanchi: This is a major RLI scheme covering 60 ha of land with 122 families as beneficiaries. Majority of them are SC. The scheme was electrified in 2008. The scheme has a beneficiary committee with 9 members. The voltage remains stable upto 5 p.m but falls down after that. The farmers harvest 2 crops a year. It has a regular beneficiary Page 84 Social Assessment of WBADMI Project Final Report 80 committee. The operator is locally stationed and operates the pump when required. The farmers mentioned the problem of migration to Asansol as daily labourer. The village has got 1 ICDS center, 1 Primary school, 1 High school, 1 SSK. There exist 4 SHGs and the groups are engaged in puffed rice, bamboo crafts and plantation nursery. 5.4.14 MALDA - 4 MI Schemes · Mandirpur, Old Malda: This is a HDTW scheme commissioned in 1962. It was re-drilled in 2009. It covers 40 ha. The number of beneficiaries is 100. They are marginal and small farmers. The beneficiary has got a 12 member beneficiary committee. The farmers get 2 crops a year. A small group of farmers go nearby places for work in industries like jute, silk, etc. The farmers mentioned the problem of low voltage. The village has got 1 ICDS centre, 1 Primary school, High school is 4 km away. 50% of the beneficiaries belong to minority groups and the rest 50% are SC/STs. There exists 3 SHGs and the groups are engaged in cattle management, cooking and rice cleaning. · Musadanga, Bhabanipur, Gajol: This HDTW scheme is a handed over scheme. It can cover an area of 40 ha. The beneficiaries are marginal and small farmers. The beneficiaries have got a 12 member beneficiary committee. The farmers get 3 crops a year. A few beneficiaries go to Gajol as daily labourers. Some go outside the state for Masonry work. The village has got 1 ICDS centre, 1 SSK and 1 Primary school. There is 1 health sub centre. There exists 2 SHGs. · Atgama, Kanchamitha Khari, Gajol: This is a small canal that allows water to flow from Uttar Dinajpur border to South of Gajol Block in Malda. The department has taken up excavation work for the canal so that water remains longer after the rainy season. The canal has been divided into 28 ponds along its length. Each pond has got a 3 meter length wall with the next pond. The objective is to store more water and allow the farmers having land in the vicinity of each pond to lift water during cultivation. The command area is 60 ha and there are 70 beneficiaries. Most of the beneficiaries are STs. There is no beneficiary committee. Each beneficiary lifts water on his/her own cost. The village has got 1 ICDS centre, 1 SSK and 1 Primary school. The high school is 1 km away from the village. Health sub centre is 2 km away. The female folks of the village have got 4 SHGs. The SHGs get loan for agricultural purpose. Migration to Delhi and Gujarat is there for masonry work. The village has got electricity. Page 85 Social Assessment of WBADMI Project Final Report 81 · Khusha Khari, Bamongola: The area has a catchment of 80 ha. The water goes waste through a canal at the downstream of the catchment. The department is constructing two spillover dams along the canal so that water can be reserved at the upstream and farmers can lift water for their fields. The lifting cost will be borne by the farmers. With this arrangement 16 ha can be cultivated and 60 farmers will be benefited. The beneficiaries are all Rajbansis. They are participating in the construction of the dams. The village has got 1 ICDS centre, 1 SSK and 2 Primary school, 1 high school which is 2 km away from the village. Health sub centre is also 2 km away. There are 2 SHGs. The SHG members are engaged in Mid Day Meal cooking, fish business, etc. Migration to Delhi, Tamil Nadu and Bangalore is found among some of the farmers for masonry work. 5.4.16 COOCHBEHAR - 3 MI Schemes · Chilakhana, Tufanganj: This is a MDTW scheme which covers a command area of 20 ha benefiting 64 farmers. This is a handed over scheme. The scheme was handed over to the beneficiary committee in the year of installation, i.e. 2005. Beneficiaries get two crops namely Pre-Kharif and Kharif. Most of the beneficiaries are small farmers. The village has got 1 primary school and 1 SSK. High school is far. Health centre is also 4 km away. 5.4.17 DAKSHIN DINAJPUR · Katapoor Beel, Gangarampur: This is a beel (lake) which gets sufficient water during rains. It has got a huge catchment area of 1.98 sq. km. The potential command area is 193 ha. The scheme has got 390 beneficiaries of which 125 SCs, 90 STs and 175 others. Beneficiaries get 2 main crops and some grow three crops also. The water is lifted by small pumps and they bear the cost of diesel and service charge for the water used. The village has got 1 primary school, 1 SSK, 12 SHGs. People do not migrate from the village. 5.4.18 UTTAR DINAJPUR · Fulatti, Kaliaganj: This is a HDTW scheme established in 1967 with a command area of 16 ha serving 70 beneficiaries. 78% of the beneficiaries are marginal farmers. The scheme gives 3 crops to the farmers. It has got a beneficiary committee consisting of 8 members. Most beneficiaries grow boro. Page 86 Social Assessment of WBADMI Project Final Report 82 The villagers migrate for temporary work as daily laborer. The village has got 1 Primary School and 1 SSK. SHG exists but the number could not be known. 5.5 CONCLUSIONS The overall impact of the minor irrigation projects commissioned is positive and has led to increase in production and productivity in the project areas contributing to the overall socio-economic development of the area. The ownership of these projects could be transferred to the beneficiaries through an extensive process of motivation, counseling and training for well organized running and maintenance for the post project period. Agriculturist/interested volunteers may be identified from the local educated/under employed youth and through proper training they may be made to work as links between the beneficiaries and the department. The department has shortage of staff resulting in more than one project required to be handled by one employee. This sometimes contributes to problem in monitoring and interaction with the local farmers on need basis. The department may take help of the land revenue department in obtaining Mouza / village maps for each project where it is lacking. This village maps showing the plot numbers help the farmers to properly demarcate the command area of each farmers and at the same time help in economic application of irrigation water thereby reducing chance of irrigation water going waste. 5.6 OPPORTUNITIES, CHALLENGES, RISKS AND ISSUES The state of West Bengal is mainly dependent on agriculture. Out of 88.752 lakh hectares, the net cropped area is 52.95 lakh hectares i.e. 60% of the total area of the state. Gross cropped area is 95.33 lakh hectares with cropping intensity of 180.04%. The cropping intensity increased from 155% in 1992-93 to 180% in 2007-08. The main reasons of increase in cropping intensity are multiple cropping practices by farmers and extension of minor irrigation facilities. Minor irrigation practices are very much popular in the farmers’ community since it is manageable by them. The state is divided into three agro-climatic zones with six sub regions with varied characteristics. According to Agricultural census 2000-2001, there was more than 6.78 million operational holding in the state of which small and marginal holdings accounted for 80.4%. Details of land holdings are given in Table 5.18 . Page 87 Social Assessment of WBADMI Project Final Report 83 Table 5.18: Break-up of Land Holding Pattern (2000-2001) Size Class Number of Operational holding Area (ha) Marginal (Below 1.00 ha) 5462089 (80.4%) 2758843 (49.7%) Small (1.00 to 2.00 ha) 1009328 (14.9%) 1606688 (29.1%) Medium (2.00 to 4.00 ha) 282992 (4.2%) 783773 (14.1%) Large (4.00 to 10.00 ha) 3497 (0.5%) 178298 (3.2%) 10.00 ha and above 785 (negligible) 218976 (3.9%) Total 6789991 (100%) 5546576 (100%) The surface and ground water available in the state are sufficient in respect of quantity. But there is some constraints in quality of ground water in some parts of the state. Moreover, shortage of surface water towards the end of lean months poses challenge particularly following inadequate monsoon rainfall. The CCA under minor irrigation has increased by about 25% in 2000-2001 than that of 1987-88. The Water Resources Investigation and Development Department, GOWB, has conducted 4 Minor Irrigation censuses so far. The figures of CCA (Culturable Command Area) on Minor Irrigation Schemes against each census are shown in Table 5.19. Table 5.19 : CCA under Minor Irrigation Schemes Sl. No. Census Year CCA 1 1987-88 (first MI census) 1681046 ha 2 1993-94 (2 nd MI census) 1928275 ha 3 2000-01 (3 rd MI census) 20958490 ha. 4 2006-07 (4 th MI census) Report under validation stage The Minor Irrigation in the state comes under the Water Resources Investigation and Development Department of Govt. of West Bengal. Two Directorates and two Corporations operate under the administrative control of the said department. Any Irrigation scheme having command area up to 2000 ha and less comes under Minor Irrigation Schemes. The Directorate of Water Resources Development under Department of Water Resources Investigation & Development is responsible for planning, execution, operation and maintenance of Minor Irrigation Projects in the state. For some time past completed schemes are handed over to the Panchayat for operations and maintenance. The West Bengal State Minor Irrigation Corporation operates and maintains its own schemes. Page 88 Social Assessment of WBADMI Project Final Report 84 The State Water Investigation Directorate is responsible for monitoring of quantity and quality both surface and ground water in the state and regulates the sinking of tube wells aided by Ground Water Act in the State. The West Bengal Agro Industries Corporation is looking after the needs of Agricultural and Minor Irrigation implements. 5.6.1 Opportunities & Challenges in Minor Irrigation System in West Bengal Challenges ¾ Problems with the source Major Challenges are: · Drying up of surface water or depletion of ground water level. · Damage & leakage in water transmission line and theft of different accessories. · Construction of field channels. · Tampering of field outlets. · Timely availability of power & fuel oil. ¾ Operation & maintenance Major Challenges are: · Generating initial fund for operation and maintenance of a newly handed over scheme. · Replacement of Engine, pump and motors · Theft of power line. · Increasing fuel cost. · Revenue generation and accounting process · Deferred maintenance of defective pump, motor & engines · Inter & intra users’ conflicts of interests, benefits and expectation ¾ Institutional challenges: · Establishing interdepartmental coordination and convergence starting from state to village level Page 89 Social Assessment of WBADMI Project Final Report 85 · Establishing good governance (capacity building) · Formulations & strengthening of local institutions · Linkage and integration of local institutions with various public and private institutions and with Panchayat Raj Institution. · Market linkages ¾ Challenges relating to financial and manpower resources mobilization and utilization: · Local level resource generation to share O&M costs in terms of money & labour · Manpower development of both water users and service providers 5.6.2 Socio-Economic Profile of the Project Areas In the past projects there is no systematic recording of the socio-economic profiles of the area benefited. The SA team during visits tried to understand the situation in this context. It is indeed a heartening experience that almost 99% of the beneficiaries belong to marginal and small farmer categories. But other factors like involvement of women in management etc were not visualized. Out of 109 M.I. schemes visited the SA team has found only in one scheme women member in the beneficiary committees. Land ownership is also male dominated in most cases. Problems like drinking water, Health & Sanitation, were not felt. Even the mouza maps could not be made available in 95% of the projects. 5.6.3 Sub-Project Cycles As mentioned earlier the process of planning in these schemes is very much centralized in nature. The schemes were designed and implemented by the department in general. Where the question of private land arose the department consulted the beneficiaries for procurement of land on donation. The new schemes (after 2005) have followed better planning process. There are many conflicts observed regarding distribution of water. Farmers having land at a distant from the pump have complaint of inadequate water in their field. The SA Team suggest that a participatory process should be followed regarding selection of project site, formation of beneficiary committee, future maintenance plan, etc. 5.6.4 Communication strategy Communication strategy centering the schemes was found to be weak. The maximum coordination in the electrically run schemes required between two important departments is State Electricity Board and the Water Development Department. Rapport with the Land Revenue Department is also very invisible. Mouza maps have not been obtained for Page 90 Social Assessment of WBADMI Project Final Report 86 many of the schemes and the proper demarcation of the command area was not possible on a reliable map. Almost in 90% M.I. schemes the visibility of the scheme is nil. There is no sign-board depicting the details of the scheme like name of the scheme, year of installation, type of scheme, water discharge capacity, number of beneficiaries, potential command area, etc. In one or two recently handover schemes visibility boards with name of the scheme were found. The SA team has got no information regarding the system to regularly meet the beneficiaries and discuss issues. The beneficiaries could be motivated about the ownership of the schemes. The department should make efforts to convince the beneficiaries about the huge amount of subsidy the department is to bear on account of the schemes. The SA Team suggests that Communication Board for every project needs to be erected at the site of the project depicting the details of the scheme. The Beneficiary Committee may think of introducing a Running Board to display current information of each farming season. This board may be used as a tool for public disclosure regarding tax collected, defaulters, any expenditure on maintenance, etc. 5.6.5 Participation Framework There is no concerted effort observed regarding creation of a systematic participation process in management of the scheme. The SA team has not come across news of training of Beneficiary committee members on project management, financial management, etc organized by the concerning department. The beneficiary committees, in most cases are not registered. They function as a loose committee without legal status. The SA team is not sure of their status for bank loan, etc. The minutes of the beneficiary committees are not recorded in most cases. These are the areas to be looked into seriously if the schemes are to be run by the beneficiaries. 5.6.6 Institutional Arrangements at Local Level In cases of old schemes people’s participation was not well understood and reflected in the project formulation and implementation. The farmers are found to be ignorant of the selection process of the sites, beneficiaries, etc. However, beneficiary committees have been formed during launching and operation of the project. Panchayat’s representative is there in every beneficiary committee. Panchayat’s involvement has been highlighted in the project formulation but it needs to be further strengthened in cases of handover schemes. The SA team feels that there should be a block level and district level irrigation committee for the same with adequate representation from the people, local experts and Panchayat. 5.6.7 Willingness and ability to pay The SA team found that the beneficiaries under the department run schemes pay their taxes as decided by the government. However, there are cases of defaulters. But in all the M.I. schemes the farmers are found to be agreeable to pay taxes. The question of initial cost sharing found to be an unacceptable proposition to the farmers. It is revealed that due to ignorance of many details of the scheme they are reluctant to do so. They need to be informed about the scheme before it is commissioned. The cost sharing in cases of Page 91 Social Assessment of WBADMI Project Final Report 87 handover schemes is far better. They pay more taxes than the department run scheme beneficiaries. Their water distribution management is also better. 5.6.8 Indicators and baseline values for monitoring and adverse impact and mitigation measures It is suggested that before preparing the details of any scheme the base line data needs to be collected thoroughly and the status of beneficiaries before the launching of the scheme have to be documented. This data will then be compared with the change of status of beneficiaries, change in the pattern of cultivation, productivity, migration, and even family income. The effect and benefit of the scheme will thus be well visualized. This comparison will also help in motivating people of other areas where new schemes need to be established. The following variables may therefore be considered for both base-line and end-line assessment. · Landholding vis- à-vis productivity of each farmer. · Cropping intensity. · Number of days a farmer is engaged in his/her own land. · Migration status. · Children’s education status. 5.6.9 Adverse impact and mitigation measures Socially, it is very difficult to foresee what type of adverse impact may happen for any project. Generally, a SWOT (Strength, Weakness, Opportunity and Threat) analysis is done for all projects and this gives us an opportunity to visualize probable adverse impact that a project may have. However, there may be causes of adverse impact due to unprecedented national or international incidents like the global economic slowdown of 2008. The best way to face any adverse impact on any project is to increase the ownership of the project to its maximum by the beneficiaries. Concerted effort by the department has to be there from the very beginning. 5.6.10 Land Acquisition and Resettlement This point was discussed in detail because there was no single scheme found where the department had to acquire land and faced any problem thereof. In some schemes the command area has been reduced due to growth in habitation. In such cases the beneficiaries themselves have built dwellings. So no legal complication arose. However, in cases of water harvesting tanks the department should examine the nature of the ownership of the ponds and catchment areas. During the visit of the SA team to one privately owned M.I. schemes it was found that the farmers wanted regulation of water distribution. This type of problem needs to be resolved at the beginning else the beneficiaries face problem in the future. Page 92 Social Assessment of WBADMI Project Final Report 88 5.6.11 Public Disclosure regarding the project and the schemes The SA Team suggests that the ADMI project may develop its own website and e- magazine. Beneficiary committee members may be trained to upload their opinions in the e-magazine. An interactive process may thus be started between the beneficiaries and the department. Scope for third party opinion should also be there. The e-magazine may accommodate the best practices of projects to inspire beneficiaries of other projects. The department should also upload new innovations, technical inputs in the e-magazine to upgrade the knowledge of the beneficiaries. At every project site all relevant data regarding the amount of tax collected, actual command area, beneficiary details with land holding, command area map, etc should be readily available for any visitor to the project site. The beneficiary committee should prepare yearly statement of Receipt and Payments with the help of local chartered accountant and keep the books of accounts properly. This will augment the transparency of the project operation and create better understanding among the beneficiaries. If required the beneficiary committee may be given training on book keeping and maintenance of accounts. 5.6.12 General Comments · In 90 % of the visited M.I. schemes there is no visibility mark that the projects run or are commissioned by the department. · In most cases the life span of the projects has been over and as a result the efficiency has reduced. · Water loss is a common problem in all the sites. · Absence of Mouza maps in the schemes sites in almost all the places. Cannot restrict water being drawn to non-beneficiary lands. · Farmers having land far from the vicinity of the pumps or spouts often get inadequate water. · Problem of low voltage is common to most of the project areas. · Fixed length of pipes (500 m or so) to connect spouts poses problems in case of a rectangular size command area. As a result adequate number of spouts can not be put in place. · Due to rise in cropping intensity the agricultural labour migration has come down but migration of young educated persons from the villages has increased. Even migration to far away states like Mumbai, Gujarat, Chennai etc. was also found where young people go for jobs like ‘Zari’ work, stone polishing, etc. As a result farmers’ face shortage of farming labourer in their families. · Productivity has increased but there is a general tendency to cultivate ‘Boro’ even in areas where the cultivation is not suitable. Page 93 Social Assessment of WBADMI Project Final Report 89 · In all places pumps are operated by the beneficiaries during holidays, but no training has so far been organized for them. The department occasionally arranges training of its operators. · In one project area the operator was found to be a lady. It was learnt that she had been appointed in place of demise of her husband. This is good but she should have been given appropriate training for the job and her mobility to attend schemes in far place should have been considered. · At the time of commissioning of the project, some times, beneficiaries were not consulted and as a result they are afraid of taking ownership of the project. · Though most of the beneficiaries are small and marginal farmers, a little richer amongst them often uses shallow pumps to water their fields in case of water paucity. This is not viewed by the other farmers very positively. · Almost all the projects run by the department are functioning well but at a very high subsidy given by the department. It is learnt that in some places the electricity bill is pending. · It is learnt during interaction with the farmers that what they cultivate is sometime not sufficient to feed the family. The family members have to resort to other earning activities like ‘beedi’ rolling (mostly by women), small trading, fishing , giving labour to big farmers’ land in the village itself, working as daily laborers in government schemes. · It appears that the smaller the scheme the better the chances of good management by the beneficiaries. In North Bengal, these schemes are very successful. 5.6.13 Future Actions Proposed · Proper training of members of the beneficiary committee on operation and maintenance of pumps, simple accounting and book keeping, etc. · Organizing visit of members of the beneficiary committee of government run projects to handed over projects to help them believe and learn that ownership of projects will be beneficial for them in the long run. · All the beneficiary committee should be registered so that this committee is eligible for loan / support from other institutions like Panchayat, Bank, etc. · The existing self-help groups should be strengthened and where there exists no such group, formation of such Self Help Groups (SHG) should be encouraged. Specialist organizations may be contacted for the purpose. Page 94 Social Assessment of WBADMI Project Final Report 90 · Creation of alternative employment opportunities like food processing, pump repairing, electrician training, should be explored. · The farmers should be trained in basic agriculture technique like calculation of volume of water, requirement of water as per crop, minimization of water loss etc. Department may think of creation of a separate training at the district level where these committee members get training and follow-up training on a regular basis. Where possible department may think of outsourcing this facilities to suitable institution. · Sprinkler Irrigation may be introduced on an experimental basis where water is scarce. · Farmers may be motivated to change cropping pattern. They should be made to understand that cultivation of ‘boro’ may not be profitable every year when there is scarcity of water. · Department may explore the possibility of converting diesel run handed over project to electricity run project after proper training of beneficiary committee members. · Panchayat’s should be involved in helping the beneficiary committees and in monitoring of the schemes. The involvement of Panchayat’s will also increase participation of the beneficiaries. 5.6.14 List of other activities of beneficiaries · Labourers in NREGA scheme · Digging ponds and canals · Involved in share–cropping · Agricultural laborer in some other farmers’ land · Daily wage earner ™ Rickshaw puller ™ Masonry worker ™ Painter · Involved in cottage industries ™ ‘Zari’ work ™ Embroidery work ™ Mat weaving ™ ‘Beedi’ rolling ™ Tailoring ™ Making and setting power in spectacles · Migrate in neighboring villages and districts as labourer · Migrate in other states as jewellery laborer etc. · Local small business · Cattle management Page 95 Social Assessment of WBADMI Project Final Report 91 · Mid day meal cooking · Plantation Nursery Page 96 Social Assessment of WBADMI Project Final Report WAPCOS Limited 92 VI. EXISTING GOVERNANCE AND OPERATIONAL ARRANGEMENTS IN RESPECT OF MINOR IRRIGATION DEVELOPMENT The Water Resources Investigation and Development Department (WRI&DD), Government of West Bengal, is the nodal authority in the development of Minor Irrigation in the state. Two Directorates, viz., Water Resources Development Directorate (WRDD), State Water Investigation Directorate (SWID) and two Corporations, viz., West Bengal State Minor Irrigation Corporation Ltd. (WBSMIC Ltd.) and West Bengal Agro-Industries Corporation Ltd. (WBAIC Ltd.) operate under the administrative control of the said department. 6.1 ROLE OF WATER RESOURCES INVESTIGATION AND DEVELOPMENT DEPARTMENT (WRI&DD) The Minor Irrigation Sector was attached with the Department of Agriculture. The land reform programme of the state Govt. to re-distribute the ceiling surplus land to the land less poor agricultural labourers created a pressure to promote increased irrigation facilities. Small schemes, directly utilizing the sources involving comparatively less fund and with lesser gestation period, were considered necessary to accelerate the irrigation needs. Such schemes covering less than 2000 ha of command area are known as Minor Irrigation Schemes. The creation of an exclusive department for the development of Minor Irrigation in the state was felt by the state Govt. The Water Resources Investigation and Development Department, is now the nodal authority in the development of Minor Irrigation in the state. Major polices of the department in respect of minor irrigation development are · Planning, development and management of water resources · Treatment of water as an essential environment for sustaining all life form · Development, conservation, utilization and management of water resources in a sustainable manner · Judicious and scientific resource management and conservation of water resources · Increasing demands of water for diverse purposes · Elimination of the pollution of surface and ground water resources to improve water quality · A well developed information system, for water related data · Management of water resources for diverse uses in a participation approach 6.1.1 Water Resources Development Directorate (WRDD) The Directorate of Water Resources Development is responsible for planning, execution, operation and maintenance of Minor Irrigation Projects in the state. For some time past completed schemes are handed over to the Panchayat for operation and maintenance. Page 97 Social Assessment of WBADMI Project Final Report WAPCOS Limited 93 6.1.2 State Water Investigation Directorate (SWID) The State Water Investigation Directorate is responsible for assessment and monitoring of quantity and quality of both surface and ground water in the state and regulates the sinking of tube wells aided by Ground Water Act in the State. 6.1.3 West Bengal State Minor Irrigation Corporation Ltd. (WBSMIC Ltd.) The West Bengal State Minor Irrigation Corporation operates and maintains its own Minor Irrigation schemes. 6.1.4 West Bengal Agro-Industries Corporation Ltd. (WBAIC Ltd.) The West Bengal Agro Industries Corporation is looking after the needs of Agricultural and Minor Irrigation implements. The organizational setup of the Department of Water Resources Investigation and Development is furnished in Fig 6.1 . Fig 6.1 Water Resources Investigation and Development Department Organization Setup Chief Engineer Addl. Chief Engineer Superintending Engineer Executive Engineer Hd. Qtr. Level Superintending Engineer Circle Level (Comprising District) Operators Sub- Divn. Comprising Block/ Blocks Level Scheme Level Division Level / District Executive Engineer Assistant Engineer Secretary Engin eer - in - Chief & Ex - Officio Directorat e & Corporatio n Level W. B. Agro. Industries Corpn. Ltd. (WBAIC Water Resources Development Directorate State Water Investigati on W. B. State Minor Irrigation Corpn. Ltd. Page 98 Social Assessment of WBADMI Project Final Report WAPCOS Limited 94 6.2 ROLE OF PANCHAYATI RAJ INSTITUTIONS (PRIs) The Panchyati Raj Institutions in the state has created an example in the country. The state has created a history in the participation of the common people through the process of decentralization. A three tier Panchayat organization is working successfully for more than three decades. There is one Zilla Parishad for each district, one Panchayat Samiti for each Block and one Gram Panchayat for a group of villages. Moreover, Gram Sansad is working in each village. It is the only state in the country to have had regular elections to local bodies for the past thirty years. Elected representatives are the decision makers in respect of development and planning in their respective jurisdiction. The wide range of duties and responsibilities of Panchayats cover local natural Resource Management, Education and Health programmes, including Relief Work and the management of Rural Employment programme. The planning of district site specific schemes of the line departments at district and block level are taken up by Panchayats as a part of decentralized planning introduced by the state Government. The role of Panchayats in Minor Irrigation development are primarily limited to choice between various schemes sponsored by the line departments, site selection, selection of beneficiaries for different schemes and formation of Beneficiary Committee. The composition of various tiers of decentralized Government and scheme selection process are furnished in Fig. 6.2, 6.3 . Fig. 6.2 Panchyati Raj Institutional Setup : Minor Irrigation Zilla Parishad Sabhadhipati Panchayat Samiti Sabhapati Gram Panchayat Pradhan Gram Samsad Beneficiary Committee Page 99 Social Assessment of WBADMI Project Final Report WAPCOS Limited 95 Fig 6.3 Village / Scheme Selection Process The role of Panchayats in different Phases of installation of MI Schemes are noted below: · Preplanning Phase The Gram Panchyat, the lower most tier of PRI is to collect proposal of minor irrigation schemes from the community level. The Panchayats are to monitor the progress of selection of schemes by coordinating community levels and WRDD. On receipt of the technical feasibility report from WRDD, scheme selections are to be finalized at Zilla Parishad level by its Krishi – Sech – O – Samabay Sthayee Samiti . · Planning Phase The Panchayats at different tiers are to actively cooperate in the formation of Beneficiary Committees / BCs at scheme levels. During the Land transfer process for installation of MI Schemes, Panchayats are to extend help for smooth and litigation free registration of land by the donors in favour of the Department. Disputes, if any, are to be settled taking the Beneficiary Committees / BCs and the donors in confidence. · Implementation Phase At every stages of implementation of the schemes, the help and cooperation of Panchayats are very important. It plays active role in this part. Monitoring the Zilla Parishad Sabhadhipati Executive Engineer WRI & DD Panchayat Samity Sabhapati Assistant Engineer WRI & DD Gram Panchayat Pradhan Village / Community Page 100 Social Assessment of WBADMI Project Final Report WAPCOS Limited 96 progress of works and settlement of local issues, if any, are also to be regularly taken care of. · Consolidation Phase Completed schemes are handed over to the local Panchyat Body by the WRDD which in turn arranges to hand over the same to the Beneficiary Committees for operation and maintenance. In the event of major trouble the related Panchyat body takes up the matter to the Engineers of WRDD for repair. The Panchayats ensure smooth handing over. In case of disputes, the Panchayats arrange to settle the same. Role and Responsibilities of different tiers of Panchayati Raj Institutions (PRI) In respect of Minor Irrigation Development Sl. No. PRI Tiers Role and Responsibilities Remarks 1. Uppermost Tier Zilla Parishad (District Level) · Sabhadhipati · Karmadhakshya, Krishi, Sech O Samabay Sthayee Samiti Scheme selection and finalisation of site selection 2. Middle Tier Panchayat Samiti (Block Level) · Sabhapati · Karmadhakshya, Krishi, Sech O Samabay Sthayee Samiti · Block Development Officer and Ex-Officio Executive Officer (B.D.O.) Scheme selection and priority list for site selection and forwarding to Zilla Parishad and to keep constant touch with Gram Panchayat. Administrative control of operators at scheme level. 3. Lowermost Tier Gram Panchayat (Group of Villages) · Pradhan Collection of proposals for new schemes, preparation of priority list and forwarding to Panchayat Samiti, selection of sites, intimation of status of their proposal to the villagers, operation and maintenance of schemes, regular monitoring of running of schemes in association with beneficiary committee. Moreover, extending co- operation to the field Engineers of WRDD in respect of Minor Irrigation. Page 101 Social Assessment of WBADMI Project Final Report WAPCOS Limited 97 4. Water Users Association (Beneficiary Committee) (Scheme Level) · Chairperson · Secretary · Treasurer Presiding over meetings Overall management, operation and maintenance of schemes and submission of performance report to the Pradhan and WRDD. Financial management of the scheme. 6.3 ROLE OF THE COMMUNITIES Communities play important role in different phases of MI Scheme installation which are presented below: · Preplanning Phase Different groups of Communities in the village have the role to highlight the positive and negative impacts on the issues involved in the project to different visiting Assessment teams. They should also come forward with the free mind on the site selections of different schemes and also on the issue of donation of Land required for the schemes. They should submit proposals for schemes in their areas to the Pradhan, Gram Panchayat and should take part in the process of preliminary selection of schemes at Gram Panchayat level. · Planning Phase The community participation in the process of land donation for the scheme is important. They should see that the land donor is not deprived of its legitimate benefits from the schemes. The Beneficiary Committee (BC) has to arrange litigation free voluntary land donation required for the schemes. In the formation of BC, representation of all communities in it from the village is required. The various groups of communities in the village are to associate themselves during the process of formation of BC. · Implementation Phase Water Users Association is to associate it in every stages of implementation of schemes in their areas. They should keep close and regular contact with the WRDD and Panchayats. The quality of work is the key for an efficient scheme. The BC has to play a positive role to ensure quality work as per schedule and specification of the work. A completion certificate for the work is to be issued by the BC. Page 102 Social Assessment of WBADMI Project Final Report WAPCOS Limited 98 · Consolidation Phase The BC is to sign the agreement with the local Panchyat body in respect of handover of completed schemes to them and the operation, maintenance and management of the handed over schemes. They should actively participate in the capacity building training for them when arranged. They are to manage the schemes taking all sections of the communities in confidence. 6.4 ROLE OF OTHER DEPARTMENTS FOR MINOR IRRIGATION DEVELOPMENT 6.4.1 Agriculture Department Major departmental polices are noted below · Raising agricultural production and productivity vertically through wider adoption of appropriate eco-system-specific and cost effective technology, since land is a finite resource. · Bringing more area under high yielding variety (HYV), hybrid and improved varieties of crops. · Increasing fertilizer use and fertilizer-water use efficiency. Application of fertilizer on soil test results, use of balanced dose of fertilizer etc. consumption of fertilizer NPK to be raised from 134 kg per ha to 235 kg per ha with an improvement of most favorable consumption ratio from 3:21:13:1 to 2:1:1 in the terminal year of 10 th plan. · Increasing the cropping intensity through appropriate diversion or replacement of a) Existing crop / varieties: Profitable crop sequences. b) Introduction of new crops and cropping sequences. c) Increasing irrigation facilities. · Emphasizing maintenance of soil health, more use of Bio-fertilizers, green manure and farm yard manure, balanced nutrition, consumptive use of irrigation water and conservation of surface water through Participatory Irrigation Management (PIM), Need-based use of plant protection chemicals on Integrated Pest Management (IPM) concept and popularization of Bio-pesticides and Botanical pesticides. · Extending soil testing facilities up to district level for proper use of fertilizer. Page 103 Social Assessment of WBADMI Project Final Report WAPCOS Limited 99 · To strengthen and activate Agricultural Extension Service including Training and visit system to intensify linkage between research and extension workers. · Exploitation of surface water potential and to reduce indiscriminate use of ground water, as far as practicable. · Crop diversification. · Bringing cultivable waste land and fallow land under cultivation. 6.4.2 Fisheries Department Major departmental polices are noted below · To bring all water bodies for fish culture by the fishermen and unemployed youth. · Protection of wetlands from filling and conservation of aquatic animals. · Eco-friendly sustainable fish culture. · Promotion of organic aquaculture. · Women employment. 6.4.3 Activities of the Backward Classes Welfare Department, West Bengal The Backward Classes Welfare Department works for social, economic and cultural development of the people belonging to SC, ST and OBC in the State. The main functions of the Department are: · Promotion and implementation of educational schemes including training for enhancement of capabilities in them · Issuance of caste certificates and enforcement of reservation rules in services, posts and educational institutions · Implementation of schemes including income generation schemes for economic upliftment · Strengthening of infrastructure and creation of community assets for integrated development of the backward classes · Social and cultural development of the backward classes 6.4.4 Activities of West Bengal State Electricity Distribution Company Ltd. West Bengal State Electricity Distribution Company Ltd. has come into effect from 01.04.2007 after restructuring of erstwhile West Bengal State Electricity Board in compliance of Electricity Act 2003. WBSEDCL is a major power utility of the state with consumer strength over 74 lakhs. 5 zones, 17 circles, 52 distribution divisions and 478 electric supply offices make up the backbone to the power distribution system of the state. Page 104 Social Assessment of WBADMI Project Final Report WAPCOS Limited 100 6.5 ISSUES OF WATER RESOURCES DEVELOPMENT DIRECTORATE (WRDD) AND PANCHYATI RAJ INSTITUTION Normally, the field engineers of WRDD get full co-operation from PRIs in respect of planning, selection, execution, maintenance and handing over of MI Schemes. However, following issues are identified in which process of development of MI Schemes are some times affected. · Proposal for schemes are not routed through proper channel for PRI setup. · Beneficiary Committee is not formed or the existing committee is non- functioning. · Lack of awareness generation to protect departmental equipments like pump motor, power line etc. · Lack of capacity building. · Irregular / non payment of electricity bill. 6.6 WEST BENGAL ACCELERATED DEVELOPMENT OF MINOR IRRIGATION PROJECT (WBADMIP) The department has taken up a project to accelerate the Minor Irrigation Development in the state (WBADMIP). For implementation of the project, State level and District level Project Monitoring Units would be set up as presented in Fig 6.7 & Fig 6.8. The WBADMIP will provide · Minor Irrigation Schemes of different types in all the districts of the state. · Strengthening community based Irrigation Management · Support to Agricultural Development through provisions of ™ Agricultural Services ™ Diversification ™ New Technologies ™ Market Access ™ Income Generating Opportunities The WBADMI Project may be divided into 5 (five) phases, viz. (i) Identification Phase, (ii) Preplanning Phase, (iii) Planning Phase, (iv) Implementation Phase and (v) Consolidation Phase. Authorities at different levels have positive role to play for successful completion of the project within stipulated period. · Identification Phase Page 105 Social Assessment of WBADMI Project Final Report WAPCOS Limited 101 Long list of schemes Block and District wise is to be completed by moblising its Directorates. · Preplanning Phase The Department on the basis of the preliminary assessment on Hydrology, Environment and Social is to decide for preparation of Detailed Project Report (DPR). The Project Directorate of WBADMIP is to complete the Scheme Selection on the basis of Technical Feasibility Report and subsequent clearance from the Zilla Parishad. · Planning Phase In this phase, the department is to take up completion of Hydrological, Environmental and Social Assessments and also Tribal Development Plan and Engineering Design and Cost Estimates. The DPR is to be finalized at this stage. · Implementation Phase The Department has important roles to play towards contracts finalizations for procurement of materials, start of construction work providing adequate manpower for supervision of procurement of materials and construction work at field level. · Consolidation Phase The Department has to monitor the formation of BC at scheme levels and network of BCs. The training of BCs on operation and maintenance (O&M) including financial management is to be arranged by the department. The Memorandum of Understanding (MoU) is to be completed and signed by the BC and WRDD. This is to be monitored by the department. Sub-project evaluation and its completion report are to be arranged and finalized through the Project Directorate and WRDD. Handing over process of the completed schemes to the BCs are to be completed as per the guideline of the Government. Page 106 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t W A P C O S L i m i t e d 1 0 2 S P M U G O V T . C O R E T E A M D E D I C A T E D · P R J . D I R - 1 # - D W R I D · S E ( A M ) – 1 # , S E ( A I ) - 1 # - D W R I D · E E ( A M ) – 1 # , E E ( A I ) - 1 # ( D D O ) - D W R I D · A E ( A M ) - 1 # , A E ( A I ) - 1 # - D W R I D · S r . D A O - 1 # , - A G W B G O V T . S U P P O R T S T A F F · S E C Y . T O P R J . D I R – D W R I D · S r . A / C C L E R K – 1 # - A G W B A D D L . C A P A C I T Y · N U : A G R I – T L _ 1 # - D o A · N U : H O R T I – T L _ 1 # - D o H · N U : F I S H E R I E S – T L _ 1 # - D o F C O N T R A C T U A L F i g . 6 . 7 S t a t e L e v e l P r o j e c t M o n i t o r i n g U n i t D P M U F I D U C I A R Y U N I T · P R O C . S P L . - 1 # · S A E - 1 # F I N . M N G T U N I T · F M S P L . – 1 # S A F E G U A R D U N I T · E N V . S P L . - 1 # · S O C . S c . - 1 # A G R I U N I T · A G R I . E X P E R T - 1 # · F I S H E R I E S C 0 - O R D - 1 # I D U N I T · I D C O - O R D - 1 # · N G O C O - O R D - 1 # M L E U N I T · M & E C O - O R D - 1 # · M I S M A N A G E R - 1 # G E N . M N G T . U N I T · A D M N . O F F - 1 # C O N T R A C T U A L S U P P O R T S T A F F · O F F . A S S T T . - 2 # · D A T A E N T R Y O P E R A T O R - 3 # · O F F . A T T E N D A N T - 2 # + 1 # = 3 Page 107 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t W A P C O S L i m i t e d 1 0 3 G O V T . C O R E T E A M D A D I C A T E D · A E O , Z P , D P D - 1 # · A E ( A M ) - 1 # - D W R I D · A E ( A I ) - 1 # - D W R I D A D D L . C A P A C I T Y · P A O - D o A · D I S T H O R T I O F F - D o H · D I S T . F I S H O F F - D o F · E E - 1 , - 1 # , W R D D ( D D O , D P M U & V A I N P U T S ) · E E - I I , - 1 # , W R D D C O N T R A C T U A L S T A F F · C O N S U L T A N T C O O R D I N A T O R - 1 # P R O C · P R O C . O F F - 1 # A G R I . C E L L · A G R I L . S P L - 1 # · F I S H E R I E S . S P L . - 1 # I D C E L L · I D S P L - 1 # M L E C E L L · P R J . O F F . ( M & E ) - 1 # · P R J . O F F ( M I S ) - 1 # C O N T R U C T U A L S U P P O R T S T A F F · O F F . A S S T T . - 1 # · D A T A E N T R Y O P E R A T O R - 3 # · O F F . A T T E N D A N T - 2 # F i g . 6 . 8 D i s t r i c t L e v e l P r o j e c t M o n i t o r i n g U n i t Page 108 Social Assessment of WBADMI Project Final Report WAPCOS Limited 104 6.7 IMPACT ASSESSMENT In general, the Minor Irrigation Schemes do not possess any direct social risks associated with its installation, operation and maintenance. However, process related risks often impact the project achievements. The key social issues observed during stakeholder consultations at various level are presented in Table 6.1 . Table 6.1: Key Social Issues – Minor Irrigation Schemes Sl. No. Issue Positive Impact Negative Impact 1. Installation of MI Scheme · Assured availability of irrigation water for increased agricultural production resulting better livelihood and more employment generation i.e. appropriate selection of the communities and location. · Else full coverage of the expected command by irrigation shall not be possible. · Social exclusion of vulnerable groups in selection process not observed. · Due attention to weaker sections and vulnerable groups are required. · Proposals are initiated through PRIs and on technical feasibility report, final selection is also done by PRI. · Due to lack of awareness and or influence, weaker sections and vulnerable groups often do not get the benefit. 2. Site Selection · Location of scheme is an important factor with respect to access to benefit among vulnerable groups. No obvious exclusion observed. · Relatively less number of vulnerable groups were found to get benefit. 3. Land · Land requirement for installation of a scheme is low and is managed by the beneficiaries locally. Land owner is compensated by the beneficiaries for which the owner donates the land. · In most cases small and marginal farmers donate land since more than 90% belong to this category. The compensation is mostly not comparable with prevalent price. 4. Installation and Construction · WRDD procures pipes, pump-sets and accessories centrally and undertakes construction through selected agencies. Supervision is done by the WRDD with the assistance of members of beneficiary committee and representatives of PRI. · Ill motives sometime vitiate the process of construction in the field. 5. Operation and Maintenance · Completed schemes are handed over to the PRI who in turn bestows the operation and maintenance to the beneficiary committee (BC). · Beneficiary committee lacks knowledge in efficient management both in respect of technical and financial. Page 109 Social Assessment of WBADMI Project Final Report WAPCOS Limited 105 Sl. No. Issue Positive Impact Negative Impact · The BC engaged one to four persons for day to day operation of the pump and release of water from spout points. The BC arranges for diesel, maintains accounts, collects water rates and makes payment to the staff. Excess over expenditures are kept for maintenance. · In many cases particularly in shallow tubewells and Mini RLI schemes, respective beneficiaries arrange their fuel and operate the pump set. Spurious fuel and multi handling aided by lack of technical knowledge render the loss of efficiency of pump set. · In Departmental run schemes operator and assistant operators are posted for the purpose. Beneficiaries pay advance water rates in the Block Development Office. Verifying the original receipt, the operator releases water and keep records in prescribed format. · In departmental run schemes, two or three persons are also locally engaged by the beneficiaries who actually manage the filed matters and they are compensated in kind or cash every season by the concerned beneficiaries in ddition to payment of · The BC is not generally registered and does not get institutional benefits. · Some time controlled by influential person of the locality. · Irregularity in conducting meeting. 6. Beneficiary Committee (BC) · The BC is formed as per guideline of the WRI&DD. There is representation from MLA, PRI and WRDD. One member from each spout command is selected by the respective beneficiaries. Meetings are held regularly. Issues are settled in it. · Maintenance of record is not transparent. · Sometime BC is reluctant in making the bill payment and the power line gets disconnected. 7. Payment of electric charges · In electricity operated schemes, service connection is provided in the name of the Pradhan of the concerned G.P. Bills are raised in his name. The Pradhan arranges payment through the BC. · In some cases, BC is willing to pay the bill but fails to collect the requisite amount for advance payment of electric charges from the beneficiaries. The small and marginal farmers generally willing to pay after sale of their produce. Page 110 Social Assessment of WBADMI Project Final Report WAPCOS Limited 106 Sl. No. Issue Positive Impact Negative Impact · Once the power line is disconnected, it takes considerable period for its restoration. 8. Major Break Down · In the event of major break down, the PRI reviews the performance of the scheme and takes suitable decision for restoration of the scheme. The WRDD extends technical help. · All such schemes do not get financial support from PRI or Government and remain defunct as the BC can not arrange for its repair. 9. Theft of Power Line - · Unless cost of replacement is deposited the power line is not restored. The scheme remains permanently defunct. 10. Theft of transformer - · The cost of new transformer is to be borne by the PRI. 11. Self Help Group · Self Help Group (SHG) members contribute small amount every month which is deposited in Bank. The accumulated amount is given to members as loan to meet their needs. Such SHGs are active in almost every village. · Very few of the SHGs are involved in Agricultural activities. 12. Source becoming dry - · Crops do not get irrigation in the middle of the season. This situation is faced in lean period. 13. Water quality monitoring · Regular water quality monitoring reflects the trend of social risk. · In almost all cases such monitoring is not observed. 6.8 INFERENCES FROM THE SOCIAL ASSESSMENT STUDY AND STAKEHOLDER CONSULTATION Key issues emerging from consultations as well as impact analysis are enumerated below : 6.8.1 From a Social Development Perspective · Land holdings are quite small and most of them are either marginal or small farmers. This renders them poor and vulnerable. MI Schemes can result in enhancing cropping intensity – more number of crops become possible- and thus could be the key for prosperity. · Selection of projects should be based on self selection and demand driven principles. All those desirous of having MI facilities should have an equal opportunity for participating in the project. Page 111 Social Assessment of WBADMI Project Final Report WAPCOS Limited 107 · Poor and vulnerable sections such as Scheduled Caste, Scheduled Tribes need to be provided a preferential treatment in terms of participation. · Selection of the schemes, locations, etc should be transparent, and based on certain key well laid out parameters so as to avoid Elite Capture and Exclusion. · Though communities have no formal role in planning and implementation, arrangements should be made for holding consultations with them through the scheme cycle. · Benefitting communities should have a significant say in deciding on the location of the facilities and on distribution. · Communities are willing to continue with the traditional practice of donating lands for the scheme. But, in turn, the land owners expect some gratuity, as has been the practice in the past. · Communities are concerned about the ‘quality’ and ‘transparency’. They expect that proper arrangements be made to ensure that quality standards are adhered to and that the entire processes be transparent. · Benefiting communities, in their own way, get mobilized into ‘Beneficiary Committee; for group action. No assistance is being given from the government departments. · Communities are eager to get trained in several activities related to MI management. · Agricultural and Allied Extension activities need further improvement. Agricultural intensification and / or diversification would require a lot of capacity support from external agencies. · MI Engineering department is not only under staffed but also lack expertise to reach and work with the communities. So, external capacity assistance from independent Support Organizations such as NGOs, consultant etc .are essential. 6.8.2 From an overall perspective: · Subprojects need be selected carefully particularly in blocks of very high ground water development status and in the blocks where ground water has been severely affected by arsenic & fluoride contamination · Water harvesting tanks, water-harvesting structures, dug wells having CCA less than 2 ha should better be taken up under the National Rural Employment Guarantee Scheme. · Wherever possible minor irrigation systems should be energised by electricity and for this a dialogue should be started with West Bengal State Electricity Distribution Company Ltd. · Subprojects relying on extraction of ground water in the coastal saline zone have to take guard against ingress of saline water into the aquifers. · In some of the districts prone to flooding and water logging and having a very low level of ground water development status , ground water abstraction through irrigation systems may ameliorate such conditions Page 112 Social Assessment of WBADMI Project Final Report WAPCOS Limited 108 · There should be close coordination between the Department of Agriculture and the Water Resources Investigation & Development Department to ensure sustainability of the Participatory Irrigation Management as well as to ensure Agricultural Development. · General lack of awareness on organic farming and the need for crop rotation and crop diversification · Deficient facilities for soil testing and appropriate advice on use of chemical fertilizers and insecticide/pesticides · The need for intensive campaigning for awareness development on IPM/INM is a prime requirement to avoid adverse environmental impacts · Need for avoidance of groundwater abstraction in areas severely affected by arsenic and fluoride contamination; in such areas more stress should be laid on surface water irrigation schemes · A inventory of old and defunct RLI/DTWs to decide on the possibility of rehabilitation at economic cost · More stress on energisation of minor irrigation systems with electricity and rationalizing tariff rate as they feel such rates are high · Undertaking of proper bank protection works in stretches of streams used for surface water abstraction · Careful Installation of RLIs in stretches of a stream/river bed after proper assessment of discharge to avoid reduced stream flow resulting in problems of siltation · Need for avoidance of ground water abstraction to prevent saline water intrusion in coastal areas · Need for more co-ordination amongst allied departments to optimize benefits flowing from the scheme. · Awareness development for water use efficiency in irrigation and more stress on cropping with less water consumptive crops In a later section, the study provides suggestions for addressing the issues. Page 113 Social Assessment of WBADMI Project Final Report 109 VII. STAKEHOLDER ANALYSIS 7.1 INTRODUCTION West Bengal is a pioneer in decentralization, and the Panchayati Raj movement, or decentralized local self government, in West Bengal is very active for more than 30 years. As a result, the Panchayats get involved in all developmental works in the rural areas, and this applies to a certain extent for minor irrigation development as well. However, most part of the Minor Irrigation facilities’ development (till construction and commissioning) rests with the Government itself. Till recently, even O&M used to rest with them. Of late, gradually, O&M is being devolved to the communities, Beneficiary Committees. These user organizations mainly restricts its activities to operation of pumps and distribution of water according to demand. However, these organizations are yet to play any meaningful role in management of resources, conflict resolution, collection and retention of water charges, and maintenance of books of accounts, etc. So far there is no formal legal backing to such activities. Other associated line agencies like agriculture, horticulture, marketing, tribal welfare, etc are expected to assist in agricultural intensification and/ or diversification. However, they are yet to play a significant role in extending assistance. Given this broader scenario, the study has felt a need to identify the stakeholders -- individuals/ agencies who can impact and/ or who can get impacted by the project- and effort made to map their expectations as well as issues thereof. Keeping in account the importance of stakeholder participation and involvement in the project, a detailed stakeholder consultation and analysis was carried out as one of the important components of the Social Assessment study undertaken by Govt. of West Bengal under ADMI Project with an aim to support the project in evolving an effective project implementation plan and strategy. Such consultations were carried out with various stakeholders at village, panchayat, block, district and state level. Role and responsibility chart of the key institutions – Government of West Bengal and Panchayat Raj Institutions are identified at the beginning. GOWB’s MI vehicle is the Department of Water Resources, Investigation and Development. This in turn has 4 directorates. Table 7.1: Role and Responsibility Chart – Minor Irrigation – Government of West Bengal Sl. No. Institution/ Agency Role and Responsibilities Remarks 1 Government – Secretary Policy, Budget, Financial Management, and state wide oversight 2 Ex-Officio Secretary (Engineer in Chief) Program / Project Management 3 Directorate -Water Resource Development -Water Investigation -Minor Irrigation Corporation -Agro Industries Corporation GOWB’s MI vehicle is the Department of Water Resources Investigation and Development. This in turn has 4 directorates 4 WRDD Chief Engineer Nodal Agency for Minor Irrigation – Planning, Execution, Constructed Schemes are handed over to Page 114 Social Assessment of WBADMI Project Final Report 110 Sl. No. Institution/ Agency Role and Responsibilities Remarks Superintendent Engineer Executive Engineer Assistant Engineer Operator / Mechanic Operation and Maintenance Panchayat 5 WID Director Additional Director --Engineer --Geologist --Chemist Assessment and monitoring of quantity and quality of ground and surface water. Regulate Groundwater development --Geo Physicist 6 Minor Irrigation Corporation Planning, Execution, Operation and Maintenance Constructed schemes are operated by themselves 7 Agro Industries Corporation Needs of Agricultural and Minor Irrigation Implements Panchayat Raj Institutions : The PRI system in the state comprises a three-tier structure consisting of 3351 Gram Panchayat (GP), 341 Panchayat Samiti (block), and 18 Zilla Parishad (district) institutions. Over the past decade the state government has moved incrementally to decentralize service delivery and governance responsibilities and resources to PRIs. Aggregate funding flows to these entities have increased significantly, some funding from state departments (e.g. Public Health) has been devolved to PRIs, and GPs now have the authority to directly employ limited numbers of workers in certain sectors. The overall process is guided by two key formal policy documents - the “Activity Map” and the “Devolution Roadmap” – both of which have received State Cabinet endorsement. The Government of West Bengal (GoWB), specifically the Panchayat and Rural Development Department (PRDD), is committed to expanding and deepening this process through providing PRIs with the resources, capacities and incentives to improve service delivery and governance. In particular, GoWB wishes to focus on GPs - which are legally empowered to deliver local infrastructure and services in sectors such as health, education, water, roads etc. - as critical delivery and governance units within the overall PRI system. Despite these best intentions, role of PRIs is restricted mostly for an initial identification of villages/ beneficiaries, assisting in securing lands, and formation of Beneficiary Committees for post construction maintenance. 7.2 IDENTIFICATION OF STAKE HOLDERS The project requires the initial identification of potential stake holders and clarifications of any role they might be willing to play in the Project. Lists of wide range of stake holders at various levels have been identified and are presented in Table 7.2 to 7.5 . The list was compiled using suggestions of departmental officers and other sources for enlisting 42 groups of Direct Stake holders and 30 groups of Indirect Stake holders at various levels. Page 115 Social Assessment of WBADMI Project Final Report 111 Table 7.2: Village / Gram Panchayat level stake holders Direct Stake holders Indirect Stake holders Village Level Land owning Cultivators (small, marginal, medium and big) and share croppers and absentee landlords Rice mill owners SHG involved in agriculture Traders-buyers, vegetable vendors, rice traders flower vendors, egg collectors, Agricultural waste traders (straw, jute stick etc.) Agricultural labourers, daily wage earners including women labourers Various community level institutions Cattle grazers, live stock owners Retailers (seeds, fertilizer and pesticide, agricultural implements etc.) Common villagers using the scheme as a source of drinking water, bathing, toilet, washing clothes, observing rituals (in reservoir type schemes) etc. Local informal credit institutions (money lenders, Mahajans) Contractors engaged in construction and Maintenance work etc. Traditional occupation groups (carpenters, black smith, mason, plumber and electricians etc.) Traditional occupation groups like Black smithies, repairing outlets, van-rickshaw pullers, vendors, Pump motor mechanics Poor villagers picking green vegetables, pulses etc. from the Agricultural field. Gram Panchayat members Govt. functionaries like operator, Amin, Agriculture worker, forest worker etc. NGO functionaries, SHG Villagers engaged in social forest culture, poor villager collecting dead branches of trees and leafs (particularly woman and female child) etc. Gram Panchayat Level Pradhan, members, ex-Pradhan and members, Secretary etc. of the Gram Panchayat (GP) Traders Govt. functionaries of various departments Retailers Formal and informal credit institutions etc. Page 116 Social Assessment of WBADMI Project Final Report 112 Table 7.3: Block / Sub-divisional Level stake holders Direct Stake holders Indirect Stake holders Block Level Block Development Officer Formal credit institutions ADO (Agricultural Development Officer) Traders Sub-Assistant Engineer (W.R.D. D) Retailers Veterinary Officer Transporters etc. Revenue Inspector Sabhapati and members of Panchayat Samities NGO functionaries etc. Sub-divisional Level Assistant Engineers (WRI&DD) Formal credit institutions Sub-divisional Agriculture Officers Retailers Other sub-divisional level Govt. Officers including Inspector of BCWD Sellers Media etc. Table 7.4: District Level stake holders Direct Stake holders Indirect Stake holders Superintending Engineer and Executive Engineers (WRI&DD) Formal credit institutions PAO (Principal Agriculture Officer) Retailers District Magistrate Traders Soil Conservation Officer Transporters District Fishery Officer District level officers of other Govt. Department Sabhadhipati, Karmadhyaksya, KSOSSS and members of the Zilla Parishad MLA / MP CMOH (Chief Medical Officer of Health) Media etc. District Veterinary Officer District Welfare Officer, BCWD NGO functionaries District Officers of Agro-Industries Corporation Divisional Engineers, WBSEDC Ltd. Divisional Engineers, WBSMIC Ltd. District land and land revenue officer Contractors and suppliers Page 117 Social Assessment of WBADMI Project Final Report 113 Table 7.5: State Level stake holders Direct Stake holders Indirect Stake holders Water Resources, Investigation and Development Department (WRI&DD) Traders West Bengal State Minor Irrigation Corporation Ltd. (WBSMIC Ltd.) Retailers West Bengal State Agro Industries Corporation Ltd. (WBSAIC Ltd.) Companies (seed, fertilizer, pesticides, pump- motor and its accessories, pipes valves etc.) Department of Agriculture, Agricultural Marketing, Fisheries, Horticulture, Animal Resources Development Programmes of other departments Department of Panchyat &Rural Development Media groups etc. Backward Classes Welfare Department West Bengal State Electricity Distribution Company Ltd Departments of Finance NGO functionaries. The Social Assessment Team has identified some 20 of the above as Key stake holders who can exert significant influence on the project’s outcomes. Village level key stakeholders include: (i) land owning cultivators; (ii) share croppers; (iii) absentee landlords; (iv) Gram Panchayat President (Pradhan) and other members; (v) Operators; and (vi) SHGs and other youth organizations. Block : (i) Panchayat Samiti President (Sabhapati) and members; (ii) Block Development Officer; (iii) Agricultural Development Officer; (iv) Executive/ Assistant Engineer, WRIⅅ and (vi) Contractors and suppliers. District : (i) Sabhadhipati, Zilla Parishad; (ii) Karmadhyaksya, Krishi – Sech – O – Samabay – Sthayee – Samiti (Standing Committee); (iii) Inspector of Backward Classes Welfare Directorate (BCWD); (iv) Project Officer cum District Welfare Officer of BCWD; (v) Executive Engineer, Superintend Engineer, WRI ⅅ (vi) Department of fisheries; (vii) contractors and suppliers; and (viii) West Bengal State Electricity Distribution Company Limited. State : (i) Secretary, WRIⅅ (ii) Engineer in Chief, WRIⅅ (iii) Project Director, ADMI; (iv) Department of Finance; (v) Department of Panchayat and Rural Development; (vi) Departments of Agriculture, Horticulture, Fisheries. 7.3 STAKE HOLDER CONSULTATION · Community level consultation Consultations with members of the different communities were conducted during visits to the sites. Inclusion of share croppers, Landless, women, prominent members of Page 118 Social Assessment of WBADMI Project Final Report 114 different communities were given priority. Detailed discussions were held with the village elders and knowledgeable persons about the different community groups to understand their issues particularly those associated with community life, social organization and relationship with natural resources. Discussions were also held with the village and sub-divisional level Govt. officials particularly from BCWD and WRI&DD relating to development of communities. Discussions were also held with the Panchayati Raj Institutions and officials of line departments on exploring the possibilities of dovetailing existing Govt. schemes in the area for the overall socio-economic development of different communities. Attempts were also made to assess the vulnerability of the different community groups particularly on their livelihoods and their dependence on minor irrigation schemes. Discussions also focused on the impacts of the proposed project and on the identification of measures required to enhance the participation of different communities in the project planning and implementation. All the stake holders are aware of Minor Irrigation activities in their areas and have already indicated interest in the development of Minor Irrigation. As the details of WBADMIP is not yet well known to them, group consultations were conducted for analysis of stakeholders requirements in different sample blocks covering all 18 districts. · Village level consultation Village level consultations were organized at 109 villages covering all the sample blocks in 18 districts of the state. All such consultations as organized are presented below in Table 7.6 mentioning stakeholders categories and the strength of participation against each category. Table 7.6: List of Stakeholder Categories and Strength of Participation against each Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (A) Coochbehar (13.02.2009 – 14.02.2009) 1 Dalua Dasgir Coochbehar-I Major RLI Department 25 4 1 5 13 7 5 20 2 Monjarampur Tufangunj-II PDW Farmers 10 4 1 5 3 2 - 5 3 Bosmansingh Haldibari STW Benificiary 18 4 1 5 6 7 4 13 4 Chilakhana / Tufangunj-I MDTW Benificiary 25 4 1 5 12 8 4 20 (B) Darjeeling (16.02.2009 & 26.04.2009) 5 Falash / Phansidewa Mini RLI Benificiary 25 4 1 5 15 5 2 20 6 Hatiram / Kharibari Mini RLI Benificiary 20 4 1 5 12 3 3 15 Page 119 Social Assessment of WBADMI Project Final Report 115 Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total 7 Alokjhari / Kharibari Sprinkle r Benificiary 22 4 1 5 8 9 2 17 8 Rajajhar / Naxalbari PDG Farmers 42 4 1 5 22 15 20 37 9 Bandargach Phansidewa RLI Department 59 8 1 9 32 18 16 50 10 Sukna / Matigara WDS Farmers 10 3 1 4 4 2 - 6 (C ) Jalpaiguri (15.02.2009 – 16.02.2009 & 25.04.2010) 11 Niranjanpur at Dhupguri Mini RLI Beneficiary 47 8 1 9 11 27 5 38 12 Kodal Kathi / Malbajar STW SFMI Beneficiary 58 8 1 9 23 26 11 49 13 Dholabari / Malbajar STW Beneficiary 28 4 1 5 11 12 4 23 14 Debijhora Dhupguri SFMI Beneficiary 37 4 2 6 9 22 7 31 15 Dakshin Bhuskadanga Maynaguri Mini RLI Beneficiary 32 8 2 10 7 15 4 22 16 Lalitabari / Rajgunj MDTW (Propos ed) 41 8 2 10 4 27 9 31 17 Uttarmajgram / Mal STW Beneficiary 26 8 2 10 16 - 2 16 18 Uttardangapar a STW (Propos ed) 31 8 1 9 5 17 3 22 19 Kalabari / Nagrakata Mini RLI Farmers 14 4 1 5 4 5 - 9 20 Mujnai Madarihat WDS Beneficiary 13 4 1 5 6 2 - 8 21 Chaparerpar Alipurduar-II STW Beneficiary 21 4 1 5 10 6 8 16 22 Deomali / Falakata STW Beneficiary 22 4 1 5 12 5 4 17 (D) Uttar Dinajpur (11.02.2009 – 12.02.2009) 23 Aliganj Islampur STW Beneficiary 13 3 1 4 6 3 2 9 24 Haria Karandighi INWB Farmers 22 3 1 4 18 - 8 18 25 Jatapur Hemtabad WHT Farmers 10 3 1 4 5 1 2 6 26 Jamalpur Itahar Major RLI Department 25 3 1 4 15 6 4 21 27 Fulatti / Kaliaganj HDTW Department 23 4 1 5 13 5 3 18 Page 120 Social Assessment of WBADMI Project Final Report 116 Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total (E) Dakshin Dinajpur (10.02.2009 – 11.02.2009) 28 Gouripara / Banshihari STW Beneficiary 19 4 1 5 10 4 3 14 29 Jamalpur / Tapan WHT Farmers 13 4 1 5 6 2 3 8 30 Paranpur / Balurghat Major RLI Department 28 4 1 5 17 6 4 23 31 Katapur / Gangarampur Waterb ody Farmers 24 4 1 5 16 3 2 19 (F) Malda (08.02.2009 – 09.02.2009) 32 Kahartta Harischandrap ur -I STW Beneficiary 13 3 1 4 6 3 2 9 33 Gobindopur / Ratua-II Major RLI Department 21 3 1 4 12 5 3 17 34 Baliadanga Kalichak-I STW Beneficiary 14 3 1 4 7 3 2 10 35 Mandirpur / Old Malda HDTW Department 31 4 1 5 17 9 4 26 36 Musadanga / Gajol HDTW Department 33 4 1 5 21 7 6 28 37 Atgama Gajol SFMI Farmers 15 4 1 5 7 3 - 10 38 Bamangola Bamangola SFMI Farmers 11 4 1 5 5 1 - 6 (G) Murshidabad (08.02.2009 to 10.02.2009) 39 Basumati-I / Lalgola RLI Department 26 4 1 5 15 6 7 21 40 Bhabta / Beldanga-I RLI & DTW Department 37 6 1 7 22 8 5 30 41 Ratanpur / Beldanga-I RLI Department 38 4 1 5 17 16 5 33 42 Dighirpar Raninagar-I RLI Department 33 4 1 5 20 8 6 28 43 Dasturhat / Sagardighi Major RLI Department 38 4 1 5 27 6 4 33 (H) Nadia (28.01.2009 & 29.01.2009) 44 Bhomrapara Haringhata Major RLI Department 29 4 1 5 19 5 3 24 45 Uttar Bahirgachi Nakashipara HDTW Department 33 4 1 5 26 2 4 28 46 Dahakula / Karimpur-I Major RLI Department 62 4 2 6 47 9 13 56 Page 121 Social Assessment of WBADMI Project Final Report 117 Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total (I) 24 Parganas (N) (19.02.2009 & 20.02.2009) 47 Deara / Bagda Mini RLI Beneficiary Committee 47 3 1 4 36 7 9 43 48 Mamudpur Barrackpur-I DTW Beneficiary Committee 64 4 1 5 48 11 3 59 49 Aira / Habra-I HDTW Beneficiary Committee 62 4 1 5 42 15 12 57 50 Debitala / Minakhan Lift Scheme Beneficiary Committee 47 3 1 4 20 23 3 43 51 Patkulpota Sandeshkhali- II Lift Scheme Beneficiary Committee 47 3 1 4 15 28 6 43 (J) 24 Parganas (S) (07.01.2009 & 08.01.2009) 52 Kerolberia Bhangar-II Major RLI Department 50 4 1 5 37 8 10 45 53 Atghara / Baruipur MDTW Department 31 4 1 5 20 6 3 26 54 Godabar / Kultali WHT Farmers 13 4 1 5 4 4 - 8 (K) Howrah (31.12.2008) 55 Ghsopur / Amta-I Major RLI Beneficiary Committee 45 4 1 5 28 12 6 40 (L) Hooghly (27.11.2008, 16.12.2009) 56 Mashat- Ghoshpara Chanditala-I WHT Farmers (no committee) 20 3 1 4 12 4 4 16 57 Debanandapur Chinsura- Mogra DTW Department 40 3 1 4 30 6 6 36 58 Multi / Pandua LDTW DTW Department 38 3 1 4 12 22 4 34 59 Tarajit Kotulpur Khanakul-II RLI Beneficiary Committee 30 3 1 4 22 4 8 26 60 Damodarpur / Goghat-II RLI Beneficiary Committee 44 3 1 4 32 8 11 40 61 Basna / Balagarh INWB Beneficiary Committee 31 4 1 5 20 6 4 26 62 Hansgora / Chinsura- Mogra Major RLI Department 39 8 2 10 22 7 6 29 63 Fatepur / Chinsura- Mogra DTW Department 43 8 2 10 25 8 4 33 (M) Burdwan (22.02.2009, 23.02.2009 & 25.03.2010) Page 122 Social Assessment of WBADMI Project Final Report 118 Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total 64 Bharpeta / Memari-I HDTW Beneficiary 48 3 1 4 28 16 12 44 65 Shankarpur / Memari-I LDTW & HDTW Beneficiary Beneficiary 43 3 1 4 32 7 11 39 66 Chaupira / Memari-I LDTW Farmer 20 3 1 4 4 12 5 16 67 Jot Chaitan / Memari-I LDTW Society 27 3 1 4 17 6 7 23 68 Teora / Ketugram-II Dugwel l Farmer 5 2 1 3 2 - - 2 69 Dhobani / Faridpur- Durgapur WHT Farmer 8 2 1 3 3 2 2 5 (N) Birbhum (11.01.2009, 12.01.2009 & 12.04.2010 – 13.04.2010) 70 Laldaha / Bolpur- Srinikatan Mini RLI Beneficiary Committee 41 4 1 5 11 25 8 36 71 Mahisadal / Bolpur- Srinikatan RLI & STW Department & Private 33 4 1 5 3 25 12 28 72 Darpasil / Bolpur- Sriniketan WDS & STW Beneficiary & Private 49 4 1 5 28 16 8 44 73 Dam Dama / Bolpur- Sriniketan Surface flow Scheme s Farmers 35 4 1 5 3 27 7 30 74 Amgachi Suri - I Un irrigated - 34 4 1 5 - 29 15 29 75 Gara / Dubrajpur LDTW Department 24 4 1 5 11 8 3 19 76 Kharui / Dubrajpur LDTW Department 20 4 1 5 9 6 2 15 77 Ramnagar / Ilambazar LDTW Department 20 4 1 5 12 3 6 15 78 Sarparajpur / Lavpur Mini RLI Benificiary Committee 30 4 1 5 20 5 4 25 79 Bhola / Nalhati - I Dug Well Govt. 7 3 1 4 2 1 - 3 80 Kutubpur / Rampmhat - I Major RLI Department 26 3 1 4 17 5 2 22 (O) Paschim Medinipur (03.02.2009 & 04. 02.2009) 81 Abdalipur, Debra HDTW Department 42 4 1 5 15 22 6 37 82 Paschim Dharasol Debra HDTW Department 42 4 1 5 12 25 8 37 Page 123 Social Assessment of WBADMI Project Final Report 119 Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total 83 Amrakuchi, Keshpur MDTW Department 32 4 1 5 11 16 3 27 84 Sonadiha, Keshpur MDTW Department 29 4 1 5 16 8 4 24 85 Kamalapur, Medinipur MDTW Department 30 4 1 5 8 17 8 25 86 Panchkuri, Medinipur MDTW Department 23 4 1 5 12 6 3 18 87 Velaijuri, Jhargram WHT Farmers 14 3 1 4 - 10 3 10 88 Nutandihi, Binpur - I WHT Farmers 18 3 1 4 2 12 5 14 89 Ghosalband, Garbeta - I INWB Farmers 17 3 1 4 6 7 4 13 (P) Purba Medinipur (02.02.2009 & 03.02.2009) 90 Aklabad, Egra - I DTW Department 43 4 1 5 30 8 3 38 91 Bara Kumarda Patashpur - II HDTW Department 33 4 1 5 22 6 5 28 92 Chak Bhabani Patashpur - II DTW Department 40 4 1 5 17 18 6 35 93 Gobardhanpur Patashpur - II LDTW Department 39 4 1 5 29 5 2 34 94 Lachubad, Patashpur - II HDTW Department 48 4 1 5 28 15 6 43 95 Sirkantha Kalagonda Tamluk - I Major RLI Department 36 4 1 5 22 9 4 31 96 Raghunandan pur Contai - III Major RLI Benificary 28 4 1 5 15 8 3 23 (Q) Bankura (25.02.2009 & 26.02.2009) 97 Bonkathi, Bishnupur Mini RLI Department 24 3 1 4 12 8 3 20 98 Hazrapukur Bishnupur MDTW Department 21 3 1 4 11 6 2 17 99 Parasia, Chhatna RLI Department 29 3 1 4 18 7 5 25 100 Radhamadhab pur Bishnupur DTW Department 19 3 1 4 12 3 2 15 101 Malpur, Bishnupur HDTW Department 20 3 1 4 11 5 3 16 102 Jantadumur Ranibandh Major RLI Department 28 3 1 4 16 8 5 24 103 Gorasole, Onda INWB Farmers 16 4 1 5 6 5 3 11 Page 124 Social Assessment of WBADMI Project Final Report 120 Officials Present Villagers Present Sl. Location Type of Scheme Operation & Maintenance Total no. of Participants Deptt PRI Total General SC / ST Women Total 104 Koleberia, Kotulpur WHT Farmers 9 4 1 5 2 2 - 4 (R) Purulia (24.02.2009 & 25.02.2009) 105 Nildi, Raghunathpur RLI Department 23 3 1 4 12 7 5 19 106 Solanchi Major RLI Department 23 3 1 4 14 5 2 19 107 Belguma, Purulia Dug Well Beneficiary 7 3 1 4 2 1 1 3 108 Jambad, Hura SFMI Farmers 19 4 1 5 6 8 4 14 109 Kushumtikri Bagmundi SFMI Farmers 17 4 1 5 5 7 3 12 · District level Consultation District level stakeholder consultations were held in all the 18 districts with the officials of WRI&DD, district level officials of other departments, the District Welfare Officials of Backward Classes Welfare Department and the members of Zilla Parishad. The most important objective of the consultation was to assess the community willingness towards the implementation of Minor Irrigation Schemes and its subsequent operation and maintenance. Consultations in the district were spread over the period from 27.11.2008 to 13.04.2010. Major issues of the discussions were: ? WBADMIP ? Status of Minor Irrigation in the district ? Scope of development of Minor Irrigation in the district ? Selection of sites for MI Schemes to benefit tribal groups ? Implementation of MI Schemes ? Handing over of MI Schemes to WUA for Operation and Management. Details of participation of different district level authorities in the discussions are presented in Table 7.7 . Page 125 Social Assessment of WBADMI Project Final Report 121 Table 7.7: District Level Stakeholders categories and strength of Participation Category of Officials Sl. No. District Date Total no. of Official Discussions Administra- tion PRI SWID Agri- culture BCWD WRDD 1 Darjeeling 16.02.2009 21 2 2 1 3 2 11 2 Jalpaiguri 15.02.2009 27 2 4 2 2 2 15 3 Coochbehar 14.02.2009 14 2 3 1 2 1 5 4 Uttar Dinajpur 12.02.2009 19 2 4 1 3 2 7 5 Dakshin Dinajpur 11.02.2009 9 1 2 - 1 1 4 6 Malda 09.02.2009 16 1 3 2 2 1 7 7 Murshidabad 10.02.2009 12 1 2 1 2 1 5 8 Nadia 28.01.2009 12 1 1 1 2 1 6 9 24-Parganas (North) 19.02.2009 9 1 2 1 1 1 3 10 24-Parganas (South) 07.01.2009 7 1 1 1 1 - 3 11 Howrah 31.12.2008 5 - 1 1 1 - 2 12 Hooghly 27.11.2008 17 1 3 1 3 1 8 13 Burdwan 22.02.2009, 25.03.2010 17 1 3 2 2 2 7 14 Bankura 25.02.2009 12 1 2 1 2 1 5 15 Purulia 24.02.2009 11 1 2 1 2 1 4 16 Birbhum 11.01.2009, 12.04.2010 9 1 2 - 1 2 3 17 Purba Medinipur 02.02.2009 10 1 2 1 2 - 4 18 Paschim Medinipur 04.02.2009 14 1 3 2 2 1 5 · Consultation in Tribal Districts 14 districts are included in the Tribal Sub-plan of West Bengal. During consultation at village and district levels, all those districts were covered. 7 villages having tribal concentration more than 40% in the districts of Birbhum and Burdwan were identified. Consultations were also held in those villages to assess the status of Scheduled Tribe communities and their concern about Minor Irrigation. Consultation in Scheduled Tribe Villages Major issues discussed in the consultations at 7 identified tribal villages were: ? Status of their livelihood ? Scope of Minor Irrigation development covering their lands. ? Participation in the operation and management of schemes. ? Land for installation of Minor Irrigation Schemes. Page 126 Social Assessment of WBADMI Project Final Report 122 The stakeholder categories and the strength of participation against each category are presented in Table 7.8 . Table 7.8: Stakeholder categories and the strength of participation Category of Participation Agril. Labour Sl. No. District Date Total no. of Participation PRI Cultivator Male Female Share cropper Other villagers WRDD A. District – Burdwan 1 Chaupira 25.03.2010 20 1 6 5 3 1 1 3 2 Bharpota Do 48 1 13 9 12 3 7 3 3 Jotchaitan Do 27 1 6 3 5 2 7 3 B. District – Birbhum 1 Mahisadal 12.04.2010 33 1 9 5 8 3 3 4 2 Darpasil Do 49 1 14 15 8 4 3 4 3 Dam Dama Do 35 1 8 9 6 3 4 4 4 Amgachi * 13.04.2010 34 1 10 6 10 1 2 4 * The village has no irrigation scheme. Agriculture is totally rainfed. District level consultation for Tribal Welfare Project Officer cum District Welfare Officers of Backward Classes Welfare Department in the districts of Burdwan and Birbhum were consulted respectively along with District Level Engineers of WRDD. Major issues for discussions were: ? Different ongoing welfare schemes for tribals. ? Scope of Minor Irrigation development in the tribal concentrated villages. ? Selection of Minor Irrigation schemes in the target villages. · State level Consultation Consultations were held at state level with senior level officers of different departments, corporations and Board from time to time spread over the period from August, 2008 to June, 2009. During the discussions various inputs related with the WBADMIP were conceived. The list of officials consulted includes: 16. Principal Secretary, Department of WRI&D 17. Engineer in Chief, WRI&DD 18. Chief Engineers, WRDD 19. Managing Director, WBSMIC Ltd. 20. Director, Agriculture 21. Officials of BCWD 22. Director, Agril. Marketing Page 127 Social Assessment of WBADMI Project Final Report 123 23. Director, Horticulture 24. Director (Distribution), West Bengal State Electricity Distribution Co. Ltd. 25. Professor to Calcutta University 26. Project Director, WBADMIP 27. Officials of Animal Resources Department 28. Officials of Fisheries Department 29. Officials of Sericulture Department 30. Director, State Water Invention Directorate (SWID) 31. Superintending Geologist, SWID Page 128 Social Assessment of WBADMI Project Final Report 124 VIII. LANDS FOR MINOR IRRIGATION FACILITIES 8.1 TYPES OF MINOR IRRIGATION SCHEMES There are 8 types of Minor Irrigation Schemes in the WBADMI Project. i) Medium Duty Tube well (MDTW) ii) Light Duty Tube well (LDTW) iii) Shallow Tube well (STW) iv) Pump Dug Well (PDW) v) Midi River Lift Irrigation (Midi-RLI) vi) Mini River Lift Irrigation (Mini RLI) vii) Surface Flow Minor Irrigation Schemes (SFMIS) viii) Water Detention Structures (WDS) Brief details of the sub-projects are noted below. i) Medium Duty Tube well (MDTW) Medium Duty Tube well (MDTW) with submersible pump set irrigating CCA 20 ha with discharge of 100 m 3 /hr. The tube well is housed in a pump house of size 4 m x 4 m approx. A tripod connected with 2 loops with 10 spout chambers constitutes the water distribution system. A transformer is installed near the pump house for supply from HT line. ii) Light Duty Tube well (LDTW) Light Duty Tube well (LDTW) with submersible pump set irrigation CCA 6 ha with discharge of 30 m 3 /hr. The tube well is within a pump house of size 2 m x 2 m approx. Water from the tube well is received in a small chamber outside the pump house from where field channel takes care of water distribution. A transformer is installed near the pump house for power supply. iii) Shallow Tube well (STW) It is a similar nature of scheme like LDTW but runs with centrifugal pump set electrically / diesel operated. iv) Pump Dug Well (PDW) Pump Dug Well (PDW) with centrifugal pump set irrigating CCA 5 ha with discharge around 30 m 3 /hr.. Normally, pump house is not constructed. Water is distributed through field channel. In most cases pumps are run with diesel. v) Midi River Lift Irrigation (Midi-RLI ) Water from rivers, canals, beels etc. is lifted by two centrifugal pump sets each capable of discharging 100 m3/hr. CCA is 40 ha. A quadruped with 3 loops with 15 spout chambers distributes water in the command. A transformer is installed near the pump house of size 4 m x 4 m approx. in electrical scheme. Pumps are also run by diesel vi) Mini River Lift Irrigation (Mini-RLI) It is similar to that of Mini RLI. CCA is 20 ha. Discharge of two pump sets at 30 m3/hr each.. A tripod with 2 loops with 8 spout chambers distributes water in the command. Pump house, transformer etc are similar. There are diesel run schemes also. Page 129 Social Assessment of WBADMI Project Final Report 125 vii) Water Detention Structures (WDS) Water Detention Structures (WDS) store water at the upstream side of a surface run-off. Check dam, Nala bundh etc are types of such structures. Water is distributed to the fields by gravity flow, siphon or even by pump sets. viii) Surface Flow Minor Irrigation Schemes (SFMIS) Surface Flow Minor Irrigation Schemes (SFMIS) diverts water to the fields from water bodies. A diversion structure is constructed at a suitable location near the water body. No pump set is required. CCA is 30 ha to 50 ha. In general farmers are inclined for conversion of diesel run schemes into electrical one due to steady rise of price of diesel. Culturable Command Area (CCA) and approximate nos of farmers involved in each sub project are presented in Table 8.1 Table 8.1: Area and Number of Farmers Sl. No. Technology/Scheme CCA (acres) No of Farmers (Approx) 1 MDTW 50 30 2 LDTW 15 9 3 STW 15 9 4 PDW 12 7 5 Midi RLI 100 60 6 Mini RLI 50 30 7 WDS 10-25 6-15 8 SFMIS 75- 125 45- 80 8.2 LAND REQUIREMENTS FOR MINOR IRRIGATION STRUCTURES Land requirement for individual Minor Irrigation Structures is quite less, maximum requirement in a sample scheme is up to 0.035 acres (3.5 decimal). In all, 256 acres of land are required in the project for installation of 14190 nos (4660 clusters) of schemes for creation of additional CCA of 138901 ha. Scheme wise requirement of land is given in Table 8.2 . For Surface Flow Minor Irrigation schemes and WDS, practically no land is required due to nature of the schemes. Such schemes are installed at the fringe of the water body and across the surface water runoff respectively. Table 8.2 : Scheme wise land requirement (acres) Sl. No. Name of Sub Project Land requirement Per Scheme Total no. of Structures in the project Total land (actual) (Acre) Total Lands (in practice)* (A cre) 1 MDTW 0.035 359 12.6 16.4 2 LDTW (Cluster of 6) 0.01 x 6 522 31.3 40.7 3 STW (Cluster of 6) 0.01 x 6 1309 78.5 102 4 Midi-RLI (E) 0.035 464 16.2 21 5 Midi-RLI (D) 0.035 113 4.0 5.2 6 Mini-RLI (E) 0.035 892 31.2 40.5 Page 130 Social Assessment of WBADMI Project Final Report 126 7 Mini-RLI (D) 0.035 525 18.3 23.8 8 SFMIS (30, 40, 50) nil 95+75+114 nil nil 9 WDS nil 117 nil nil 10 PDG (Cluster of 6) 0.01 x 6 75 4.5 5.9 Total 4660 196.6 255.5 *In practice, some provision will have to be made for access and other purposes, which works out to about 30% of the actual requirement. 8.3 AVAILABILITY OF LAND Minor irrigation schemes in the state are cultivator friendly. It does not require much of a land for accommodating its structures. Schematic layout plan for different sub-projects are given in Fig 8.1, Fig 8.2, Fig 8.3 and Fig 8.4 . Current price of 5 decimal of land ranges between rupees five thousand to thirty thousand depending on nature of soil and irrigation facilities etc. Cultivators arrange for voluntary donation of required piece of land for installation of a scheme since tradition. Almost in all cases land donor is partially compensated by the beneficiary committee with cash. Field officers of WRI & DD cannot recall any dispute over the donation of land for Minor Irrigation Schemes. In the above context, availability of land for schemes under the project is not a problem. The WUA could arrange for such requirements like the beneficiary committees and it would be regarded as a direct contribution towards the project implementation. a. Pump house 4 m x 4 m approx. b. Quadruped in Midi-RLI Tripod in MDTW and Mini RLI c. Transformer is electrically operated scheme Fig 8.1: Schematic Layout Plan of a MDTW / Midi – RLI / Mini – RLI a. Pump house 2 m x 2 m approx. b. Small Chamber c. Transformer Fig 8.2: Schematic Layout Plan of a LDTW / STW a b c a Land required: 3.5 decimal » b c a Land required: 1 decimal » 450 sft Page 131 Social Assessment of WBADMI Project Final Report 127 a. Pump house 2 m x 2 m approx. Fig 8.3: Schematic Layout Plan of a Sprinkler / Drip a. Dug Well – 1.5 metre dia Fig 8.4: Schematic Layout Plan of a PDG 8.4 SOCIAL SAFEGUARDS MANAGEMENT 8.4.1 Land Technologies / schemes can be classified into two broad categories: one, those drawing water from surface sources and two based on Ground Water. The former comprise: i) River Lift Schemes, ii) Water Detention Structures, iii) Surface Flow MIS iv) Sprinkler and v) Drip Irrigation Schemes The later comprise: Tube Wells (Medium / Light / Shallow) and Pump Dug Wells. The scheme typology is also indicative of the command area that it would serve. River lifts will have a command area of a maximum of 40 ha, whereas Tube Wells 20 ha. Of the 2395 SWS proposed, 80% of the schemes will have a CCA of a maximum of 20 ha. Likewise, 95% of the GW schemes will have a CCA of 6 ha. Thus, MI scenario is characterized typically by small scale systems and consequently small land requirements. The Social Assessment study indicates that the land requirement arises for three purposes: (i) Source Works – Head Works and Pump House (ii) Spout - Water outlets for regulating distribution; and (iii) Distribution System – Field channels for transmitting water to the fields. Distribution line are laid at least 1.2 m below ground elevation, no lands need to be ‘acquired’. A spout is a small regulatory chamber requiring at the most an area of 16 sq. ft. Farmers competes with each others to have a spout in their plot as it provides them an advantage in securing water. So, no lands need to be acquired for a spout as not only the requirement is too small but also that it is demanded highly by the farmers. This leaves with the Source Works. Though the extent of land required depends on the type and size of the scheme, at the maximum, it works out to about 1,500 sq. ft., viz, 0.035 Acre. And it is not Land required: 1 decimal » 450 sft a Page 132 Social Assessment of WBADMI Project Final Report 128 necessary that the project should acquire ‘the’ piece of land. Enough flexibility is available for the choice of a land. Given this situation, of lands required being quite small and that it is not necessary that a particular piece of land is required, traditionally, land for source works are secured on a voluntary basis, through donations. Thus, there is no need for involuntary land acquisition. In order to make this process of voluntary land donations transparent, the following rules shall be adopted: i) Voluntariness shall be ascertained by the WRI&D department and duly documented. Under any circumstances, the land user will not be subjected to any pressure, directly or indirectly, to part with the land. ii) The Department shall ensure that there shall be no significant adverse impacts on the livelihood of the household donating the land. Preferably, the voluntary donation should not be no more than 10 percent of the area of any holding by the land owner. The land donated should not be more than 1,500 sq. ft. iii) This should not result in any physical relocation. iv) The facilities requiring land should not be site specific. v) The land in question must be free of squatters, encroachers, share cropping or other claims or encumbrances. vi) The Department shall facilitate the prospective water users in arriving at extending ‘gratitude’ to the land donor in lieu of the ‘contribution’ s/he has made. The same shall be documented and monitored for compliance. vii) Land transfers will be complete, land title will be vested in the Government; and provision will be made for redressal of grievances (ROG) if any. 8.4.2 Processes and Instruments A. Voluntariness 1. Support Organization and Assistant Engineer of the Department shall conduct enquiries as deemed necessary, to understand the land user’s ‘interest’ / ‘motive’ behind the offer to donate land for the scheme. 2. Support Organization and Assistant Engineer shall also assess adverse impacts (if any) on the household of the donor as a result of parting with the land. 3. A certificate to this effect that they are satisfied of the ‘voluntariness’ and that if will have no impact on the livelihood will be prepared and signed by Support Organization and Assistant Engineer, with counter signature from the donor. 4. The Executive Engineer shall randomly cross check from time to time and satisfies himself of the results. 5. The Department shall develop methodology to conduct such enquiries and a template for the certificate. 6. It is desirable that the project enlists Support Organizations even for the pilot phase. In case, it is not feasible, then, Assistant Engineer alone will shoulder full responsibility with facilitation from GP. 7. Redressal of Grievances. The Executive Engineer shall address grievances, if any. If an amicable solution cannot be found at Executive Engineer level, the same shall be referred to the Superintending Engineer whose decision shall be final and binding. Page 133 Social Assessment of WBADMI Project Final Report 129 B. Community’s Gratitude Traditionally, the prospective water users do express their thanks to the donor with some gratuity. This may entail some cash, waving off of the water charges, location of spout, employment or lands etc. It is prudent for the project to play the role of a facilitator in making explicit the ‘gratitude’, document the same and make it obligatory on the part of community for its fulfillment. The following process shall be adopted. 1. Support Organization and Assistant Engineer shall convene a meeting of the community and facilitate in an extensive deliberations among themselves as well as with the donor. 2. Gratitude agreed upon by the benefiting community and the proceedings of the meeting thereof shall be documented. 3. Minutes of the proceedings shall be signed by the benefiting community members. 4. This Gratitude Note shall find a reference in and annexed to the MOU as and when it is signed. 5. Support Organization and Assistant Engineer shall review / monitor this on a regular basis. In an interim arrangement, in the absence of Support Organization, Assistant Engineer shall shoulder the responsibility and for the deliberations among: i) Self Initiated Community Organizer (SICO), the person who would have initiated the mass petition demanding the scheme. ii) GP President (Pradhan) or representative iii) 4 representatives of the community iv) Assistant Engineer. This gratitude note shall find a reference in and annexed to the MOU as and when it is signed. Page 134 Social Assessment of WBADMI Project Final Report 130 IX. ISSUES OF SIGNIFICANCE FOR THE PROJECT 9.1 ISSUES OF SIGNIFICANCE FOR THE PROJECT Issues of significance in the context of managing this project are as follows: (i) Inclusion and equity. The biggest challenge before the project is, how to include and equitably benefit the most marginalized sections of the populations (belonging to diverse socio-economic background e.g. ST, SC, women and other poor landless laborers. Should there be a question in ‘exclusion’, the project should be able to answer appropriately why some households/ sections did not get an opportunity to participate. (ii) Cohesion. Another challenge relates to, how one can ensure cohesiveness among various stakeholder groups and creates an enabling environment for project implementation. As observed, there are conflicts, elite capture and facilities being ‘privatized’. (iii) Participation. As of now, there is no provision for legitimate local level institutions. With the result arrangements are rather ad-hoc resulting in inefficient management. Project needs to provide a vehicle for enabling community participation. (iv) Transparency and accountability: The other important issue before the project is with regard to setting up of a transparent and accountable system as far as implementation of the project is concerned. (v) Decentralization. Another important issue that the project would like to address is with regard to establishment of a decentralized governance mechanisms in implementation of ADMI project. (vi) Land Acquisition. Lands are required for the project. Involuntary acquisition need not and cannot be resorted to. Traditional practice of land donations in turn for some gratuity by community needs to be formalized. (vii) Tribal development. West Bengal has significant tribal population – about 6% of the total population or about 4.5 million people are categorized as Scheduled Tribes (ST). There are total thirty eight (38) notified STs in the state. The districts having signfificant tribal population in the state are : (i) W Medinipur; (ii) Purulia; (iii) Dakshin Dinajpur; (iv) Malda; (iv) Jalpaiguri; (v) Birbhum; and (vi) Burdwan. They live predominantly in the rural areas and their social , cultural, economic, political, and historical characteristics induce not only vulnerability, but also often renders them ‘excluded’ from development interventions. Following on the Indian national constitutional provisions, West Bengal state has drawn measures to safeguard and advance the interest of tribals. Given this, and in accordance with the World Bank Policy on Indigenous Peoples, OP 4.10, a Tribal Development Plan needs to be prepared to enable them participate in the project. (viii) Livelihood Development. While irrigation facility is a pre-requisite, there are equally significant conditions, such as agriculture and allied activity supports, which need to be fulfilled to enable the project to enable economic development. Page 135 Social Assessment of WBADMI Project Final Report 131 (ix) Capacity Support and Capacity Building issues. Capacity of stakeholders to manage and execute programs at different levels (community, block, district and state level) of project operation is another important issue or challenge before the project. The capacity issues can be broadly categorized as capacity support issues, and capacity building issues. The former is chiefly aimed at mobilizing communities into local level institutions such as Water Users Associations, SHGs , Fishers and other Commodity Interest Groups, for group action and linke them with the external world as well. etc.. Capacity building comprise imparting training such as to developing knowledge, skills and management practices for performing a set of activities. These are highly critical for ensuring ownership and sustainability. (x) Gender. Women are one of the key constituents who have large stake but limited influence and their inclusion and participation is critical for the success of the project. (xi) Convergence . The departments directly associated with the project are WRI&DD, Fisheries, Agriculture, Revenue, Panchayati Raj and SC&ST Development departments. However during consultations with these departments, the study team could hardly find any inter-departmental convergence in terms of setting up of a common agenda and action plan; common execution strategy; joint monitoring and supervision, etc. for management of MI systems and improving MI based livelihoods. This is particularly the case in respect of inter face between MI and PRI who have to work closely to ensure the success. (xii) I nsurgency . The Naxalite - Maoist insurgency is an ongoing conflict between Maoist groups, known as Naxalites or Naxals, and the Central as well as State governments. The insurgency started as a peasant rebellion in the eastern Indian village of Naxalbari in 1967 and has currently spread to a large swath in the central and eastern parts of the country referred to as the " Red Corridor ". In 2006 the Indian Prime Minister called the Naxalites "The single biggest internal security challenge ever faced by our country. In 2009, he said the country was "losing the battle against Maoist rebels". Naxalites claim to be supported by the poorest rural populations, especially poor SCs and STs. They have frequently targeted tribals, police and government workers in what they say is a fight for improved land rights and more jobs for neglected agricultural labourers and the poor and follow a strategy of rural rebellion similar to that of the protracted People's War against the government. As of 2009, Naxalites are active across approximately 220 districts in twenty states of India accounting for about 40 percent of India's geographical area. They are especially concentrated in an area known as the " Red Corridor ", where they control 92,000 square kilometers . The Naxalites claim to operate in 182 districts in India, mainly in the states of Jharkhand , Bihar , Andhra Pradesh , Chhattisgarh , Madhya Pradesh , Maharashtra and West Bengal . [11] . In West Bengal areas west of Howrah are affected by the insurgency. Areas in West Bengal, specifically those of Jangalmahal and Lalgarh , are some of the worst affected by anti-state violence by Maoist groups who cite the accumulation of unaccounted for wealth in the hands of elites and specific failure of the State to counter problems they were elected to Page 136 Social Assessment of WBADMI Project Final Report 132 address such as social discrimination and poverty . A good number of districts are thus affected by insurgency in the state. The situation is highly dynamic as the nature and extent of impacts vary from time to time and at times could impede project implementation. Page 137 Social Assessment of WBADMI Project Final Report 133 X. DESIGN ELEMENTS TO APPROACH THE ISSUES 10.1 INCLUSION AND EQUITY SELECTION OF VILLAGES/ SCHEMES . Efforts will be made to ensure that the selection is premised on a bottom up approach and through the ladder of PRIs. Individual communities will make a requisition to GPs who, after due examination, will in turn pass it on to PS. After due block level vetting, the same will move up to ZP. A committee at the district level headed by a Chairman, ZP will finalize the list. One of the parameters for finalization will include the proportion of SC/ STs. This administrative list will be subject to technical and social feasibility by the WRI&DD. The feasibility exercise will also involve consultations with the communities on their willingness, or otherwise for participation, seeking their acceptance, ascertaining availability of ‘lands’, and willingness to shoulder responsibility for operation and maintenance. The feasibility report is then submitted to ZP again with / without any suggestions for change, which will be incorporated before the final selection is made. Feasibility report may suggest modifying (including/ excluding) household coverage to ensure appropriate ‘inclusion’. Such a report shall also be endorsed by the GP. WRI&DD will conduct consultations in the field with assistance from Support Organizations specially deployed for the purpose. 10.2 TRIBAL DEVELOPMENT To ensure ‘inclusion’ of Tribals, in accordance with the Bank’s policy, a separate Tribal Development Plan (TDP) has been prepared. Details of which are available in a separate report. 10.3 LANDS There will be no involuntary acquisition of lands. Traditional practice of securing lands through donations shall be adopted. Details have been already presented in a previous section. 10.4 COHESION This relates to nature and extent of understanding among individuals/ groups and has two broad dimensions. One, among the individuals in a group, viz., benefitting community; and two, between groups viz., between a benefitting group and others in the vicinity (upstream or downstream). While special capacity building initiatives have been planned to address intra-group cohesion, inter-group issues are rather ‘macro’ level and this will be managed as a part of the techno-social feasibility exercise done while selecting a village/ scheme. This is particularly the case in respect of water detention structures. Feasibility report will specifically address and report this as deemed appropriate and enable proper selection. 10.5 INSTITUTIONAL DEVELOPMENT Project will mobilize the benefitting communities into a Water User Association (WUA) and will be capacitated to serve as a local level village institution. A WUA is created by delineating the command area under a minor irrigation scheme. All land holders (farmers and tenants) within the delineated command area constitute the members of the WUA. The area of a WUA is subdivided in order to equitably handle water management, maintenance, and governance. These constitute the Territorial Constituencies (TC) within a WUA, In the Page 138 Social Assessment of WBADMI Project Final Report 134 Surface Flow Minor Irrigation schemes the sub-command area under the flow-outlet is the TC. In lift irrigation schemes Spout Command Area (SCA) is the sub-command area like TC. The existing Government Order will be modified such as to enable WUA to be associated with MI as a full partner (draft Act is ready and expected to be adopted soon). Elaborate provisions will be made for due consultations with the communities and their participation, during planning and construction. Government’s commitment to transfer the assets and O&M responsibility to WUAs will be formalized through a Memorandum of Understanding (MOU). The role and responsibilities of WUAs will be delineated in the MoU, which will be signed between them and the District Project Director (DPD) on behalf of District Management Unit (DMU). The WUAs will also have to be empowered to levy & collect all charges including water as WUA funds for OMM purposes. 10.6 WUA’s role will be emphasized clearly through a delineation of the activities through the project cycle/ phases -- (i) pre-planning & planning, (ii) implementation and (iii) consolidation: · Pre-planning and planning phases : These phases will include community organization and facilitating community in preparing the micro-plan that includes (i) net planning, (ii) water audit, (iii) crop plan and (iv) water distribution plan; · Implementation phase: This phase will also include community’s role in execution of micro level water management, i.e, construction of masonry channels or purchase of lay-flat hoses for plot to plot conveyance of water from Spouts or Water Outlets. This is based on the financial limit of works for tendering. Concurrent monitoring and supervision will also be done by WUAs; · Consolidation phase : This will emphasize on land holding of community based institutions and building their capacities to take over the OMM 10.7 ROLES AND RESPONSIBILITIES OF WUA Broadly, the following are the responsibilities to be shouldered by WUA. · Prepare a Scheme Development & Management Plan (SDMP) jointly with other key actors; · Supervise and actively participate the SDMP implementation. · Fix up water rates and collection of water charges from its members as per the rates decided by WUA; · Operate and maintain the system by fixing and collecting user charges. This will include: (i) arranging for diesel; (ii) repair and replacements; (iii) cleaning of field channels; (iv) oversee and ensure efficient distribution of water; (v) prepare agriculture/ fisheries plans: (vi) maintain book of accounts; and (vii) conflict resolution. 10.8 FOR WUA TO FULFILL THE ABOVE OBLIGATIONS, DEPARTMENT AND GPS ARE ALSO REQUIRED TO PERFORM A SET OF FUNCTIONS. THE DEPARTMENT SHALL BE RESPONSIBLE FOR THE FOLLOWING Page 139 Social Assessment of WBADMI Project Final Report 135 · Arrange for finances, resources, technical support \ supervision and training to WUA to carry out OMM of handed over MI Schemes; · Provide the above inputs to WUA to carry out all WUA functions and activities. · Ensure quality of civil, mechanical and electrical works carried out under the project; · Provide continued technical support, supervision and training to the WUA at least for 3 years subsequent to the handing over of the MI system to WUA. 10.9 ROLES & RESPONSIBILITIES OF PRADHAN OF GRAM PANCHAYAT (GP) After receiving the land/ irrigation schedule from the engineers GP will identify the water users in the command area; · GP will group the farmers according to the Spouts / Territorial Constituencies (TC); · He/she will convene a general meeting with the farmers of the command area and constitute the following irrigation committees by election - (i) Spout Sub-Committee (SSC); (ii) Beneficiary committee (BC) and (iii)Executive Committee (EC) of beneficiary committee 10.10 PARA-WORKERS (PW) To assist a WUA in performing its roles and responsibilities, each WUA will have a few para-workers linked to it. These para-workers will be educated persons from the WUA area identified by the respective WUAs and trained by the project to perform specific tasks. Normally, there will be 3 (three ) para-workers with each WUA –one for institutional development, one for agriculture development and livelihood promotion and one for water management. The para-workers will be paid a month honourium by the project through the WUA. The project will cover the full amount of the honourium of the para-workers for the first year and only a partial amount for the next year. The remaining amount will have to be borne by the WUA. From 3rd. year onwards, the para-workers will work on the basis of payment of service charge by the WUA or the member who utilize their services. 10.11 SUPPORT ORGANIZATIONS External non-government organizations specialized in community development shall be deployed to provide community mobilization support to WUA and PWs as well as build their capacity. TOR has been drafted for this purpose. Support Organizations would provide support at the village level for community mobilization, livelihood promotion; facilitation of linkage between community with various government departments, financial institutions and market; etc. 10.12 In order to establish an accountable and transparent mechanism, greater emphasis has been given to establish an MLE system that provides timely and necessary information for achieving the same. Therefore, from the very beginning the project would like to set clear deliverables for which process has been started to establish baseline status and set up output/process, outcome and impact indicators so that the progress against the same can be measured from time to time. This would help to not only set right the accountability Page 140 Social Assessment of WBADMI Project Final Report 136 mechanism but also provide platform for maintaining transparency within and outside the project with regard to achievement of necessary project outputs. Through establishment of an effective MLE system, the project would also like to assess utilization of funds vis- à-vis quality of activities undertaken under the project and set right the same if there are any deviances. Keeping in mind the importance of establishment of MLE system, the project therefore has placed the provision of MLE expert at state level and district level project operation. 10.13 CONVERGENCE Specific emphasis has been laid in this project to achieve inter departmental coordination so that an integrated development approach can be adopted under the project by effective channelization and dovetail of funds and resources for promotion of MI based livelihoods. ƒ Setting up of District Project Unit who in liaison with ZP and the district administration can actually take up initiatives to bring all the departments in one platform and dovetail / channelize resources for the benefit of common mass under the MI system. ƒ Formally enlisting the Agriculture Department support for agriculture development. ƒ Formally enlisting the support of fishery department in formation of Primary Fishery Cooperative Society and channelizing infrastructural and resource support from the department for profitable pisciculture activity under a MI system. ƒ Taking support of SC&ST development department for specifically benefiting these vulnerable groups by linking them under various programs implemented under the department ƒ Taking support of Panchayati Raj department for effective engagement of PRIs especially in terms of mobilizing community, developing community level micro-plans, identification of beneficiaries, monitoring and supervision, etc. ƒ Taking support of Agriculture departments for establishment of extension counters, crop diversification, foreshore cultivation, transfer of technical know-how to farmers, etc. ƒ Similar plans have been also developed to channelize support from Veterinary, Horticulture, Forest and Soil Conservation departments. 10.14 CAPACITY BUILDING AND CAPACITY SUPPORT For effective execution of project deliverables, the project has to take-up the following capacity building measures at the community level: ƒ Understanding to take up micro level planning ƒ Capacity to assess own problems and priorities ƒ Capacity to form water users’ institution ƒ Knowledge and skills to manage water users’ institution ƒ Technical skill to take-up MI operation and maintenance work ƒ Skills to mobilize community for generation of community contribution ƒ Knowledge and skills to take-up various MI based livelihood options ƒ Negotiation skills for resolving inter and intra stakeholder conflicts and personal differences ƒ Advocacy skills to demand for services Page 141 Social Assessment of WBADMI Project Final Report 137 10.15 RISKS Major risks and assumptions in the project. Project’s access to some of the insurgent areas may be quite difficult. This may impede the progress at times resulting in delays. Page 142 Social Assessment of WBADMI Project Final Report 138 XI. PILOT STUDY 11.1 PROJECT INCEPTION ACTIVITIES The activities of the project started with the focus group discussion with the WRDD officials. It was further accelerated with conduction of two focus group discussion at two different villages at Barasat I in presence of IBRAD’s representatives, WRDD officials, and the water committee members and one day training programme with the Government officials. 11.1.1 Meeting on Situation Analysis at the Office of the Water Resource Development Directorate Date: 30 th January 2009 Time: 12 noon Place: Office of the Executive Engineer (Agri-Mech), Barasat (Agri- Mech) Division Administrative building, Water Resources Development Directorate (WRDD) Barasat, Kolkata-700124 Meeting Proceedings The meeting was organized at WRDD office regarding situation analysis through Focus Group Discussion with the WRDD to assess the baseline condition and finalize the pilot site. 11.1.2 Brief of the Discussion The WRDD officials presented current status of the total numbers of existing RLI, and DTWs at Barasat I. According to their shared information the number of working DTW currently in Barasat I is 21. The officials also presented their departmental hierarchy and number of staff. They explained abundant human resources of the area as their strength. They expressed that the dual administration of operation and management unit is one of the weaknesses of the entire system. They considered that while the available natural resources can create an opportunity for further work, the rapid urbanization form a real threat. 11.1.3 Outcome of the discussion: A brief analysis of the current scenario was carried out in the meeting. The pilot sites for the project were finalized on that day and FGD documentation was prepared. 11.2 OVERVIEW OF FOCUS GROUP DISCUSSION WITH THE VILLAGERS AT BURRHO, BARASAT I The village ‘Borrho’ is situated at Kadambagachi Gram Panchayat in Barasat Block1, district 24 th Parganas North, West Bengal. The entire agricultural field in the village is fed by the Deep Tube Well Irrigation (DTW) system. The name of the DTW system is Sarebarya. The village population is dominated mainly by Muslim. Approximately 40 ha of land was determined as command area for cultivation during early 60’s. Meanwhile a cotton mill was established by the Aditya Birla Group in 1966, which resulted in 70% decrease in cultivated land area and now only 12 ha of land is under cultivation. But still the major occupation of the villagers is agriculture. The village consists of two localities namely, Page 143 Social Assessment of WBADMI Project Final Report 139 Bara-Dakshin Para and Biswas Para. There are 135 households in Bara-Dakshin Para, while, Biswas Para contains only 30 households. The major agro-production of the village is Boro Paddy (Winter Paddy) which occupies 5-6 ha of land and the remaining land is cultivated for some seasonal vegetables such as cabbage ( Brassica oleracea ), cauliflower ( Brassica campestris ), potato ( Solanum tuberosum ), tomato ( Lyicopersicon esculantum ) etc. Approximately 40 people are involved with Boro cultivation. The maximum land per capita is about 0.4 ha and the minimum land is about 0.15 ha for the landholders who utilize their lands for cultivations. 11.2.1 Date and Place of the Group Discussion with villagers at Borrho, Barasat I Date: 2 nd February, 2009 Time: 12.30 pm Place: Deep Tube Well- Sarebarya Village- Borrho Gram Panchayat- Kadambaghachi Block- Barasat 1 District- 24th Parganas North A focus group discussion was organized with water committee members in presence of the officials of WRDD department at Burrho village to know the current status of the water committee and the current water cultivation status as well. 11.2.2 Observation There is a five member Water Committee, which is formed by the villagers to sustain the system of DTW irrigation. The members of this committee are as follows: · Manirul Islam · Mehendi · Muffajal · Lal Mohammad · Abdul Malik Out of 5 members in the committee 3 members are from the same family. The president of the committee is Manirul Islam. The committee has hired a water man (pump operator) for regulating the water supply system for irrigation. The farmers give a nominal subscription of Rs. 10/- per month per household for meeting the expenditure of the waterman and others of the committee. It has been estimated from the survey that the approximate expenditure is Rs. 816/- per acre per month for watering in the field. The villagers are exclusively taking care of their irrigation system and monitoring the same frequently. During repairing of the system and channels, officials play a major role. Villagers also work on daily wages. Often the villagers also share the cost of repairing and cleaning of the channels. The villagers feel very proud about of the DTW system. They suggest for releasing more sub-channels mainly from 4 numbered channels which is effective for more than 30 acre of land. Page 144 Social Assessment of WBADMI Project Final Report 140 It appeared from the discussion with the villagers that they are not satisfied with the moisture conservation status of the soil. They require more water for cultivation. Majority of the villagers are interested for undergoing trainings for facilitating their irrigation and cultivation system. They have estimated that the current cost of the cultivation ranges from Rs. 4500/- to Rs. 5000/- per bigha per season but the market cost of the production is not rising satisfactorily. This is a major difficulty for the farmers of this village. Therefore, they are seriously worried regarding this issue. 11.2.3 Brief of the Discussion: The following topics were highlighted in the discussion · Current cultivation status · Status of water committee · Status of soil · Status of deep tube well irrigation · Cost of cultivation · Time table for cultivation of crops · Development of the irrigation system · Interest for taking training programme 11.2.4 Conclusion of the meeting: Most of the villagers had shown their interest in attending training programme for the sake of improvement of their skills. The analysis of the current circumstances made the situation transparent to the participants. Fig 1: Focus Group Discussion at Borrho Village Page 145 Social Assessment of WBADMI Project Final Report 141 Fig 2: Deep Tube Well Irrigation System (Sarebarya) Page 146 Social Assessment of WBADMI Project Final Report 142 Schematic Presentation of Sarebarya Deep Tube Well Irrigation System in Borrho Village Needs extension which covers 12 ha of land 4 Spout Structure 8 5 6 7 Deep Tube Well at Sarebaria 1 2 3 Page 147 Social Assessment of WBADMI Project Final Report 143 11.3 OVERVIEW OF FOCUS GROUP DISCUSSION WITH THE VILLAGERS AT KAPASIYA, BARASAT I The village Kapasiya is situated at Ahira Nilguange Gram Panchayat in Barasat Block1, 24 th Parganas North. The irrigation system of the village is based on River Lift Irrigation (RLI) from near Noyai cannel. The RLI system is in vogue since late 60’s. Earlier it was operated by diesel and since 1975 the system is operated by electricity. Total 300 households are there in the village. Approximately 250 households are Muslim by caste while 50 household are Hindu. Approximately, 28 ha of land is determined as command area for cultivation. This area is occupied by 150 landowners. The cultivation of the village are Borro Paddy (Winter Paddy) which is cultivated in 15 ha of land, mustard (Brassica juncea), Cabbage (Brassica oleracea), Cauliflower (Brassica campestris), Potato (Solanum tuberosum), Maize (Zea mays), Turnip (Brassica oleracea var. Capitata), Papaya (Carica papaya), etc. 11.3.1 Date and Place of the Group Discussion with villagers at Kapasiya, Barasat I Date: 3 rd February, 2009 Time: 3.30 pm Place: River Lift Irrigation - Noai Khal Village- Kapasiya Gram Panchayat- Ahira Nilguange Block- Barasat 1 District- 24 th Parganas North Another Focus group discussion was organized by IBRAD at Kapasiya Village to know the current status of the water committee and the current water utilization status. 11.3.2 Observation There is a water committee composed of villagers to organize the system of RLI irrigation sustainably. There are 9 members in this committee. The list of the members in this committee is as follows: · Saheed · Sirujal Haquek · Jiaul Rahaman · Ensar ali · Resaul · Dinaj Mohammad · Luthfar Rahaman · Siraj · Jakir Page 148 Social Assessment of WBADMI Project Final Report 144 The members of the committee conduct regular meetings with definite agenda and maintain minutes in the register. The president of the committee is Sirajul Haquek. The committee has hired a water man for regulating the watering system for irrigation. The villagers give a nominal subscription of Rs. 10/- per month per household of the farmers for meeting the expenditure of the waterman and others of the committee. It has been calculated that approximately Rs. 8.16/- is taken as the water tax per Satak. The villagers are very particular in taking care of the irrigation system, channels etc. Often they contribute for the repairing cost, cleaning cost etc. themselves. The villagers play the role of wage labourer during repairing of the irrigation channels or sub-channels. The villagers are quite proud of the RLI system. They suggest for releasing more sub channels, repairing of the channels and drains, cleaning of the filtrations and for taking permanent water man for regulating the watering system for irrigation. The members are continuously facing some difficulties, some times salinity of water posing some difficulties, getting subscription or contribution very irregularly etc. and are interested for receiving trainings for facilitating smooth running of their irrigation and cultivation system. 11.3.3 Discussion in meeting The meeting was initiated with the current cultivation status and the status of water Committees as well. The water committee members gave an idea about status of soil and status of Deep Tube Well Irrigation. The water committee members estimated the cost of cultivation. The representatives of the WRDD discussed various ways of development of the irrigation system. The participants from the water committee had shown interest for taking training and to form a group. 11.3.4 Outcomes of the meeting At the end of the meeting the current circumstances of the village and the water committee became clear. The participants themselves enlisted the names to form a group. The next date for the meeting was also fixed. Page 149 Social Assessment of WBADMI Project Final Report 145 Fig 3: Focus Group Discussion at Kapasiya Village Fig 4: River Lifting Irrigation System at Kapasiya Village Page 150 Social Assessment of WBADMI Project Final Report 146 Schematic Presentation of River lifting Irrigation System from Noyai Channel in Kapasyia Village 11.4 ONE DAY TRAINING ON PARTICIPATORY IRRIGATION MANAGEMENT FOR THE OFFICIALS OF WRDDDD, NORTH 24 PARGANAS AT IBRAD CAMPUS One day workshop was organized at IBRAD campus on 23 rd February from 10: 30 am to 5:30 pm. The training was initiated by National Anthem. It was further continued with welcome address and brief introduction of IBRAD by Ms. Raktima Mukherjee, Programme Director, IBRAD. A brief introduction of the project and the requirement of the training programme were elaborated by Prof. S.B. Roy, Chairman, IBRAD. Mr Biswanath Majumder started with the concept of the ADMI project, roles and responsibility of the concern persons who are supposed to be associated with the project. Fig 5: Address by Prof. S.B. Roy : Spout Structure Bansh Bagan Line 800 feet Line 9 10 11 1 6 1 1 1 1 1 1 12 4 8 5 6 Main Line Need Extension which cover s 7 ha River Lift Irrigati 1 7 3 2 Page 151 Social Assessment of WBADMI Project Final Report 147 After the tea break the first half of the training was started with the goal of the department and the constraints faced by the officials to achieve the goal. The second half of the training was mainly focused on the Strength, Weakness, Opportunity and Threat of the irrigation department. The participants identified the following strength, weakness, opportunity and threats of the aforesaid department 11.4.1 Strength · Young group of technical persons (Engineer/ O& M wing) · User friendly behavior from the bottom to top level · Scope of implementation of different new projects · Natural resources 11.4.2 Weakness · Dual administration of O & M unit · Generation of new implementation policy and percolation to the field level properly · Non review of different Government orders in the respect of the delegation of financial power · Time consuming decision · Lack of training opportunities · Lack of technically sound equipment · Lack of field level staff · Level of participation 11.4.3 Opportunity: · Rain water harvesting · Career development for the technical staff · To enhance the eco friendly technology · To recharge the ground water · Conjunctive use of ground water and surface water · Micro irrigation · Coordination between the BDO and the technical staff 11.4.4 Threats: Page 152 Social Assessment of WBADMI Project Final Report 148 · Over withdrawal of ground water · Leading to Arsenic and salinity · Rapid urbanization · Siltation need excavation · Obstruction due to the encroachment of the outsiders GroupWise SWOT Analysis is given in Table 11.1 in page no 14 to 16. 11.4.5 Formation of Blog: Sichuan 24 The participants and the resource persons decided to form a Blog as a plan of action of the training programme. The Blog will contain the following sections Fig 6: Blog Sinchan 24 · Articles · New photo gallery · Video clipping · Feedback · FAQ · Issues of the PIM · Photographs · New initiative 11.4.6 Evaluation At the end of the training programme the participants were given an evaluation form. The questions mentioned in the evaluation form are given in page no 12. Fig 7: Evaluation Report filling up by the participants Page 153 Social Assessment of WBADMI Project Final Report 149 Q1. Which part of the workshop did you find most helpful? Q2. Which part of the workshop did you find least helpful? Q3. Did you learn any specific thing from this workshop? If yes please specify. Q4. Kindly give your suggestion to make this kind of workshop more effective in future. Most of the participants considered, transaction analysis, SWOT analysis, logistics, infrastructure of the IBRAD campus, the concept of Knowledge Attitude Practices, Interaction during Group discussion most helpful part of the training programme Majority of the participants did not found any part of the training programme unnecessary. The participants mentioned in the evaluation form that they have learnt how to manage the ego state, emotion in the training programme by the transaction analysis. They have also learned the effective micro irrigation management. The officials suggested that in future the agenda of such kind of training workshop can be informed to its participants earlier. They also suggested including aspects of water resource as valuable topic. The participants also feel the need of the video clipping, and printed literature to make the training programme more fruitful. The participants want to participate in this kind of training work shop in future. 11.4.7 Way forward ™ Identification of village volunteers (SICO) from the command area of the selected RLI/DTW ™ Formation of SICO groups, initiation of SHG ™ Training for OCMs ™ Training of the SICO members on Institution building, conflict management ™ Identification of the weaker section and vulnerable groups and their inclusion with the groups. Fig 8: Participants involved in SWOT analysis Page 154 Social Assessment of WBADMI Project Final Report 150 Fig 9: Participants presenting SWOT analysis Page 155 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 1 5 1 T a b l e 1 1 . 1 G r o u p w i s e S W O T A n a l y s i s G r o u p n u m b e r N a m e o f t h e g r o u p m e m b e r S t r e n g t h W e a k n e s s O p p o r t u n i t y T h r e a t G r o u p 1 1 . M r . B i r a j R o y , 2 . M r . J a y a n t a S a n k a r C h a k r a b o r t y , 3 . M r . S a n t i K u m a r G h o s h , S A E 4 . M r . A s i t B o r a n C h a t t o p a d h y a y , 5 . M r . S a t t a b r o t o D e v , S A E 1 . T e c h n i c a l l y s o u n d h u m a n r e s o u r c e 2 . C o o p e r a t i v e i n n a t u r e 3 . G r a s s r o o t c o n t a c t f o r h e l p f u l d e v e l o p m e n t f o r o u r s o c i a l b e h a v i o r 4 . H o n e s t y a n d r e s p o n s i b i l i t y . 1 . R e s o u r c e s 2 . T e c h n i c a l i n s t r u m e n t a r e n o t s u f f i c i e n t 3 . Y o u t h 1 . D i f f e r e n t t y p e o f p r o j e c t a l r e a d y t a k e n 2 . T r a d i t i o n a l b e n e f i c i a r i e s 3 . C o n s u m p t i v e u s e o f g r o u n d w a t e r a n d s u r f a c e w a t e r 4 . C o n t r o l o f w a t e r s u p p l y b y m i c r o i r r i g a t i o n t o a v o i d l o s s e s o f w a t e r 1 . S a l i n i t y 2 . S i l t a t i o n 3 . O b s t r u c t i o n 4 . W a t e r r e s o u r c e s a r e n o t a v a i l a b l e i n d r y s e a s o n G r o u p 2 1 . M r . B i p u l S a r k a r 2 . M r . S a j a l K u n d u 3 . M r . A n i r u d h h a S a n y a l 4 . M s . A n i n d i t a M a n d a l 5 . M r . K a s i n a t h M a n d a l 1 . A v a i l a b i l i t y o f s u f f i c i e n t f u n d 2 . T e c h n i c a l k n o w h o w o f s t a f f i n c o n n e c t i o n w i t h r e l a t e d w o r k 3 . S h a r i n g o f k n o w l e d g e b e t w e e n y o u n g , e n e r g e t i c a n d e x p e r i e n c e s t a f f 4 . P o s s i b i l i t y o f g r o u n d w a t e r r e c h a r g e a n d r a i n w a t e r h a r v e s t i n g 1 . C o m m u n i c a t i o n g a p b e t w e e n G o v e r n m e n t a n d l o c a l b o d i e s a n d i n t e r G o v e r n m e n t b o d i e s i . e . W B S E D C L t d 2 . L . O . C i s n o t a v a i l a b l e t h r o u g h o u t t h e y e a r 3 . P o l i t i c a l i n t e r f e r e n c e 4 . S h o r t a g e o f e l e c t r i c i t y . 1 . P l e n t y o f f e r t i l e l a n d 2 . R o a d c o m m u n i c a t i o n 3 . A v a i l a b i l i t y o f m a r k e t 4 . M I e x c a v a t i o n f o r s t o r a g e o f w a t e r a n d i t s u s e f o r i r r i g a t i o n i n t h e s a l i n e z o n e 1 . D e p l e t i o n o f g r o u n d w a t e r l e v e l 2 . R a p i d u r b a n i z a t i o n 3 . R a p i d p o p u l a t i o n g r o w t h 4 . A r s e n i c a n d s a l i n i t y p r o b l e m Page 156 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 1 5 2 G r o u p n u m b e r N a m e o f t h e g r o u p m e m b e r S t r e n g t h W e a k n e s s O p p o r t u n i t y T h r e a t G r o u p 3 1 . M r . H i m a n s u S e k h a r M a j u m d e r 2 . M r . S u r a j i t B i s w a s 3 . M i s s R u m p a G h o s h 4 . M r . A m a n M a n d a l 5 . M r . S w a p a n K u m a r G u r i a 1 . M i x i n g o f y o u n g a n d m a t u r e d s t a f f 2 . O f f i c e i s s i t u a t e d i n s u c h a p l a c e t h a t w e c a n m o n i t o r t h e s c h e m e p r o p e r l y 1 . L a c k o f c o m m u n i c a t i o n b e t w e e n f a r m e r s a n d o f f i c e s t a f f a b o u t t h e n a t u r e o f c u l t i v a t i o n 1 . W e c a n m a k e s u r f a c e w a t e r s c h e m e w h e r e A r s e n i c a n d s a l i n i t y p r o b l e m i s t h e r e . 1 . N o n f u n c t i o n a l s c h e m e c a n b e r e j u v e n a t e d b y c h a n g i n g t h e m o d e o f o p e r a t i o n . 1 . O v e r d r a w l o f g r o u n d w a t e r r e s u l t s i n l o w e r i n g o f w a t e r l e v e l , s o d r o u g h t s i t u a t i o n w i l l c o m e n e a r f u t u r e a n d c o n c e n t r a t i o n o f A r s e n i c a n d f l u o r i d e i n c r e a s e i n g r o u n d w a t e r G r o u p 4 1 . M r . S h a n t a n u D a s 2 . M r . A v i j i t D a s g u p t a 3 . M r . N i k h i l C h a n d r a D a s 4 . M r . T a p a n K u m a r B h o w m i k 5 . M r . A j a y P a n d i t 6 . M r . U t p a l R o y 7 . M r . M a l o y B a n e r j e e 1 . O p t i m u m u t i l i z a t i o n o f n a t u r a l u n d e r g r o u n d r e s o u r c e s t o c r e a t e i r r i g a t i o n p o t e n t i a l 1 . L a c k o f d i v e r s i f i c a t i o n i n t h e s c o p e o f w o r k 2 . L a c k o f k n o w l e d g e a n d i n t e r e s t i n p a r t i c i p a t o r y i r r i g a t i o n m a n a g e m e n t c o n c e p t 1 . R a i n w a t e r h a r v e s t i n g 2 . R e c h a r g i n g o f g r o u n d w a t e r 1 . O v e r e x p l o i t a t i o n o f g r o u n d w a t e r a n d d e p l e t i o n o f g r o u n d w a t e r t a b l e G r o u p 5 1 . M r . S h y a m a l K u m a r D a s , E E ( A - I ) 2 . M r . G o u t a m B i s w a s , E E ( A - M ) 1 . A y o u n g g r o u p o f t e c h n i c a l p e r s o n s ( E n g i n e e r / O & M u n i t ) 2 . U s e r f r i e n d l y b e h a v i o r f r o m t o p t o b o t t o m l e v e l 1 . D u a l a d m i n i s t r a t i o n o f O & M u n i t . 2 . G e n e r a t i o n o f n e w i m p l e m e n t a t i o n p o l i c y a n d 1 . S c o p e o f p r o p e r u s e o f w a t e r r e s o u r c e s d e v e l o p m e n t a c t i v i t i e s 2 . P r o p e r u s e o f h u g e 1 . C o l l a p s e o f t o t a l W R D D w o r k s d u e t o d u e l a d m i n i s t r a t i o n 2 . S c o p e o f i n t e r f e r e n c e o f d i f f e r e n t g r o u p s G r o u p 5 3 . S c o p e o f i m p l e m e n t a t i o n o f d i f f e r e n t n e w p r o j e c t 4 . N a t u r a l r e s o u r c e s p e r c o l a t i o n t o f i e l d l e v e l p r o p e r l y 3 . N o n r e v i e w o f d i f f e r e n t G o v e r n m e n t o r d e r s i n r e s p e c t o f q u a n t i t y o f t e c h n i c a l p e r s o n n e l 3 . G o o d c e n t r a l i z e d p r o c u r e m e n t p o l i c y 3 . N o t c o n n e c t e d i n a n y w a y w i t h t h e p r o j e c t . Page 157 S o c i a l A s s e s s m e n t o f W B A D M I P r o j e c t F i n a l R e p o r t 1 5 3 G r o u p n u m b e r N a m e o f t h e g r o u p m e m b e r S t r e n g t h W e a k n e s s O p p o r t u n i t y T h r e a t d e l e g a t i o n o f f i n a n c i a l p o w e r 4 . V e r y s h o r t p e r i o d f o r f i e l d e x e c u t i o n 5 . E x p e r i m e n t a l a c t i v i t i e s 6 . T h e t i m e c o n s u m i n g d e c i s i o n G r o u p 6 1 . M r . S i d d h a r t h a R a y 2 . M r . C h a n c h a l B o s e 3 . M r . P r a d i p K r D a s g u p t a 4 . M r . A j o y C h a n c a s a t i 5 . . M r . M a l a y C h a n c a s a t i 1 . W R D D c o n s i s t s o f g o o d n u m b e r s o f e f f i c i e n t E n g i n e e r a n d T e c h n i c a l p e r s o n s 2 . G o o d n e t w o r k o f f i c e s t h r o u g h o u t t h e s t a t e 3 . D u e t o n a t u r e o f o u r w o r k w e a r e a c q u a i n t e d w i t h f a r m e r s d i r e c t l y . 1 . I n s u f f i c i e n t t r a i n i n g o p p o r t u n i t y o n d i f f e r e n t d i s c i p l i n e 2 . A d a p t a t i o n o f m o d e r n t e c h n o l o g y i s b e i n g h a m p e r e d 3 . I n a d e q u a t e r e s e a r c h a n d d e v e l o p m e n t a c t i v i t i e s w i t h t h e D e p a r t m e n t 1 . U n i r r i g a t e d l a n d i n s t a t e i s s t i l l l a r g e 2 . T o c o v e r m o r e a r e a s u n d e r i r r i g a t i o n 3 . I n c r e a s e o f i r r i g a t i o n e f f i c i e n c y 4 . C o n j u n c t i v e u s e o f s u r f a c e a n d g r o u n d w a t e r 5 . S c o p e o f u s e o f m i c r o i r r i g a t i o n s y s t e m s p e c i a l l y d r i p a n d s p r i n k l e r i s w i d e 1 . U s e o f u n d e r g r o u n d w a t e r i s r i s i n g d a y t o d a y t h u s s c a r c i t y o f g r o u n d w a t e r , i n c r e a s e o f s a l i n i t y a n d a r s e n i c c o n t a m i n a t i o n i s i n c r e a s i n g 2 . D e p l e t i o n o f g r o u n d w a t e r w i l l b e b e y o n d c o n t r o l 3 . I g n o r i n g s u s t a i n a b i l i t y w i l l b e d e t r i m e n t a l . Page 158 Social Assessment of WBADMI Project Final Report Table – 4.20 Salient Features of the State of West Bengal Administrative Information No of Sub-dividions 66 No. of Municipalities (2004) 120 No of Municipal Corporation (2004) 6 No of Blocks 341 No of Mouza 40782 No of Police Stations (2004) 456 No of Gram Panchayats 3354 Inhabited Villages(2001) 37945 Area (Sq. K.M.) 88752 No of Family Welfare Centre 506 No of PHCs 922 % of Electrified Villages 83.6 Electrified Household (%) (01.04.05) 24.34 Av. Population per Bank Offices (RBI-2005) 19000 Demography 1991 2001 Total 68077965 80176197 Male 35510633 41465985 Population Female 32567332 38710212 % Share in Country's Population 8.12 7.79 % share of Urban Population (India) 27.48 (25.73) 27.97 (27.82) % share of Rural Population (India) 72.52 (74.27) 72.03 (72.18) Hindus 74.72 (82.00) 72.47 (80.46) % share of major religious communities (India) Muslims 23.61 (12.12) 25.25 (13.43) % share of SC (India) 23.62 (16.48) 23.02 (16.2) % share of ST (India) 5.59 (8.08) 5.50 (8.2) % share of Children (0-6) 16.98 (17.94) 14.24 (15.93) All 917 (927) 934 (933) SC 931 (922) 949 (936) ST 964 (972) 982 (978) Sex Ratio (India) Children of (0-6) 967 (945) 960 (927) Population Density (per Sq. Km) (India) 767 (274) 903 (324) Decadal Growth rate (%) (India) 24.73 (23.85) 17.77 (21.34) Page 159 Social Assessment of WBADMI Project Final Report Employment 2001 Male Female Rural 54.1 (52.11) 20.9 (30.79) Work participation rate (India) Urban 53.7 (50.60) 11.6 (11.88) Rural 45.8 (44.51) 9.1 (16.77) % of main worker (India) Urban 50.2 (47.46) 9.2 (9.12) Rural 8.3 (7.85) 11.8 (14.21) % of marginal worker (India) Urban 3.6 (3.38) 2.4 (2.43) % of agricultural labourers 22.7 (20.82) 32.2 (39.43) No. of registration during the year through employment exch.(2004) 353944 No. of Placements effected during 2004 11530 Others Per Capita Income(2003-2004) at current prices (in Rs) 20895.64 % of cultivable area to total area(’04-’05) 65.48 Cultivable area per agri worker(’04-’05) ( hectres) 0.44 % of forest area(’04-’05) 13.52 % of BPL families( P&RD,2002 ) 36.38 Total 27.02 (26.10) Rural 31.85 (27.09) % of Population below poverty (1999-2000) (NSS) ( India) Urban 14.86 (23.62) 2003 313 No of Dowry Deaths 2004 386 2002-2003 16.36 % change in Dowry Deaths 2003-2004 22.32 Page 160 Social Assessment of WBADMI Project Final Report Education 1991 2001 Total 57.70 (52.21) 68.64 (64.8) Male 67.81 (64.13) 77.20 (75.3) Female 46.56 (39.29) 59.61 (53.7) Rural 50.50 (44.69) 63.42 (58.7) All Urban 75.27 (73.08) 81.25 (79.9) Total 42.21 (37.41) 59.04 (54.7 ) Male 54.55 (49.91) 70.54 (66.6) SC Female 28.87 (23.76) 46.90 (41.9) Total 27.78 (29.60) 43.40 (47.1) Male 40.07 (40.65) 57.38 (59.2) Literacy Rate (%) (India) ST Female 14.98 (18.19) 29.15 (34.8) Gender Gap in Literacy 21.25 (24.84) 17.41 (21.6) Primary Upper Primary No of Schools- SSA-2006 50255 (Govt.) 11440 (Govt / Govt aided) Pupil - Teacher Ratio(Govt)- SSA- ’06 45.20 61.41 Net Enrolment Ratio(overall) SSA’06 98.03 78.74 Drop Out Rate(Cohort study SSA 2004 ) 19.92 29.70 Page 161 Social Assessment of WBADMI Project Final Report Health 2003 46 (60) 2004 40 (58) Infant Mortality Rate (India) 2005 38 (58) Under five Mortality Rate (India) 1998-1999 67.6 (94.9) Maternal Mortality Rate (India) 1998 266 (407) Birth Rate (SRS ) 2003 20.3 (24.8) Death Rate (SRS) 2003 6.6 (8.0) Male 65 Life Expectancy(2001) Female 69 Male 24.7 (24.5) Mean age at Marriage (IIPS ) Female 18.5 (19.5) Beds per lakhs population(2003) 86 Sources : Publications of 2001 Population C ensus , Power Dept, B.A.E.& S., Ec on . Review(WB),Health on the March. HDRCC Page 162 Social Assessment of WBADMI Project Final Report Plate-1 Page 163 Social Assessment of WBADMI Project Final Report Plate-2 Page 164 Social Assessment of WBADMI Project Final Report Plate-3 Page 165 Social Assessment of WBADMI Project Final Report